Permit Information
Permit NumberBLD16-00091
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 397 N STEELHEAD WAY
Project NameOFR INC.
Customer Number 
ePlanReviewYes
Description
(OFR INC.) Permit to occupy an existing 8,531 sq. ft. vacant warehouse/office tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: Adding a mop sink for required fixtures. Note: the mezzanine has a reduced floor load per attached engineer’s letter, a posted sign stating “No storage allowed” and “60 lbs. floor load per sq. ft.” in the mezzanine required. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/12/20162/15/2016 DONE
This permit finaled on the web by Brian McCoy
BLD-Final2/1/20162/2/20162/2/2016APASS
DetailsMike Jordan
Call Brian McCoy ###-#### Phone #: ###-#### Inspection requested via web by Brian McCoy
FIRE-Final Inspection2/1/20162/2/20162/2/2016APASS
DetailsTroy Cobbley
life safety passed
Permanent Occupancy  2/2/2016 DONE
BLD-Final2/1/20162/1/20162/1/2016PPART
DetailsMike Jordan
Please call Brian W for Access under security Alarm ###-#### Phone #: ###-#### Inspection requested via web by Brian McCoy. Ok for temp occ.
BLD-Final1/28/20161/29/20161/29/2016ANR
DetailsJim Sly
Call Brian 208-590-360 Phone #: ###-#### Inspection requested via web by Brian McCoy
Need Plumbing Permit and final insp.
BLD-Final1/25/20161/26/20161/26/2016PFAIL
DetailsJim Sly
Call Brian McCoy for Access Building under Security Alarm
###-#### Phone #: ###-#### Inspection requested via web by Brian McCoy
Provide 2 handrails at each stairway Provide 42 " guards at stairway.
FIRE-Final Inspection1/25/20161/26/20161/26/2016APART
DetailsTroy Cobbley
A temporary occupancy is being given until plan review oks the revised two exit doors/paths at the south end of the building. One now goes through an intervening office.
Issue PAID IN FULL permit  1/25/2016 DONE
Print Occupancy Form  1/25/2016 DONE
Plan assigned to (JG)1/12/20161/12/20161/22/2016 PASS
DetailsJavier Guzman
1st review completed, 1/18 L1 OFR Inc ePlan
Routing - PLAN CHECK1/22/2016 1/22/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/22/2016 DONE
Permit Ready to Issue  1/22/2016 DONE
DetailsChristina Prado
Need GC form & Revised certificate of value for issuance
Routing - PUBLIC WORKS1/12/2016 1/15/2016 PASS
DetailsJennifer Bruner
Signed off in ePlan by Jennifer Bruner
Routing - PLAN CHECK1/12/2016 1/15/2016 FAIL
DetailsJavier Guzman
ePlan
1st review completed  1/15/2016 FAIL
DetailsJavier Guzman
Routing - FIRE1/12/20161/12/20161/12/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Addressing1/12/2016 1/12/2016 PASS
DetailsLaura Hunter
Intake Approval  1/12/2016 PASS
DetailsDavid Ferguson
Application received  1/11/2016 DONE
Application submitted via PDS Online on Jan 11 2016 2:00PM