Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD15-04541
StatusFinaled
Name DARRELL WICKHAM
Site Address 9140 W EMERALD ST STE Unit: 110
Project NameDrug Test of Idaho Suite 110
Customer NumberBLD15-04542
ePlanReviewNo
Description
(DRUG TEST OF IDAHO)**plan modification for mechanical changes** 2/26/16 ajs**Tenant improvement for build out of a vanilla finish created under BLD04-00676. Scope of work to include interior nonbearing partition walls to create 2 offices, storage and utility area, 3 restrooms, reception and waiting area. This tenant space only requires 1 ADA compliant restroom. The additional restrooms are added for the function of the business. New ceiling grid and lighting to be installed. Permits required for plumbing and mechanical and electrical work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **AJS**

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/31/2017 DONE
Telephone call  8/16/2016 DONE
customer called said he paid final values on 8/2/16-i removed the open 3rd notice so he would not get another notice
Third Notice 7/19/20168/11/2016 DONE
Print Statement  7/18/2016 DONE
Second Notice 6/20/20167/14/2016 DONE
Mailed 7-15-16
First Notice 5/21/20166/10/2016 DONE
Mailed 6-13-16
BLD-Final5/10/20165/11/20165/11/2016APASS
DetailsMike Jordan
Darrell/ please call 30 min prior Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection5/10/20165/11/20165/11/2016APASS
DetailsTroy Cobbley
Life safety passed
Permanent Occupancy  5/11/2016 DONE
BLD-Ceiling Grid Inspection4/28/20164/28/20164/28/2016PPASS
DetailsMike Jordan
Call before // Darrell Phone #: ###-####
BLD-Framing/Rough-in3/25/20163/25/20163/25/2016PPASS
DetailsMike Jordan
would like a call two hours before you head out there // Darrell Phone #: ###-####. Received letter from architect stating that the indoor fancoil unit installed and supported by the roof truss system is acceptable. Will have letter scanned into case.
BLD-Framing/Rough-in3/4/20163/7/20163/7/2016ADONE
DetailsMike Jordan
would like call ahead; Darrell Phone #: ###-####
BLD-Framing/Rough-in3/4/20163/4/20163/4/2016PPASS
DetailsMike Jordan
Darrell Phone #: ###-####. Interior wood framed walls only. No grid. Stiil need engineering for HVAC support of floor joist.
BLD-Framing/Rough-in3/1/20163/2/20163/2/2016PFAIL
DetailsMike Jordan
would like call ahead; Darrell Phone #: ###-####. Foam all top plate penetrations in wood stud wall. Provide engineering to show that bottom chords of roof joist will support the suspended HVAC ubit.
CHANGE STATUS TO (ISS)  3/1/2016 DONE
(F) Reprint permit  3/1/2016 DONE
Plan assigned to (AJS)2/10/20162/10/20162/26/2016 PASS
DetailsAdele J Schaffeld-Griffin
plan mod review completed
Routing - MECHANICAL2/25/2016 2/26/2016 PASS
DetailsTroy James
Routing - PLAN CHECK2/26/2016 2/26/2016 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  2/26/2016 DONE
Permit Ready to Issue  2/26/2016 DONE
****requirements met CAN****Need Revised Cert of Value DO NOT RE ISSUE PLAN MOD
Print Occupancy Form  2/26/2016 DONE
Telephone call  2/26/2016 DONE
called Darrell to let know permit is ready and how much is owed-please do not re-issue-print new permit-have customer sign
Plan resubmittals received  2/25/2016 DONE
received two copies of sheet A-3.0- gave to Adele
Routing - PLAN CHECK2/11/2016 2/16/2016 FAIL
DetailsAdele J Schaffeld-Griffin
pending mechanical
Routing - MECHANICAL2/11/2016 2/11/2016 FAIL
DetailsTroy James
emailed corrections to applicant
Plan Modification Accepted  2/10/2016 DONE
plan mod received 2 sets of sheet A-3.0 & air system sizing summary-took to Adele
Issue PAID IN FULL permit  1/11/2016 DONE
Plan assigned to (AJS)12/31/201512/31/20151/6/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK1/5/2016 1/6/2016 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  1/6/2016 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  1/6/2016 DONE
Permit Ready to Issue  1/6/2016 DONE
NEED GC form and certificate of value from GC
Print Occupancy Form  1/6/2016 DONE
Telephone call  1/6/2016 DONE
called Jerrod- let him know building permit was ready and need GC form and Certificate of value-- also let him know Early start is ready, fees due, and need GC form
1st review completed  1/6/2016 DONE
DetailsJason Blais
Routing - PUBLIC WORKS12/31/2015 1/5/2016 PASS
DetailsJennifer Bruner
Routing - Addressing12/31/2015 1/4/2016 PASS
DetailsLaura Hunter
Plans ACCEPTED BY PLAN TECH  12/31/2015 DONE
Intake Approval  12/31/2015 PASS
Recd Pcfee & Taken To Pln CK  12/31/2015 DONE
Application received 12/31/2015