Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD15-04501
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 1401 S ROBERT ST
Project NameWells Fargo Boise Center
Customer Number 
ePlanReviewYes
Description
(WELLS FARGO BOISE CENTER) Plan Modification 2 – at the basement area select nonbearing walls to create a IDE room, new ductless ac system in IDE room, relocate light fixture, some electrical work and refinish the training room area. JG 4-14-16 // Plan Modification 1 - walls near elevator lobby on 1st floor revised to 1-hour corridor rating, smoke dampers required on ducts penetrating shaft wall at corridor, enclosing shaft with 1-hour rating in basement, at shaft fire dampers required where duct penetrates basement rated wall and where ducts passes 1st floor ceiling. JG 3-28-16// Permit To remodel 582 sq. ft. of an existing bank service center office entry space on the main floor in an existing building with two stories and a basement. Approval is contingent upon adhering to the approved plans on file. Work is to include: removal of select; interior brick wall, select wall, exterior storefront door and glazing, entry column, acoustic ceiling and elevator smoke doors, construction of new select; interior nonbearing walls, storefront double doors, storefront windows, acoustic ceiling, entry columns, above entry cornice, light fixtures, electrical work, mechanical duct work and interior finishes in compliance with Ch. 8 of the 2012 IBC. NOTE: This building is fire sprinklered in the basement only. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/16/20169/19/2016 DONE
Second Notice 7/21/20168/11/2016 DONE
mailed 8-12-16
First Notice6/22/20166/22/20167/11/2016 DONE
DetailsJim Storey
Mailed 7-12
BLD-Final6/21/20166/22/20166/22/2016PPASS
DetailsJim Storey
Kevin Phone #: ###-####
DOC - Permit Finaled6/22/20166/22/20166/22/2016PPASS
DetailsJim Storey
FIRE-Final Inspection6/21/20166/22/20166/22/2016APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
FIRE-Final Inspection6/15/20166/16/20166/16/2016ACANC
DetailsTroy Cobbley
Need project related fire alarm permit addressed prior to a life safety inspection. I did note that atleast one fire extinguisher was expired.
BLD-Ceiling Grid Inspection5/20/20165/23/20165/23/2016APART
DetailsJim Storey
Kevin Phone #: ###-#### pending mech
BLD-Ceiling Grid Inspection5/20/20165/20/20165/20/2016PDEFR
DetailsJim Storey
Kevin Phone #: ###-#### out of time
BLD-Framing/Rough-in5/11/20165/11/20165/11/2016PPASS
DetailsJim Storey
Kevin Phone #: ###-#### walls ok
BLD-Framing/Rough-in5/10/20165/10/20165/10/2016PPASS
DetailsJim Storey
Kevin Phone #: ###-#### shaft bottom ok to cover
BLD-Framing/Rough-in4/22/20164/22/20164/22/2016PPASS
DetailsJim Storey
Kevin Phone #: ###-####
CHANGE STATUS TO (ISS)  4/22/2016 DONE
(F) Reprint permit  4/22/2016 DONE
OVERRIDE  4/14/2016  
Plan assigned to (JG)4/7/20164/7/20164/14/2016 PASS
DetailsJavier Guzman
Plan Mod. - ePlanReview - Wells Fargo
Routing - PLAN CHECK4/8/2016 4/14/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/14/2016 DONE
Permit Ready to Issue  4/14/2016 DONE
DO NOT RE-ISSUE- plan mod fees due
Routing - FIRE4/8/20164/8/20164/11/2016 PASS
DetailsKatie Marron
Modifications will require a separate Fire Sprinkler permit. Revised report attached to case.
Plan Modification Accepted  4/7/2016 DONE
DetailsChristina Prado
Per Rachel at Arch firm, started to add scop eto lower level of building
OVERRIDE  3/28/2016  
Plan assigned to (JG)3/24/20163/24/20163/28/2016 PASS
DetailsJavier Guzman
Plan Mod. - ePlanReview - Wells Fargo Boise Center
Routing - PLAN CHECK3/25/2016 3/28/2016 PASS
DetailsJavier Guzman
Plan Modification Accepted  3/24/2016 DONE
DetailsChristina Prado
Plan Mod to update first floor shaft enclosure
BLD-Framing/Rough-in2/22/20162/23/20162/23/2016APART
DetailsJim Storey
Partial framing, exterior only - Kevin Phone #: ###-#### extreior ft and faming ok to cover// interior arch to field review unproteced chase at east entry for shaft requriments and submit to planreview.
Inspection Record Card- Bld  2/11/2016 DONE
Issue PAID IN FULL permit  2/11/2016 DONE
OVERRIDE  1/27/2016  
Plan assigned to (JG)12/24/201512/24/20151/27/2016 PASS
DetailsJavier Guzman
1st review completed, 1/19 Level 3 TI - ePlanReview - Wells Fargo Boise Center
Routing - PLAN CHECK1/27/2016 1/27/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/27/2016 DONE
Permit Ready to Issue  1/27/2016 DONE
DetailsChristina Prado
Need RP, GC & Revised certificate of value for issuance
Route to Impact Fee Review1/14/20161/17/20161/19/2016 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK12/24/2015 1/14/2016 FAIL
DetailsJavier Guzman
ePlan
1st review completed  1/14/2016 FAIL
DetailsJavier Guzman
Routing - Erosion and Sediment12/24/2015 12/28/2015 PASS
DetailsAndy J. Long
Interior and exterior TI in existing space. ESC plan submittal waiver approved. RP to be designated.
Routing - FIRE12/24/201512/24/201512/24/2015 PASS
DetailsKatie Marron
Comments attached to case.
Pending Assignment by JCB12/24/2015 12/24/2015 DONE
DetailsJason Blais
Routing - Design Review12/24/2015 12/24/2015 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH15-00427
Intake Approval  12/23/2015 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard and plan review fees paid.
Application received  12/22/2015 DONE
Application submitted via PDS Online on Dec 22 2015 2:50PM