Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00115
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 3361 N COLE RD
Project NameIdaho Fitness Factory
Customer Number 
ePlanReviewYes
Description
(IDAHO FITNESS FACTORY) Permit is to remodel an existing 7,754 sq. ft. assembly tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: Removal of select interior nonbearing walls, new construction of interior non-bearing walls to create a large group area, a supply/laundry area, men’s and women’s locker room area, hallway, small group area, a tanning area and a kids area, adding a ADA transfer-type shower compartments and ADA benches in the man’s and women’s locker room, relocate existing ADA drinking fountain, relocate service sink, relocate select existing light fixtures, electrical work, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully fire sprinklered for area increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/22/20165/10/2016 DONE
This permit finaled on the web by Brian McCoy
First Notice 4/11/20164/12/2016 DONE
Mailed 4-13-16
BLD-Final4/1/20164/1/20164/1/2016PPASS
DetailsJim Sly
Please call 30 minutes prior to inspection Thanks Kelly Phone #: ###-#### Inspection requested via web by Brian McCoy
OK for Perm Occ.
BLD-Final4/1/20164/1/20164/1/2016ANR
DetailsJim Sly
Please Call Kelly at ###-#### 20 minutes prior to inspection. Thanks! Phone #: ###-#### Inspection requested via web by Brian McCoy
Need Plumbing Final
Permanent Occupancy  4/1/2016 DONE
FIRE-Final Inspection3/30/20163/31/20163/31/2016PPASS
DetailsTroy Cobbley
life safety passed. The occupant load signs will be installed prior to a building inspection.
BLD-Framing/Rough-in2/22/20162/23/20162/23/2016APASS
DetailsJim Sly
Please call Kelly 20 minutes prior to inspection for access. Phone #: ###-#### Inspection requested via web by Brian McCoy
Plan assigned to (JG)1/25/20161/25/20162/4/2016 PASS
DetailsJavier Guzman
1st review completed, 2/05 L2 Idaho Fitness Factory ePlan
Routing - PLAN CHECK2/4/2016 2/4/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  2/4/2016 DONE
Permit Ready to Issue  2/4/2016 DONE
DetailsChristina Prado
Need GC Form & Revised Certificate of Value for issuance
Issue PAID IN FULL permit  2/4/2016 DONE
Print Occupancy Form  2/4/2016  
Routing - PLAN CHECK1/25/2016 2/3/2016 FAIL
DetailsJavier Guzman
ePlan
1st review completed  2/3/2016 FAIL
DetailsJavier Guzman
Routing - FIRE1/25/20161/25/20161/26/2016 PASS
DetailsKatie Marron
Comments attached to case.
Intake Approval  1/25/2016 PASS
DetailsDavid Ferguson
Routing - Addressing1/25/2016 1/25/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/25/2016 1/25/2016 PASS
DetailsRachael Beierle
Application received  1/12/2016 DONE
Application submitted via PDS Online on Jan 12 2016 4:43PM