Third Notice | | 12/18/2016 | 1/11/2017 | | DONE |
|
|
|
sent with a letter
|
Third Notice | | 11/23/2016 | 12/13/2016 | | DONE |
|
|
|
|
Third Notice | | 10/22/2016 | 11/18/2016 | | DONE |
|
|
|
|
Second Notice | | 9/22/2016 | 10/17/2016 | | DONE |
|
|
|
Mailed 10-18-16
|
First Notice | | 8/27/2016 | 9/12/2016 | | DONE |
|
|
|
Mailed 9-13-16
|
Print Occupancy Form | | | 8/17/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/17/2016 | | DONE |
|
|
|
|
BLD-Final | 8/15/2016 | 8/16/2016 | 8/16/2016 | P | PASS |
Jim Sly
|
|
|
Shane Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 8/12/2016 | 8/15/2016 | 8/15/2016 | P | NR |
Tony Young
|
|
|
Shane Phone #: ###-####,, need trades 1st,, no inspection
|
FIRE-Final Inspection | 8/12/2016 | 8/15/2016 | 8/15/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Apparently the address has been changed back to 2993 on the computer but no activity has been entered. Suite number of 270 still needs to be posted prior to a building inspection. All other items are ok. Shane Phone #: ###-####
|
FIRE-Final Inspection | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | FAIL |
Troy Cobbley
|
|
|
Remove the thumbturn from the main entry exit and provide sticker as discussed, provide fire extinguisher on the upper level, repair the exit sign at the main exit, install all door hardware, provide correct address and suite number.
Shane Phone #: ###-####
|
FIRE-Final Inspection | 6/22/2016 | 6/23/2016 | 6/23/2016 | P | FAIL |
Jim Page
|
|
|
Sprinkler head in south side of new conference room is over spaced, sprinkler head in receptionist area is over spaced. $ interior doors still have round knob type door hardware, needs to be changed to paddle type door handle hardware.
|
Plan Reviewer's activity | | | 4/27/2016 | | DONE |
Javier Guzman
|
|
|
corrected address per addressing and added suite #270 to scope of work
|
BLD-Framing/Rough-in | 4/20/2016 | 4/21/2016 | 4/21/2016 | A | PART |
Mike Jordan
|
|
|
Shane Phone #: ###-####. Interior steel and wood framed walls ok. Pending plumbing rough in inspection.
|
BLD-Framing/Rough-in | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | NR |
Jim Sly
|
|
|
Shane phone ###-#### Need Plumbing rough in.
|
BLD-Framing/Rough-in | 4/15/2016 | 4/18/2016 | 4/18/2016 | A | CANC |
Jim Sly
|
|
|
Door says 2993 // Shane Phone #: ###-####
|
BLD-Framing/Rough-in | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | CANC |
Jim Sly
|
|
|
|
Issue PAID IN FULL permit | | | 3/29/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 1/14/2016 | 1/14/2016 | 1/19/2016 | | PASS |
Javier Guzman
|
|
|
1/20 L1 Jolley Rental Co, LLC Paper Plans
|
Routing - PLAN CHECK | 1/14/2016 | | 1/19/2016 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 1/19/2016 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 1/19/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/19/2016 | | DONE |
|
|
|
Need GC Form and Revised Cert of Value
|
Print Occupancy Form | | | 1/19/2016 | | DONE |
|
|
|
|
Telephone call | | | 1/19/2016 | | DONE |
|
|
|
called Architect- let him know that the permit is ready for pick up and that we need GC form and Certificate of value form GC before we can add final permit fees
|
Routing - PUBLIC WORKS | 1/14/2016 | | 1/14/2016 | | PASS |
Rachael Beierle
|
|
|
SEWER PERMIT MUST BE ISSUED FROM WBSD. FEES FORWARDED 1-14-16 RMB
|
Routing - Addressing | 1/14/2016 | | 1/14/2016 | | PASS |
Laura Hunter
|
|
|
Address is 2993 N Cole Rd No suite number
|
Plans ACCEPTED BY PLAN TECH | | | 1/14/2016 | | DONE |
|
|
|
|
Intake Approval | | | 1/14/2016 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/14/2016 | | DONE |
|
|
|
|
Application received | | 1/14/2016 | | | |
|
|
|
|