FIRE-Final Inspection | 8/4/2016 | 8/5/2016 | 8/5/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, noted that some of the interior doors have existing round knob type door hardware, no fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.
|
BLD-Final | 6/23/2016 | 6/24/2016 | 6/24/2016 | P | NR |
Jim Storey
|
|
|
Oscar Phone #: ###-####
|
FIRE-Final Inspection | 6/23/2016 | 6/24/2016 | 6/24/2016 | A | FAIL |
Katie Marron
|
|
|
The following correction items need to be completed: -"Door to remain unlocked..." sign front door - All Fire Extinguisher to be inspected (expire end of June) - Exit signs leading into dock/warehouse to be removed (two of them, from break room and from dispatch) - Knob turn hardware to be replaced with lever hardware at designated exits (two of them: one from breakware and exit from warehouse/dock)
|
Telephone call | | | 6/23/2016 | | DONE |
|
|
|
Left a message for Oscar and spoke to Brett informing them this permit is going to expire in 9 days and if the space is being occupied by SAIA Motor Friegth then the permit needs to be picked up and the required inspections need to be completed.
|
Issue PAID IN FULL permit | | | 6/23/2016 | | DONE |
|
|
|
|
Expiration Notice | 6/7/2016 | 6/28/2016 | 6/7/2016 | | DONE |
Brittany Hill
|
|
|
|
Permit Ready to Issue | | | 1/11/2016 | | DONE |
|
|
|
All Met
|
Print Occupancy Form | | | 1/11/2016 | | DONE |
|
|
|
|
Telephone call | | | 1/11/2016 | | DONE |
|
|
|
Left a message for Oscar informing him that the permit is ready to be picked up and who ever he sees will go over the inspections that are needed for the occupancy
|
Plan assigned to (TLW) | 1/4/2016 | | 1/8/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 1/4/2016 | | 1/8/2016 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 1/8/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/8/2016 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/4/2016 | | DONE |
|
|
|
|
Intake Approval | | | 1/4/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/4/2016 | | DONE |
|
|
|
|
Application received | | 1/4/2016 | | | |
|
|
|
|