BLD-Final | 7/18/2016 | 7/19/2016 | 7/19/2016 | A | PASS |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
DOC - Permit Finaled | 7/19/2016 | 7/19/2016 | 7/19/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/18/2016 | 2/19/2016 | 2/19/2016 | P | CANC |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
BLD-Wall cover | 2/18/2016 | 2/19/2016 | 2/19/2016 | P | PASS |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
BLD-Footing | 1/8/2016 | 1/11/2016 | 1/11/2016 | A | PART |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
OVERRIDE | | | 1/8/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 1/8/2016 | 1/8/2016 | 1/8/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 1/8/2016 | 1/8/2016 | 1/8/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 1/8/2016 | | 1/8/2016 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2016 | | DONE |
|
|
|
|
1st review completed | | | 1/8/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/8/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 1/8/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 12/24/2015 | 12/24/2015 | 12/24/2015 | A | FAIL |
Brian McGowan
|
|
|
No floor plan or foundation plan. Engineering required for 16' tall walls.
|
1st review completed | | | 12/24/2015 | | FAIL |
Brian McGowan
|
|
|
No floor plan or foundation plan. Engineering required for 16' tall walls.
|
Routing - PLAN CHECK | 12/24/2015 | | 12/24/2015 | | FAIL |
Brian McGowan
|
|
|
No floor plan or foundation plan. Engineering required for 16' tall walls.
|
Application received | | 12/24/2015 | | | |
|
|
|
|