Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00004
StatusFinaled
Name FOUR CORNERS CARPENTRY LLC
Site Address 2009 N 26TH ST
Project NameNew Build 2009 26th St.
Customer NumberBLD16-00046 DEMO
ePlanReviewYes
Description
Plan Mod 4/26/16 to convert bonus room above garage into a master bedroom with bathroom. Also, modify the front the front porch framing. **DAF**Permit for the construction of a new 4135 sq. ft., two story (first story 2177 sq. ft., second story 1958 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 663 sq. ft. of covered patio/porch and a 876 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. DAF
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/19/2017 DONE
Didn't save correctly. Pulling for TruePoint report example. BM
Case Summary (BLD)  6/15/2017 DONE
Letter of compliance/Occupancy  9/28/2016 DONE
Telephone call  9/28/2016 DONE
Pioneer Title called asked for the C of O so I emailed it to them
BLD-Final9/21/20169/22/20169/22/2016APASS
DetailsJim Storey
Daniel Phone #: ###-####
DOC - Permit Finaled9/22/20169/22/20169/22/2016PPASS
DetailsJim Storey
BLD-Final9/16/20169/16/20169/16/2016PFAIL
DetailsTony Young
Mark Phone #: ###-####,, correction notice posted
BLD-Energy code compliance5/10/20165/11/20165/11/2016APASS
DetailsDave Hannah
Mark Phone #: ###-####
BLD-Framing/Rough-in5/9/20165/9/20165/9/2016PPASS
DetailsTony Young
Mark Phone #: ###-####
OVERRIDE  4/27/2016  
Plan assigned to (DAF)4/25/20164/25/20164/27/2016 DONE
DetailsDavid Ferguson
Plan Mod review complete - waiting for Troy to approve Manual J
CHANGE STATUS TO (ISS)  4/27/2016 DONE
DetailsChristina Prado
Routing - MECHANICAL4/26/2016 4/27/2016 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  4/27/2016 DONE
Permit Ready to Issue  4/27/2016 DONE
DetailsChristina Prado
All requirements met
Routing - PLAN CHECK4/26/2016 4/26/2016 PASS
DetailsDavid Ferguson
Routing - PLANNING4/26/2016 4/26/2016 PASS
DetailsSue Cummings
Plan Modification Accepted  4/25/2016 DONE
DetailsChristina Prado
As requested by builder to update the gable entry
Plan Modification Accepted  3/17/2016 DONE
new manual j report
Routing - MECHANICAL3/17/2016 3/17/2016 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing3/9/20163/9/20163/9/2016PPASS
DetailsJim Sly
Frank Phone #: ###-####
Case Summary (BLD)  2/22/2016 DONE
BLD-Foundation1/26/20161/26/20161/26/2016PPASS
DetailsJim Sly
Terry Phone #: ###-####
BLD-Footing1/22/20161/25/20161/25/2016APASS
DetailsTony Young
Mark Phone #: ###-####
Issue PAID IN FULL permit  1/21/2016 DONE
DetailsChristina Prado
Inspection Record Card- Bld  1/21/2016 DONE
DetailsChristina Prado
Inspection Record Card- Bld  1/21/2016 DONE
DetailsChristina Prado
OVERRIDE  1/20/2016  
Plan assigned to (DAF)1/13/20161/13/20161/20/2016 DONE
DetailsDavid Ferguson
due 1/25 ePlan - Review completed on 1/19 - designer to address several changemarks.
Routing - PLAN CHECK1/20/2016 1/20/2016 PASS
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  1/20/2016 DONE
Permit Ready to Issue  1/20/2016 DONE
DetailsChristina Prado
Need to verify GC (app states different company that listed RCE number) prior to issuance
1st review completed  1/19/2016 FAIL
DetailsDavid Ferguson
Routing - PLAN CHECK1/11/2016 1/19/2016 FAIL
DetailsDavid Ferguson
Plan assigned to (LEG) Tisha1/11/2016 1/13/2016 DEFR
DetailsTisha Gallop
Routing - MECHANICAL1/13/2016 1/13/2016 PASS
DetailsTroy James
Route to Impact Fee Review1/11/20161/14/20161/12/2016 PASS
DetailsCindy M. Gould
Routing - MECHANICAL1/11/2016 1/12/2016 FAIL
DetailsTroy James
Emailed corrections to Osprey.
Routing - PLANNING1/11/2016 1/11/2016 PASS
DetailsSue Cummings
Routing - Addressing1/11/2016 1/11/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/11/2016 1/11/2016 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  1/11/2016 DONE
DetailsChristina Prado
Intake Approval  1/11/2016 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  1/11/2016 DONE
DetailsChristina Prado
Application received  1/4/2016 DONE
Application submitted via PDS Online on Jan 4 2016 10:31AM