BLD-Final | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | FAIL |
Phil Shearer
|
|
|
Chris Phone #: ###-####. Fire caulking in the garage, Driveway
|
BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | 3/16/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | NR |
Jim Sly
|
|
|
Air seal - Chris Phone #: ###-####
|
BLD-Conference | 3/16/2016 | 3/16/2016 | 3/16/2016 | A | DONE |
David Ferguson
|
|
|
Spoke to Chris Majors about the need for a blower door test and according to Bob Archibald, a visual inspection can be done instead. **DAF**
|
BLD-Wall Bracing | 3/4/2016 | 3/7/2016 | 3/7/2016 | A | PASS |
Jim Sly
|
|
|
Randy Phone #: ###-####
|
BLD-Footing | 2/8/2016 | 2/8/2016 | 2/8/2016 | P | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
Inspection Record Card- Bld | | | 2/1/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/1/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/29/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 1/19/2016 | 1/19/2016 | 1/29/2016 | | DONE |
David Ferguson
|
|
|
Due 1/28 - Need foundation info/floor joist in failure
|
Routing - Erosion and Sediment | 1/29/2016 | | 1/29/2016 | | PASS |
Evan Jenkins
|
|
|
Demo existing carport and add a 557 sq. ft. garage with 619 sq. ft. of new living space on the main level which consists of a half bath, laundry room and pantry as well as an area for a future kitchen. The second story located over the garage is 921 sq. ft. which includes a master bedroom with bathroom and 32 sq. ft. balcony.
|
Routing - PLAN CHECK | 1/29/2016 | | 1/29/2016 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/29/2016 | | DONE |
|
|
|
Need valid RP prior to issuance
|
1st review completed | | | 1/27/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 1/19/2016 | | 1/27/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - MECHANICAL | 1/19/2016 | | 1/20/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/19/2016 | | 1/19/2016 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Erosion and Sediment | 1/19/2016 | | 1/19/2016 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative and Site Map Required for Approval
Evan Jenkins 794.3958
|
Plans ACCEPTED BY PLAN TECH | | | 1/19/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/19/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/19/2016 | | DONE |
Christina Prado
|
|
|
|
Meeting | | | 1/12/2016 | | DONE |
David Ferguson
|
|
|
Spent well over an hour with these plans and then sent him an email of issues/concerns. **DAF**
|
Intake Approval | | | 1/11/2016 | | FAIL |
Christina Prado
|
|
|
Need existing floor plan, manual J and revised floor plans removing the second kitchen
|
Application received | | | 1/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 8 2016 2:30PM
|