BLD-Final | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | DONE |
Dave Hannah
|
|
|
Christina Phone #: ###-####
|
PubWorks Occupancy Approval | 9/12/2017 | 9/12/2017 | 9/12/2017 | | DONE |
Tiffany Lowery
|
|
|
|
CHANGE STATUS TO (FNL) | | | 9/12/2017 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for this permit passed/complete
|
Zoning Approval | 6/27/2017 | 6/27/2017 | 6/27/2017 | | DONE |
Andrea Tuning
|
|
|
|
Zoning Approval Temp | 3/29/2017 | 3/29/2017 | 3/29/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Aging Inspection | 12/28/2016 | 12/28/2016 | 1/3/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/27/2016 | 12/27/2016 | 1/3/2017 | | PEND |
Dave Hannah
|
|
|
|
Plan assigned to (CJW) | 10/5/2016 | 10/5/2016 | 10/6/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 10/5/2016 | | 10/6/2016 | | PASS |
Carl Westfall
|
|
|
The plan mod was only to relocate the sewer connection in the alley. No charge.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2016 | | DONE |
Christina Prado
|
|
|
Plan mod approved, no fees due
|
CHANGE STATUS TO (ISS) | | | 10/6/2016 | | DONE |
|
|
|
Plan mod approved, no fees due
|
Plan Modification Accepted | | | 10/5/2016 | | DONE |
|
|
|
Plan mod to update sere connection location per Ron Hill
|
Routing PW Sewer Design | 10/5/2016 | | 10/5/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
BLD-Conference | 2/27/2016 | 2/29/2016 | 3/1/2016 | P | PART |
Dave Hannah
|
|
|
CMU Rebar inspection and review new permit Phone #: ###-#### Inspection requested via web by Billy Williams crews are working on stiartower
|
Plan assigned to (CJW) | 1/11/2016 | 1/11/2016 | 2/12/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) ATHLOS PHASE 2 (Jan 20 - 10 days) Level 3 TI - ePlanReview
|
Routing - PLAN CHECK | 2/1/2016 | | 2/12/2016 | | PASS |
Carl Westfall
|
|
|
(2-1-16) Waiting for approval from the Consultant Structural Engineer and for a copy of the signed licensed agreement with ACHD.
(2-8-16) Consultant Structural Engineer approved. Waiting for approval from ACHD.
(2-12-16) A copy of the signed license agreement with ACHD was received. If an addendum to that agreement to allow the facade encroachment is required by ACHD, it is a deferred submittal item.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/12/2016 | | DONE |
Christina Prado
|
|
|
Need ACHD, GC form & Revised certificate of value for issuance
|
Issue PAID IN FULL permit | | | 2/12/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/12/2016 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/2/2016 | | 2/8/2016 | | PASS |
Carl Westfall
|
|
|
Stapley (Chris Merrill) - All structural issues resolved.
|
Route to Impact Fee Review | 1/25/2016 | 1/28/2016 | 2/2/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 2/2/2016 | | 2/2/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case along with architect fire review response letter.
|
Routing PW Street Lights | 2/2/2016 | | 2/2/2016 | | PASS |
Mike D Hedge
|
|
|
|
Plan resubmittals received | | | 2/1/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/25/2016 | | DONE |
|
|
|
|
1st review completed | | | 1/25/2016 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/19/2016 | | 1/22/2016 | | FAIL |
Carl Westfall
|
|
|
Stapley (completed after 6:00 PM on a Friday)
|
Routing - PLAN CHECK | 1/11/2016 | | 1/16/2016 | | FAIL |
Carl Westfall
|
|
|
(1-16-16) The 1st IBC plan review was done but the Consultant Structural Engineer had not yet been asked to review the drawings. Items in the nonstructural review require correction.
(1-19-16) A Consultant Structural Engineer was asked to review the drawings. An ePlanReview workflow was sent to her. The 16th was a Saturday and Monday the 18th was a holiday.
|
Routing PW Street Lights | 1/11/2016 | | 1/14/2016 | | FAIL |
Mike D Hedge
|
|
|
Needs street light plans added to drawings.
|
Routing - FIRE | 1/11/2016 | 1/11/2016 | 1/12/2016 | | FAIL |
Scott Arellano
|
|
|
Report attached to case and emailed to architect.
|
Routing PW Geothermal | 1/11/2016 | | 1/12/2016 | | PASS |
Jon R. Gunnerson
|
|
|
Geothermal service already installed. Coordiante with Boise Public Works, Jon Gunnerson, ###-####, for final connection and meter installation.
|
Routing PW Drainage | 1/11/2016 | | 1/11/2016 | | PASS |
Brian Murphy
|
|
|
less than 10000 sq ft
|
Plan Reviewer's activity | | | 1/11/2016 | | DONE |
Jason Blais
|
|
|
Emailed architect to obtain ACHD approval for the streetscape improvements. Written verification to be provided to PDS prior to the building permit being issued.
|
Routing - Design Review | 1/11/2016 | | 1/11/2016 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH15-00444
|
Routing - Addressing | 1/11/2016 | | 1/11/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 1/11/2016 | | 1/11/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 1/11/2016 | | 1/11/2016 | | PASS |
Andy J. Long
|
|
|
see ESC15-01322, no dual ESC permit for two phase TI. Vector Constructors is contractor for both phases.
|
Pending Assignment by JCB | 1/11/2016 | | 1/11/2016 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 1/7/2016 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Madsen and plan review fees paid.
|
Application received | | | 1/6/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 6 2016 10:27PM
|