Case Summary (BLD) | | | 5/25/2017 | | DONE |
|
|
|
|
BLD-Final | 2/6/2017 | 2/7/2017 | 2/7/2017 | A | PASS |
Tony Young
|
|
|
chris Phone #: ###-####, ok per plan,, 325
|
DOC - Permit Finaled | 2/7/2017 | 2/7/2017 | 2/7/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PART |
Tony Young
|
|
|
chris Phone #: ###-####,, walk through,, needs fire caulking, etc
|
BLD-Aging Inspection | 1/11/2017 | 1/11/2017 | 1/17/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/10/2017 | 1/10/2017 | 1/11/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 9/30/2016 | 10/3/2016 | 10/3/2016 | P | PASS |
Tony Young
|
|
|
would like call ahead; Clayton Phone #: ###-####,, ?s pool enclosure
|
BLD-Foundation | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PEND |
Tony Young
|
|
|
Clayton-reinforced concrete for a cantilever deck Phone #: ###-####,, inspected by 3rd party special inspector and concrete cylinders taken,, pending report
|
BLD-Energy code compliance | 8/26/2016 | 8/29/2016 | 8/29/2016 | A | PASS |
Tony Young
|
|
|
Clayton Phone #: ###-####
|
BLD-Energy code compliance | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | PART |
Tony Young
|
|
|
Clayton Phone #: ###-####,, needs 6 sided coverage on vertical walls,, all else ok
|
BLD-Framing/Rough-in | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | PASS |
Tony Young
|
|
|
Clayton Phone #: ###-####,, ok to insulate
|
BLD-Wall Bracing | 7/26/2016 | 7/27/2016 | 7/27/2016 | A | PART |
Tony Young
|
|
|
Clayton Phone #: ###-####,,, ext shear ok
|
Routing - PLAN CHECK | 7/13/2016 | | 7/15/2016 | | PASS |
Tisha Gallop
|
|
|
per Clayton Conner added value for cantilevered slab and glass guardrail is $25,000
|
Routing Off Site - STRUCTURAL | 7/13/2016 | | 7/15/2016 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 7/15/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2016 | | DONE |
|
|
|
1 hr admin fee
|
CHANGE STATUS TO (ISS) | | | 7/15/2016 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 7/15/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/13/2016 | | DONE |
|
|
|
received ES report for glass guardrail and engineering calcs for slab via e-mail.
|
Plan Modification Accepted | | | 7/12/2016 | | DONE |
|
|
|
plan mod to add cantillevered concrete patio in two areas and glass guardrail.
|
Routing - PLAN CHECK | 7/12/2016 | | 7/12/2016 | | FAIL |
Tisha Gallop
|
|
|
plan modification. Need engineering calcs for cantillevered concrete slabs and Idaho engineering for glass guardrail showing safety factor of 4 per IRC Table 301.5 footnote H. Called Chis Connor and told him items requrested.
|
BLD-Footing | 5/2/2016 | 5/2/2016 | 5/2/2016 | P | DONE |
Mike Jordan
|
|
|
Cal Phone #: ###-####. Concrete aleady placed when on site. concrete crew already gone.
|
BLD-Footing | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PART |
Tony Young
|
|
|
Cal Phone #: ###-####,, rear addition footings ok
|
PubWorks Subgrade Approval | 4/4/2016 | 4/4/2016 | 4/4/2016 | | DONE |
Jason C. Taylor
|
|
|
**ADDITION ONLY- NO RETAINING WALLS OR POOL FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 1/20/2016 | | |
|
|
|
|
Telephone call | | | 1/20/2016 | | DONE |
|
|
|
Spoke with Chris informing him that the plans are ready to be picked up and, per Tisha, there are no fees due
|
CHANGE STATUS TO (ISS) | | | 1/20/2016 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 1/20/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/15/2016 | | 1/20/2016 | | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 1/20/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/20/2016 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD. no fees per Tisha
|
Plan assigned to (LEG) Tisha | 1/7/2016 | | 1/20/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 1/14 (plan check, plannng appeal perior 1/20) walk-in received 1/7; house only
|
Routing - FIRE | 1/15/2016 | 1/15/2016 | 1/15/2016 | | PASS |
Katie Marron
|
|
|
Plans reviewed for fire department access and fire hydrant availability. Modifications do not alter either, so ok under previous approval. Addition must be built to current code and current defensible space requirements must be maintained.
|
1st review completed | | | 1/14/2016 | | FAIL |
Tisha Gallop
|
|
|
pending approval by Plan Check and Planning (appeal period up 1/20/16)
|
Routing Off Site - STRUCTURAL | 1/8/2016 | | 1/14/2016 | | CANC |
Tisha Gallop
|
|
|
See Bld16-000118
|
Routing - PLAN CHECK | | | 1/14/2016 | | FAIL |
Tisha Gallop
|
|
|
e-mailed comments to Chris Connor
|
Routing PW Grading-Hillside | 1/13/2016 | | 1/13/2016 | | PASS |
Jason C. Taylor
|
|
|
*RESIDENT FOOTING ONLY**NO RETAINING WALL STRUCTURE HAS BEEN APPROVED***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing PW Grading-Hillside | 1/8/2016 | | 1/12/2016 | | FAIL |
Jason C. Taylor
|
|
|
Grading plan has grading across property line onto neighbors property. Need updated grading plan or access agreement. Jason Taylor ###-####
|
Telephone call | | | 1/8/2016 | | DONE |
|
|
|
Called Action Couriers to pick up
|
Telephone call | | | 1/8/2016 | | DONE |
|
|
|
called Chris Conner and sent e-mail need additional information to do review.
|
Routing - PLANNING | 1/8/2016 | | 1/8/2016 | | PASS |
Celine Acord
|
|
|
Phase 1 (interior work) allowed until appeal period lapses (Jan 19 2016)
|
Plan Modification Accepted | | | 1/7/2016 | | DONE |
Tisha Gallop
|
|
|
for house addition, remodel and retaining walls (retaining walls sent to outside structural)
|
OVERRIDE | | | 12/28/2015 | | |
|
|
|
|
Telephone call | | | 12/28/2015 | | DONE |
Christina Prado
|
|
|
Called Chris to advise permit is ready and gave fees due
|
Issue PAID IN FULL permit | | | 12/28/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/23/2015 | | 12/28/2015 | | PASS |
Andy J. Long
|
|
|
ESC site map and SWPPP narrative approved. Designated RP and PD. Approved to start construction up permit issuance.
|
Plan assigned to (LEG) Tisha | 12/23/2015 | | 12/28/2015 | | DONE |
Tisha Gallop
|
|
|
phase I - Per LEG
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/28/2015 | | DONE |
|
|
|
|
1st review completed | | | 12/28/2015 | | DONE |
Tisha Gallop
|
|
|
Per LEG
|
Permit Ready to Issue | | | 12/28/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing Walk-In (BLD) | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | PASS |
Tisha Gallop
|
|
|
for Phase I, interior work only.
|
Inspection Record Card- Bld | | | 12/23/2015 | | DONE |
|
|
|
|
Application received | | 12/23/2015 | | | |
|
|
|
|