First Notice | | 11/5/2017 | 11/7/2017 | | DONE |
|
|
|
This permit finaled on the web by Todd Weltner
|
Permanent Occupancy | | | 10/26/2017 | | DONE |
|
|
|
|
BLD-Final | 10/6/2017 | 10/9/2017 | 10/9/2017 | A | PASS |
Jim Sly
|
|
|
Ron Phone #: ###-#### OK for Perm Occ.
|
Zoning Approval | 10/5/2017 | 10/5/2017 | 10/5/2017 | | DONE |
Andrea Tuning
|
|
|
|
Telephone call | | | 10/5/2017 | | DONE |
|
|
|
called Vertical to try and get current address-left message again asking them to call us back
|
PubWorks Occupancy Approval | 9/27/2017 | 9/27/2017 | 9/27/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval Temp | 8/21/2017 | 8/21/2017 | 8/21/2017 | | DONE |
Andrea Tuning
|
|
|
|
Temporary Occupancy | 8/18/2017 | 11/16/2017 | 8/18/2017 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PART |
Jim Sly
|
|
|
Ron Phone #: ###-#### OK for Temp Occ. OK for Perm Occ when Zoning signs Perm.
|
BLD-Final | 8/11/2017 | 8/14/2017 | 8/14/2017 | P | CANC |
Jim Sly
|
|
|
Please check zoning signed off for temp too // Ron Phone #: ###-#### // called 10:10am 8-14-2017 Ron
|
Plan assigned to (AJS) | 8/8/2017 | 8/8/2017 | 8/11/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/11/2017 | | DONE |
|
|
|
plan mod approved. Per Adele S. no plan mod fees for drainage modification only.
|
Routing PW Drainage | 8/11/2017 | | 8/11/2017 | | PASS |
Jason C. Taylor
|
|
|
Approved paver section. JCT
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2017 | | DONE |
|
|
|
|
PubWorks Temp Occupancy Appr | 8/10/2017 | 8/10/2017 | 8/10/2017 | | DONE |
Jason C. Taylor
|
|
|
BND17-00068 in place for pavers. JCT
|
FIRE-Final Inspection | 8/9/2017 | 8/9/2017 | 8/9/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. No gates/fence has been installed betwee building 1 and 2
|
Plan assigned to (AJS) | 7/31/2017 | 7/31/2017 | 8/8/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan Mod
|
Routing PW Street Lights | 8/1/2017 | | 8/8/2017 | | PASS |
Tom Marshall
|
|
|
signed off in e plan
|
Routing PW Drainage | 8/1/2017 | | 8/4/2017 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in ePlan. JCT
|
Routing PW Solid Waste | 8/1/2017 | | 8/2/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PUBLIC WORKS | 7/31/2017 | | 8/1/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan Modification Accepted | | | 7/31/2017 | | DONE |
|
|
|
Plan Mod Application rec'd to add pavers north west corner of the site, approximatley 15' x 10'-4', located at a low spot to eliminate ponding.
|
BLD-Conference | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | DONE |
Jim Sly
|
|
|
Ron Phone #: ###-####
|
(F) Reprint permit | | | 7/19/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/5/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 5/5/2017 | 5/5/2017 | 6/5/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 6/5/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for plan Mod
DO NOT RE-ISSUE PERMIT
|
Routing - Design Review | 6/2/2017 | | 6/2/2017 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Framing/Rough-in | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | CANC |
Jim Sly
|
|
|
Ron-inspection is for the front of building amd canopy not for the plan modification Phone #: ###-####
|
BLD-Framing/Rough-in | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Jim Sly
|
|
|
Ron-inspection is for the front of building amd canopy not for the plan modification Phone #: ###-#### East end Canopy on South wing framing....OK.
|
Routing - MECHANICAL | 5/31/2017 | | 5/31/2017 | | PASS |
Troy James
|
|
|
Approved plan mod deleted doors in back of classrooms, added openable windows for outside air requirements.
|
Routing - PLAN CHECK | 5/8/2017 | | 5/22/2017 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
recieved email that architect has made additional changes, sent back to have them uploaded
|
BLD-Energy code compliance | 5/12/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Jim Sly
|
|
|
Ron-bldg 1-Ron says plan mod doens''t have anything to do withg the frame or energy Phone #: ###-####
|
BLD-Framing/Rough-in | 5/12/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Jim Sly
|
|
|
Ron-bldg 1-Ron says plan mod doens''t have anything to do withg the frame or energy Phone #: ###-####
|
Routing - Design Review | 5/8/2017 | | 5/9/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing - MECHANICAL | 5/8/2017 | | 5/9/2017 | | FAIL |
Troy James
|
|
|
Need mechanical ventilation design due to the door and windows removed from the classrooms.
|
BLD-Energy code compliance | 5/5/2017 | 5/8/2017 | 5/8/2017 | P | PART |
Jim Sly
|
|
|
Ron Phone #: ###-#### West Wing.......OK.
|
BLD-Framing/Rough-in | 5/5/2017 | 5/8/2017 | 5/8/2017 | P | PART |
Jim Sly
|
|
|
Ron Phone #: ###-#### West Wing Framing Shear Walls and Energy Code.......OK.
|
Plan Modification Accepted | | | 5/5/2017 | | DONE |
|
|
|
started workflow in e plan for plan mod
|
BLD-Footing | 4/28/2017 | 5/2/2017 | 5/2/2017 | A | PART |
Jim Sly
|
|
|
Ron Wood Phone #: ###-#### Footings for Entry.......S.E. corner of complex OK pending MTI special insp, tests and approvals.
|
BLD-Energy code compliance | 4/20/2017 | 4/21/2017 | 4/21/2017 | P | PASS |
Jim Sly
|
|
|
Insulation // Ron Phone #: ###-#### Engineer Provided Engineering for above and below braced wall line......Steel studs OK and and all framing OK per engineering....South wing.
|
CHANGE STATUS TO (ISS) | | | 4/20/2017 | | DONE |
|
|
|
Plan Mod
|
BLD-Framing/Rough-in | 4/14/2017 | 4/17/2017 | 4/17/2017 | A | PART |
Mike Jordan
|
|
|
partial framing (n/a plan mod scope)// Ron Wood Phone #: ###-####. South wing framing only. ok to cover walls except for interior shear walls. Contractor needs additional details. Interior shear walls constructed of steel studs in leiu of wood studs. Needs to provide connections to underfloor as shown or provide alternate from engineer. Will also need additional detail for mech. ducts through CMU wall.
|
OVERRIDE | | | 4/13/2017 | | |
|
|
|
|
Plan assigned to (AJS) | 3/29/2017 | 3/29/2017 | 4/13/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Village Charter School
|
Routing - PLAN CHECK | 3/28/2017 | | 4/13/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
exterior door change
|
Permit Ready to Issue | | | 4/13/2017 | | DONE |
|
|
|
Plan Mod ONLY - DO NOT RE-ISSUE
|
Routing - Design Review | 3/28/2017 | | 3/31/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - FIRE | 3/28/2017 | 3/28/2017 | 3/30/2017 | | PASS |
Katie Marron
|
|
|
Plan Modification to remove second exit from individual classrooms. Per school charter class sizes are limited to 28 students.
|
Plan Modification Accepted | | | 3/8/2017 | | DONE |
|
|
|
plan mod excepted in e plan
|
Print Occupancy Form | | | 2/1/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/13/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/13/2017 | | DONE |
|
|
|
|
Extend Review Timeline | | | 12/30/2016 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
OVERRIDE | | | 12/28/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 1/22/2016 | 1/22/2016 | 12/28/2016 | | PASS |
Jason Blais
|
|
|
1st review completed Level 3 TI - Eplan - Village Charter School Bldg 1
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/28/2016 | | DONE |
Christina Prado
|
|
|
All requirements 1/5/17 C_P
Needs ACHD!! ///c_p 1/3/16 all other requirementsa met//// NEED RP, GC form, and certificate of value
|
Routing - PLAN CHECK | 12/16/2016 | | 12/22/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 12/16/2016 | | 12/22/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 12/16/2016 | | 12/20/2016 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Street Lights | 12/16/2016 | | 12/19/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - ELECTRICAL | 12/16/2016 | | 12/17/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 12/16/2016 | | 12/16/2016 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 11/15/2016 | | 11/30/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 11/15/2016 | | 11/18/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 11/15/2016 | | 11/16/2016 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 11/15/2016 | 11/15/2016 | 11/15/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - ELECTRICAL | 11/15/2016 | | 11/15/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Street Lights | 11/15/2016 | | 11/15/2016 | | FAIL |
Tom Marshall
|
|
|
|
Routing PW Drainage | 11/15/2016 | | 11/15/2016 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in ePlan. JCT
|
Routing - PUBLIC WORKS | 11/15/2016 | | 11/15/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 11/15/2016 | | 11/15/2016 | | FAIL |
Andrea Tuning
|
|
|
Provide 2 Class II trees along Fairview Avenue.
|
Extend Review Timeline | | | 7/8/2016 | | DONE |
|
|
|
1st approved 180 day extension per Tim W. See Documents
|
1st review completed | | | 2/22/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 1/22/2016 | | 2/22/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 1/22/2016 | | 2/16/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 1/25/2016 | | 2/2/2016 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in ePlan. JCT
|
Routing - MECHANICAL | 1/22/2016 | | 1/29/2016 | | FAIL |
Troy James
|
|
|
|
Routing - ELECTRICAL | 1/22/2016 | | 1/27/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - PLUMBING | 1/22/2016 | | 1/26/2016 | | PASS |
Bill VanDegrift
|
|
|
1) provide dcva in an approved location note 4 page P-301
2) asse 1070 mixing valve required at all public lavs
|
Routing - PLANNING | 1/22/2016 | | 1/26/2016 | | PASS |
Leon Letson
|
|
|
Leon Letson - CUP15-00060
|
Routing PW Street Lights | 1/25/2016 | | 1/26/2016 | | FAIL |
Mike D Hedge
|
|
|
Street Lights Required, no information on plans.
|
Routing - FIRE | 1/22/2016 | 1/22/2016 | 1/25/2016 | | FAIL |
Scott Arellano
|
|
|
Report attached to case and emailed to architect.
|
Routing PW Solid Waste | 1/25/2016 | | 1/25/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing - Design Review | 1/22/2016 | | 1/25/2016 | | FAIL |
Andrea Tuning
|
|
|
Replace the two Callery Pear trees proposed within the landscape planters along the Fairview Avenue frontage with Class II trees. Andrea Tuning - DRH
|
Routing - Addressing | 1/22/2016 | | 1/25/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 1/22/2016 | | 1/25/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 1/22/2016 | | 1/25/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep inspection and Approval Required Prior to Earth Disturbance)
(VILLAGE CHARTER SCHOOL)(BLDG 1) This project also being done in conjunction with BLD16-00161 on same set of plans. Remodel of an existing 24,500 sq. ft. office/retail building into new educational charter school with new classrooms and school administration offices per approved plans. New parking lot design and outdoor area for the kids.
|
Pending Assignment by JCB | 1/22/2016 | | 1/22/2016 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 1/20/2016 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Tim Woodard and plan review fees paid.
|
Application received | | | 1/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 13 2016 1:02PM
|