BLD-Final | 3/4/2016 | 3/7/2016 | 3/7/2016 | A | PASS |
Mike Jordan
|
|
|
Will Phone #: ###-####
|
DOC - Permit Finaled | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/18/2016 | 2/19/2016 | 2/19/2016 | A | PASS |
Mike Jordan
|
|
|
Will Phone #: ###-####
|
BLD-Footing | 1/25/2016 | 1/26/2016 | 1/26/2016 | A | PASS |
Jim Storey
|
|
|
WIll Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/20/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/19/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 1/19/2016 | 1/19/2016 | 1/19/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 1/19/2016 | | 1/19/2016 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 1/19/2016 | | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 1/19/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/19/2016 | | DONE |
|
|
|
***ALL REQUIRMENTS MET 1-20-16 /CEV
NEEDS; Responsible Person
|
Routing Walk-In (Zoning) | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | FAIL |
David Ferguson
|
|
|
Missing calcs, engineer is using a reduction in the roof loading not permitted in Boise. Need engineering calc for pole barn and tall walls at 12 ft. Provide elevations.
|
1st review completed | | | 1/11/2016 | | FAIL |
David Ferguson
|
|
|
|
Application received | | 1/11/2016 | | | |
|
|
|
|