Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00132
StatusIssued
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 2749 S BROADWAY AVE
Project NameDapper Dog
Customer Number 
ePlanReviewYes
Description
(DAPPER DOG) Permit to remodel an existing 1,082 sq. ft. tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing wall, construction of new select interior nonbearing wall to create a lobby area and a grooming area, adding vertical grab bars in existing ADA accessible restroom, electrical work, mechanical work, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation5/9/20165/10/20165/10/2016ACANC
DetailsJim Storey
Mike Phone #: ###-#### wrong permit #
BLD-Framing/Rough-in2/12/20162/12/20162/12/2016PPASS
DetailsJim Storey
Shane Phone #: ###-####
Issue PAID IN FULL permit  1/27/2016 DONE
DetailsChristina Prado
Inspection Record Card- Bld  1/27/2016 DONE
DetailsChristina Prado
Plan assigned to (JG)1/14/20161/14/20161/15/2016 PASS
DetailsJavier Guzman
1/20 L1 Dapper Dog ePlan
Routing - PLAN CHECK1/14/2016 1/15/2016 PASS
DetailsJavier Guzman
1st review completed  1/15/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/15/2016 DONE
Permit Ready to Issue  1/15/2016 DONE
DetailsChristina Prado
**ALL REQUIREMENTS MET 01/19/16 C_P**

Need GC form & Revised certificate of value for issuance
Application received  1/14/2016 DONE
Application submitted via PDS Online on Jan 14 2016 10:27AM
Intake Approval  1/14/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLUMBING1/14/2016 1/14/2016 PASS
DetailsBill VanDegrift
1) verify cross connection control
with field inspector for wash stations
2) provide drainage for the wash
stations
Routing - Addressing1/14/2016 1/14/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/14/2016 1/14/2016 PASS
DetailsBeverly Mountain