Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD16-00049
StatusFinaled
Name VECTOR CONSTRUCTORS LLC
Site Address 918 W IDAHO ST
Project NameAthlos Headquarters - Phase 2
Customer Number 
ePlanReviewYes
Description
(Project Management - Ron Hill) (ATHLOS HEADQUARTERS – PHASE 2 – STREETSCAPE, EXTERIOR WALL FINISHES, SHADE AWNINGS, CANOPIES, WINDOWS, TRELLIS, DECKS, ETC.) (DRH15-00444) The fire sprinkler system is used for building area increase, story increase, and for fire area. To remodel the exterior of an existing 111,376 square foot, 4 story building. This permit is Phase 2 of a multi-phase project. This permit is not intended to establish a Certificate of Occupancy for any tenant. The seismic upgrade and other structural changes were done under permit BLD15-03621. Work is to include 3 metal canopies at different elevations at the Idaho Street entrance, a metal canopy at the 10th Street entrance, metal window shade awnings on the Idaho Street and 10th Street sides, metal trellis structures at the exterior wall parapet on the Idaho Street and 10th Street sides, new storefront windows and doors at grade, new storefront windows above grade, new concrete veneer exterior panels, new metal wall panels, and new EIFS/stucco system applied to the exterior side of the 4th story walls. Streetscape demolition work includes removing the existing sidewalk and excavating the soil. A concrete retaining wall will be constructed and an existing vault backfilled. New streetscape work includes installing Silva Cells, soil, tree wells, backfill, street lights, sidewalk trench drains, bike racks, tree grates, precast concrete planters, pavers, and concrete sidewalk. A floor will be constructed over the new vehicular ramp that gives access to the basement so that the space above can be used as a mechanical platform. This is a revision to the work proposed under Phase I where this area was not going to be used for any purpose. Special Inspection is required for soils, concrete, epoxy anchors, “Titen” anchors, aluminum welding, bolting, and steel welding. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. An addendum to the signed license agreement with ACHD, if required by ACHD, that allows the exterior building facade to encroach into the public sidewalk at Idaho Street and at 10th Street is a deferred submittal item. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/12/20179/12/20179/12/2017PDONE
DetailsDave Hannah
Christina Phone #: ###-####
PubWorks Occupancy Approval9/12/20179/12/20179/12/2017 DONE
DetailsTiffany Lowery
CHANGE STATUS TO (FNL)  9/12/2017 DONE
DetailsChristina Prado
FIRE-Final Inspection6/27/20176/27/20176/27/2017PPASS
DetailsJim Page
Final life fire safety inspection for this permit passed/complete
Zoning Approval6/27/20176/27/20176/27/2017 DONE
DetailsAndrea Tuning
Zoning Approval Temp3/29/20173/29/20173/29/2017 DONE
DetailsAndrea Tuning
BLD-Aging Inspection12/28/201612/28/20161/3/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection12/27/201612/27/20161/3/2017 PEND
DetailsDave Hannah
Plan assigned to (CJW)10/5/201610/5/201610/6/2016 PASS
DetailsCarl Westfall
Routing - PLAN CHECK10/5/2016 10/6/2016 PASS
DetailsCarl Westfall
The plan mod was only to relocate the sewer connection in the alley. No charge.
PLANS/APPL TAKEN TO FRONT DESK  10/6/2016 DONE
Permit Ready to Issue  10/6/2016 DONE
DetailsChristina Prado
Plan mod approved, no fees due
CHANGE STATUS TO (ISS)  10/6/2016 DONE
Plan mod approved, no fees due
Plan Modification Accepted  10/5/2016 DONE
Plan mod to update sere connection location per Ron Hill
Routing PW Sewer Design10/5/2016 10/5/2016 PASS
DetailsKyle S. Rosenmeyer
BLD-Conference2/27/20162/29/20163/1/2016PPART
DetailsDave Hannah
CMU Rebar inspection and review new permit Phone #: ###-#### Inspection requested via web by Billy Williams crews are working on stiartower
Plan assigned to (CJW)1/11/20161/11/20162/12/2016 PASS
DetailsCarl Westfall
(1st done) ATHLOS PHASE 2 (Jan 20 - 10 days) Level 3 TI - ePlanReview
Routing - PLAN CHECK2/1/2016 2/12/2016 PASS
DetailsCarl Westfall
(2-1-16) Waiting for approval from the Consultant Structural Engineer and for a copy of the signed licensed agreement with ACHD.
(2-8-16) Consultant Structural Engineer approved. Waiting for approval from ACHD.
(2-12-16) A copy of the signed license agreement with ACHD was received. If an addendum to that agreement to allow the facade encroachment is required by ACHD, it is a deferred submittal item.
PLANS/APPL TAKEN TO FRONT DESK  2/12/2016 DONE
Permit Ready to Issue  2/12/2016 DONE
DetailsChristina Prado
Need ACHD, GC form & Revised certificate of value for issuance
Issue PAID IN FULL permit  2/12/2016 DONE
Inspection Record Card- Bld  2/12/2016 DONE
Routing Off Site - STRUCTURAL2/2/2016 2/8/2016 PASS
DetailsCarl Westfall
Stapley (Chris Merrill) - All structural issues resolved.
Route to Impact Fee Review1/25/20161/28/20162/2/2016 PASS
DetailsCindy M. Gould
Routing - FIRE2/2/2016 2/2/2016 PASS
DetailsKatie Marron
Revised report attached to case along with architect fire review response letter.
Routing PW Street Lights2/2/2016 2/2/2016 PASS
DetailsMike D Hedge
Plan resubmittals received  2/1/2016 DONE
Plan resubmittals requested  1/25/2016 DONE
1st review completed  1/25/2016 DONE
Routing Off Site - STRUCTURAL1/19/2016 1/22/2016 FAIL
DetailsCarl Westfall
Stapley (completed after 6:00 PM on a Friday)
Routing - PLAN CHECK1/11/2016 1/16/2016 FAIL
DetailsCarl Westfall
(1-16-16) The 1st IBC plan review was done but the Consultant Structural Engineer had not yet been asked to review the drawings. Items in the nonstructural review require correction.
(1-19-16) A Consultant Structural Engineer was asked to review the drawings. An ePlanReview workflow was sent to her. The 16th was a Saturday and Monday the 18th was a holiday.
Routing PW Street Lights1/11/2016 1/14/2016 FAIL
DetailsMike D Hedge
Needs street light plans added to drawings.
Routing - FIRE1/11/20161/11/20161/12/2016 FAIL
DetailsScott Arellano
Report attached to case and emailed to architect.
Routing PW Geothermal1/11/2016 1/12/2016 PASS
DetailsJon R. Gunnerson
Geothermal service already installed. Coordiante with Boise Public Works, Jon Gunnerson, ###-####, for final connection and meter installation.
Routing PW Drainage1/11/2016 1/11/2016 PASS
DetailsBrian Murphy
less than 10000 sq ft
Plan Reviewer's activity  1/11/2016 DONE
DetailsJason Blais
Emailed architect to obtain ACHD approval for the streetscape improvements. Written verification to be provided to PDS prior to the building permit being issued.
Routing - Design Review1/11/2016 1/11/2016 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH15-00444
Routing - Addressing1/11/2016 1/11/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/11/2016 1/11/2016 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment1/11/2016 1/11/2016 PASS
DetailsAndy J. Long
see ESC15-01322, no dual ESC permit for two phase TI. Vector Constructors is contractor for both phases.
Pending Assignment by JCB1/11/2016 1/11/2016 DONE
DetailsJason Blais
Intake Approval  1/7/2016 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.
Application received  1/6/2016 DONE
Application submitted via PDS Online on Jan 6 2016 10:27PM