Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00026
StatusFinaled
Name ACTION RETAIL CONSTRUCTION SEVICES
Site Address 350 N MILWAUKEE ST Unit: 2147
Project NameBTS - #2147 Torrid
Customer Number 
ePlanReviewYes
Description
(TORRID– BTS SPACE # 2147) Permit is to remodel an existing 3,564 square foot tenant space. Approval is contingent upon adhering to the approved plans on file. Scope of work includes: Removal of select interior nonbearing walls, construction of new select interior nonbearing walls to create (5) fitting rooms, a fitting alcove, a demising wall at front sales area, a stockroom area and a 1 hour demising wall at old storefront entrance (fitting/mall concourse area), new acoustic ceiling in fitting rooms, ADA compliant drinking fountain, a new mop sink, new accessible counter, new lighting, electrical work, plumbing work, mechanical ductwork and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/22/20164/19/2016 DONE
This permit finaled on the web by Jane Chism
First Notice 4/8/20164/12/2016 DONE
BLD-Final3/28/20163/29/20163/29/2016APASS
DetailsMike Jordan
Roger Phone #: ###-####. Ok for perm occ.
Print Occupancy Form  3/29/2016 DONE
Permanent Occupancy  3/29/2016 DONE
FIRE-Final Inspection3/28/20163/28/20163/28/2016PPASS
DetailsTroy Cobbley
life safety passed
BLD-Ceiling Grid Inspection3/7/20163/7/20163/7/2016PPASS
DetailsMike Jordan
Roger Phone #: ###-####
BLD-Ceiling Grid Inspection2/29/20162/29/20162/29/2016PCANC
DetailsMike Jordan
Part // Roger Phone #: ###-####. Hardlid in changing room area ok.
BLD-Wall Bracing2/22/20162/23/20162/23/2016ACANC
DetailsMike Jordan
Roger Phone #: ###-####
BLD-Framing/Rough-in2/23/20162/23/20162/23/2016APASS
DetailsMike Jordan
Roger Phone #: ###-####
BLD-Framing/Rough-in2/18/20162/19/20162/19/2016APART
DetailsMike Jordan
Rodger Phone #: ###-####. Ok to one side. Needs to provide city approved plans.
Issue PAID IN FULL permit  2/16/2016 DONE
Print Occupancy Form  2/16/2016 DONE
Plan assigned to (JG)1/13/20161/13/20162/11/2016 PASS
DetailsJavier Guzman
1st review completed, 1/26 L2 Torrid at Boise Town Center ePlan, several sheets with no design professional stamp on them
Routing - PLAN CHECK2/11/2016 2/11/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  2/11/2016 DONE
Permit Ready to Issue  2/11/2016 DONE
DetailsChristina Prado
Need GC form & Revised cert of value for issuance
Telephone call  2/8/2016 DONE
Jane emailed me the RCE# it won't take effect until 2-9-16. I emailed her back taht if she gave me all the info I'd put the info in first thing tomorrow morning. I also told her if she still wants an early start permit she will need to contact the bldg plan reviewer. I also told her until all plan reviews were done and the permit is ready-I will only be able to give her an extimate on fees due
1st review completed  1/22/2016 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK1/13/2016 1/22/2016 FAIL
DetailsJavier Guzman
ePlan
Routing - Addressing1/13/2016 1/13/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/13/2016 1/13/2016 PASS
DetailsJennifer Bruner
Routing PW Sewer Rating1/13/2016 1/13/2016 PASS
DetailsJennifer Bruner
Contact West Boise Sewer District ###-####
Intake Approval  1/13/2016 PASS
DetailsDavid Ferguson
Application received  1/5/2016 DONE
Application submitted via PDS Online on Jan 5 2016 3:18PM