First Notice | | 1/9/2017 | 1/10/2017 | | DONE |
|
|
|
Mailed 1-11
|
Permanent Occupancy | | | 12/30/2016 | | DONE |
|
|
|
|
BLD-Final | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 11/7/2016 | 11/7/2016 | 11/7/2016 | P | PART |
Phil Shearer
|
|
|
John Phone #: ###-####. OK for 30 day temp, Toilet flusher on wrong side of tank ADA bathroom
|
Temporary Occupancy | 11/7/2016 | 2/5/2017 | 11/7/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Override - Parcel Holds | | | 11/7/2016 | | |
|
|
|
|
BLD-Final | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | FAIL |
Mike Jordan
|
|
|
John// please call ahead Phone #: ###-####. Provide ADA bathroom signs on wall at restroom, provide mirror in restroom, install the required vertical grab bars in restroom and provide flusher on turning side.
|
BLD-Final | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | FAIL |
Mike Jordan
|
|
|
Cathy Phone #: ###-####. No city approved plans or review notes on site. Called Cathy to let her know. Will have to reschedule.
|
Print Occupancy Form | | | 11/2/2016 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2016 | | DONE |
|
|
|
John from Wood Brothers called-said someone other Wood Brothers is calling in inpsection when they're not ready-wants us to call him to verify that the inspection is truely needed-John Mchugh ###-####
|
FIRE-Final Inspection | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide occupant load sign, provide single action hardware on the restroom doors, mount the fire extinguishers, remove hardware from the west front door. Provide the fire review comments.
|
FIRE-Final Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide the fire life safety review comments, provide occupant load sign, provide panic hardware on front and back doors, provide exit discharge lighting at front and back doors, provide emergency lighting, provide single action hardware for the restroom doors, mount the fire extinguishers, disable and remove hardware on the west/front door as per approved plans.
|
BLD-Framing/Rough-in | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Roof trusses wrapped.
|
BLD-Framing/Rough-in | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Needs to wrap roof trusses going through 2hr. wall. Ecerything else ok.
|
BLD-Framing/Rough-in | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | NR |
Jim Sly
|
|
|
John Phone #: ###-#### Called John and told him that an Electrical rough-in was performed.
|
(F) Reprint permit | | | 7/12/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/12/2016 | | DONE |
|
|
|
Plan Mod
|
Plan assigned to (CDM) | 6/28/2016 | 6/28/2016 | 7/11/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/11/2016 | | 7/11/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 7/9/2016 | | 7/11/2016 | | PASS |
Rachael Beierle
|
|
|
review plan mod. fixtures moved, but count stays the same per rating.
|
Case Summary (BLD) | | | 7/11/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/11/2016 | | DONE |
|
|
|
plan mod-PLEASE DO NOT RE ISSUE
|
Telephone call | | | 7/11/2016 | | DONE |
|
|
|
caleed Brent to let know plan mod is ready and how much is owed-left message on his phone
|
BLD-Framing/Rough-in | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. All fire stopping completed on interior side.
|
BLD-Framing/Rough-in | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PASS |
Mike Jordan
|
|
|
Cory Phone #: ###-####. Face layer of 5/8 type x ok. ok to to cover interior portion of wall with base layer.
|
Plan resubmittals received | | | 7/6/2016 | | DONE |
|
|
|
Two copies of sheets A0.0, A1.0 and A2.0. Taken to Carl M
|
BLD-Framing/Rough-in | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Mike Jordan
|
|
|
Drywall inspection ###-#### John
|
BLD-Wall cover | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. interior side of 2hr. fire barrier. work in progress.
|
Plan Modification Accepted | | | 6/28/2016 | | DONE |
|
|
|
received plan mod application and 2 sets of sheets A1.0 & A2.0- put on Carls' desk
|
BLD-Framing/Rough-in | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | CANC |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Energy code compliance | 6/23/2016 | 6/23/2016 | 6/23/2016 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. contractor to follow approved plan for 2hr. fire barrieer walls,r provide new UL approved detail and show approved method for wood truss penetration.
|
Permit Ready to Issue | | | 6/3/2016 | | DONE |
|
|
|
MET
|
Print Occupancy Form | | | 6/3/2016 | | DONE |
|
|
|
|
Telephone call | | | 6/3/2016 | | DONE |
|
|
|
Left a message for Eugene informing him this permit is ready, the fees due and that he will need to get his sewer permit with West Boise.
|
Issue PAID IN FULL permit | | | 6/3/2016 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 1/21/2016 | 1/21/2016 | 6/2/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed. Level 3 TI - Paper - Club 208
|
Routing - PLAN CHECK | 5/23/2016 | | 6/2/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/2/2016 | | 6/2/2016 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 6/2/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/23/2016 | | DONE |
|
|
|
received (2) sets of plans; (M1.0), (M2.0)
|
Routing - MECHANICAL | 5/16/2016 | | 5/18/2016 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 5/16/2016 | | DONE |
|
|
|
One copy of M1.0 and M2.0. When asked if had a second copy gal stated Carl already had it. Taken to Carl M
|
Plan resubmittals received | | | 5/13/2016 | | DONE |
|
|
|
resubmittals recieved 1 set of sheets M1.0 & M2.0-took to Carl M
|
Plan resubmittals received | | | 5/3/2016 | | DONE |
|
|
|
received (2) sets of ComCheck
|
Routing - FIRE | 3/28/2016 | 3/28/2016 | 3/28/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - PLAN CHECK | 2/17/2016 | | 3/28/2016 | | FAIL |
Carl D Madsen
|
|
|
E-Mailed plan review report to Bryan Smith and Select Property Management.
|
Routing - PUBLIC WORKS | 3/17/2016 | | 3/18/2016 | | PASS |
Rachael Beierle
|
|
|
Sewer permit must be paid at West Boise Sewer District.
|
Routing - PLUMBING | 3/18/2016 | | 3/18/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Plan resubmittals received | | | 3/17/2016 | | DONE |
|
|
|
Three copies of sheet A0.0, A1.0 and A2.0. Taken to Carl M
|
Routing - FIRE | 2/16/2016 | | 2/17/2016 | | FAIL |
Scott Arellano
|
|
|
Same comments as IBC reviewer on emergency lighting, egress door issues and occupant sign. Report attached to plans.
|
1st review completed | | | 2/17/2016 | | FAIL |
|
|
|
Failed Plan Check and Fire.
|
Routing - PLANNING | 1/21/2016 | | 2/17/2016 | | PASS |
Ted Vanegas
|
|
|
Ted Vanegas - CUP15-00080
|
Routing - PLAN CHECK | | | 2/16/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Addressing | 1/21/2016 | | 1/21/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | | | 1/21/2016 | | PASS |
|
|
|
|
Routing - PLUMBING | 1/21/2016 | | 1/21/2016 | | CANC |
Bill VanDegrift
|
|
|
no plans no rview
|
Plan Reviewer's activity | | | 1/21/2016 | | DONE |
Jason Blais
|
|
|
Emailed applicant and engineer to contact ACHD to determine if any additional impact fees are due. Will need written verification to be provided to our Permit Counter prior to the building permit being issued.
|
Pending Assignment by JCB | 1/15/2016 | | 1/21/2016 | | DONE |
Jason Blais
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/15/2016 | | DONE |
|
|
|
|
Intake Approval | | | 1/15/2016 | | PASS |
|
|
|
as per Carl Westfall
|
Plans ACCEPTED BY PLAN TECH | | | 1/15/2016 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/15/2016 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 1/5/2016 | | FAIL |
|
|
|
See plan intake checklist
|
Intake Approval | | | 12/24/2015 | | FAIL |
|
|
|
See plan intake checklist
|
Application received | | 12/24/2015 | | | |
|
|
|
|
Routing - PLAN CHECK | 6/28/2016 | | | | |
Carl D Madsen
|
|
|
|