Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD16-00147
StatusFinaled
Name ESI
Site Address 500 S CAPITOL BLVD
Project NameInn at 500 TI
Customer Number 
ePlanReviewYes
Description
(INN at 500 – Shell and Core / Hotel Interior Finish) Permit to finish and occupy all areas of this 90,000 square foot hotel building except a 3,320 square foot new restaurant area that will be submitted under a separate permit. This building is fire sprinklered for “R” occupancy provisions / alternate approval provisions / fire area provisions / etc. This building utilizes enhanced lighting to comply with the 2012 IECC. Scope of work includes: installation of rated assemblies (corridors / type of construction separations / distance to property line separations / rated shafts), [interior non-bearing partitions creating 111 guest rooms, lobby area, restaurant area, trash room, mechanical storage room, bike storage room, two meeting rooms, office area, fitness center, and lundry / storage room], new electrical, new plumbing, new mechanical, new interior / exterior finishes, new accessible doors / hardware, and related site work. This building is fully fire sprinklered and alarmed. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/6/2018 DONE
DetailsChristina Prado
Print Statement  2/6/2018 DONE
Third Notice 11/19/201712/12/2017 DONE
Mailed 12-13-17
Second Notice 10/22/201711/14/2017 DONE
Mailed 11-15-17
First Notice 10/1/201710/12/2017 DONE
Mailed 10-13-17
PubWorks Occupancy Approval9/21/20179/21/20179/21/2017 DONE
DetailsTiffany Lowery
Permanent Occupancy  9/21/2017 DONE
BLD-Final9/15/20179/15/20179/18/2017PPASS
DetailsDave Hannah
Pending PW and ACHD sign off
Print Occupancy Form  9/15/2017 DONE
Print Occupancy Form  9/15/2017 DONE
BLD-Conference9/5/20179/5/20179/5/2017PPEND
DetailsDave Hannah
Sending this per Alex - Please contact Travis to see where they are at with coming in for either a TCO or CO... Pending items - ADA doors, state elevator insp, PW insp and ACHD sign off....Travis @ ###-####
BLD-Conference8/17/20178/17/20178/24/2017PPASS
DetailsDave Hannah
Zoning Approval4/3/20174/3/20174/3/2017 PASS
DetailsSarah Schafer
BLD-Conference2/21/20172/22/20172/27/2017ADONE
DetailsDave Hannah
ADA conference Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference2/21/20172/21/20172/21/2017PCANC
DetailsMike Jordan
BLD-Conference2/17/20172/21/20172/21/2017ACANC
DetailsMike Jordan
ADA door clearance conference Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover2/14/20172/15/20172/15/2017APASS
DetailsDave Hannah
Laundry chute cover Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Final2/9/20172/9/20172/9/2017PPART
DetailsDave Hannah
5th and 6th floors TCO Phone #: ###-#### Inspection requested via web by Mike Beeson 5th and 6th floor ok for temp occ
FIRE-Final Inspection2/8/20172/8/20172/8/2017PPASS
DetailsJim Page
Final fire sprinkler inspection is complete, final fire alarm inspection is complete, fire extinguishers are in place with current inspection tags, knox box is in place and emergency egress lighting has been tested/inspected. Final life fire safety inspection passed/complete.
FIRE-Supply Line Cover2/7/20172/8/20172/8/2017PCANC
DetailsJim Page
Inspection request is for life fire safety final, this inspection request cancelled and the correct inspection request generated.
BLD-Conference2/4/20172/6/20172/6/2017APASS
DetailsDave Hannah
Review ADA, and laundry shoot cover Phone #: ###-#### Inspection requested via web by Mike Beeson 5th and 6th floor shaft ok
BLD-Concrete2/3/20172/6/20172/6/2017ACANC
DetailsDave Hannah
out of time friday 301
BLD-Conference2/3/20172/3/20172/3/2017PDEFR
DetailsJim Storey
regarding ADA Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference2/1/20172/2/20172/2/2017APEND
DetailsDave Hannah
Discuss sign offs for 5th and 6th floors ; Review Laundry shoot framing Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference1/23/20171/24/20171/24/2017APEND
DetailsDave Hannah
walk through Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in1/13/20171/13/20171/13/2017PPASS
DetailsDave Hannah
Wall cover Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Final1/12/20171/13/20171/13/2017PPART
DetailsDave Hannah
TCO 1-4 Phone #: ###-#### Inspection requested via web by Mike Beeson ok for tco.1-4
BLD-Wall cover1/12/20171/13/20171/13/2017ACANC
DetailsDave Hannah
Wall cover Phone #: ###-#### Inspection requested via web by Mike Beeson
FIRE-Final Inspection1/13/20171/13/20171/13/2017PPART
DetailsJim Page
Final inspection for TCO of levels i through 4 complete, fire sprinklers are complete through level 5, fire alarms are complete through level 4 with active fire alarms in the corridors of level 5, fire extinguishers are in place with current inspection tags, knox box is in place, remainder of building will be inspected at a later date.
BLD-Wall cover1/12/20171/12/20171/13/2017PNR
DetailsDave Hannah
Cover for last two penthouse suite''s on 6. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference1/11/20171/11/20171/13/2017PNR
DetailsDave Hannah
Floor 1-4 Phone #: ###-#### Inspection requested via web by Mike Beeson
FIRE-Supply Line Cover1/11/20171/11/20171/11/2017PCANC
DetailsJim Page
A voicemail was left on the point of contacts cell phone, Mike at ###-####, this inspection request is cancelled, fire alarms for levels 4 and 5 plus rooms on level 3 have not been tested/inspected, this needs to be completed before life sfatey inspection can be performed for TCO of levels 1-4. Need to verify if fire sprinkler inspections have been completed for levels 1 through 5 for TCO before life safety inspection as well.
BLD-Conference1/9/20171/10/20171/10/2017APEND
DetailsDave Hannah
Pre-walk for floors 1-4 and floors above egress. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover1/5/20171/6/20171/6/2017APASS
DetailsDave Hannah
Fire caulk corridor lid on 6th floor on Capitol and framing Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference12/30/201612/30/201612/31/2016PPASS
DetailsDave Hannah
6th floor Captiol light gauge, site egress event night Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover12/28/201612/28/201612/28/2016PPASS
DetailsDave Hannah
Egress in lobby and alley cleared. 6th floor myrtle cover in hallway Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover12/27/201612/27/201612/28/2016PPASS
DetailsDave Hannah
Insulation for the last two rooms on 6th floor Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference12/22/201612/27/201612/27/2016APASS
DetailsDave Hannah
Walk on floors 1-3 egress and signage for limited TCO event on the 31st. Phone #: ###-#### Inspection requested via web by Mike Beeson
FIRE-Final Inspection12/20/201612/20/201612/20/2016PPART
DetailsJim Page
Partial final life fire safety inspection for TCO complete for levels 1 and 2, fire sprinkler inspection complete (fire sprinklers are active) for fire pump room as well as levels 1, 2 and 3 fire sprinklers including wet standpipes for both east and west stairwells, fire alarm inspection complete for levels 1, 2 and 3 (was instructed at time of alarm inspection that fire panel will be monitored for the requested occupied area's) including automatic function for stairwell pressurization. Temporary fire extinguishers are in place for levels 1, 2 and 3, permanent extinguishers will be put in place at a later date, knox box is in place, final inspection for commercial hood fire suppression system complete. Partial final inspection for TCO inspection complete.
FIRE-Supply Line Cover12/20/201612/20/201612/20/2016PCANC
DetailsJim Page
Inspection request is for TCO inspection for levels 1,2 and 3, this inspection request is cancelled and the correct inspection request will be generated.
BLD-Other12/19/201612/19/201612/20/2016APART
DetailsDave Hannah
Walk floors 1-3 Phone #: ###-#### Inspection requested via web by Mike Beeson ok to train house cleaning staff on 1st and second floors they will be wearing saftey vest and hard hats and have gone thruogh safty orintaion.
BLD-Wall cover12/14/201612/15/201612/16/2016PPASS
DetailsDave Hannah
Cover on 6 Myrtle, Phone #: ###-#### Inspection requested via web by Mike Beeson fur down soffits
BLD-Ceiling Grid Inspection12/14/201612/14/201612/14/2016APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike Beeson first floor ok
BLD-Framing/Rough-in12/12/201612/12/201612/13/2016PPART
DetailsDave Hannah
6th floor Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover12/8/201612/9/201612/12/2016ANR
DetailsDave Hannah
fire caulking, cover on 6th Myrtle Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference12/2/201612/2/201612/9/2016PPASS
DetailsDave Hannah
6th floor insulation Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference12/7/201612/8/201612/8/2016APASS
DetailsDave Hannah
Ceiling grid and fire caulking
Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference12/6/201612/6/201612/6/2016PFAIL
DetailsDave Hannah
ceiling grid
Phone #: ###-#### Inspection requested via web by Mike Beeson 2nd floor
BLD-Conference12/4/201612/5/201612/5/2016PCANC
DetailsDave Hannah
Grid inspections, partial garage, 1st and 2nd floors Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in11/28/201611/29/201611/29/2016APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference11/22/201611/22/201611/22/2016PPASS
DetailsDave Hannah
Shafts on 5th Phone #: ###-#### Inspection requested via web by Mike Beeson
FIRE-Hydro test above ground11/21/201611/22/201611/22/2016ADONE
DetailsJim Page
Inspection request was a fire conference, fire conference is complete.
BLD-Framing/Rough-in11/21/201611/21/201611/22/2016APASS
DetailsDave Hannah
5th floor Capitol Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in11/21/201611/21/201611/22/2016PPASS
DetailsDave Hannah
5th floor Capitol Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover11/16/201611/16/201611/16/2016PPASS
DetailsDave Hannah
Fire caulk on 5, shaft walls Phone #: ###-#### Inspection requested via web by Mike Beeson and corradors ok to cover
BLD-Conference11/14/201611/14/201611/14/2016APART
DetailsMike Jordan
Cover on 6 Phone #: ###-#### Inspection requested via web by Mike Beeson. Ceiling, ok to rock 4ft from top.
BLD-Wall cover11/9/201611/10/201611/14/2016APART
DetailsDave Hannah
5th floor Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover11/9/201611/10/201611/14/2016PCANC
DetailsDave Hannah
6th floor Pre lid and exterior walls Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference11/8/201611/8/201611/8/2016APASS
DetailsDave Hannah
5th floor shaft walls Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference11/7/201611/7/201611/7/2016ANR
DetailsDave Hannah
Shaft walls and fire collars on 5 Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in11/3/201611/4/201611/4/2016PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike Beeson 5th floor shafths
BLD-Wall cover11/3/201611/4/201611/4/2016APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike Beeson 4th floor
BLD-Framing/Rough-in11/2/201611/3/201611/4/2016ACANC
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in11/1/201611/2/201611/2/2016APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike Beeson 4th floor hall way ceilings ok to cover mertal side and 6th floor hallway
BLD-Conference10/31/201611/1/201611/1/2016APASS
DetailsDave Hannah
AM inspection on Collars, fire caulking and insulation Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in10/27/201610/28/201610/31/2016APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference10/25/201610/26/201610/26/2016APEND
DetailsDave Hannah
Review Fire caulking (Hilti engineered judgement) Spec''s Phone #: ###-#### Inspection requested via web by Mike Beeson
Telephone call  10/26/2016 DONE
Reminded fire protection contractor the pump has to be connected to an emergency gernerator on this project due to a code alternate. Also left a message for the field inspector.
BLD-Conference10/24/201610/25/201610/25/2016APART
DetailsDave Hannah
Re-try fire caulk inspection and shafts on 4th floor. Phone #: ###-#### Inspection requested via web by Mike Beeson east wing ok
BLD-Wall cover10/24/201610/24/201610/24/2016PCANC
DetailsDave Hannah
Fire Caulk on 4th lid Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in10/24/201610/24/201610/24/2016PNR
DetailsDave Hannah
4th floor Myrtle cover Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference10/21/201610/24/201610/24/2016ANR
DetailsDave Hannah
Fire Caulk on 4th lid Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover10/20/201610/20/201610/21/2016PPASS
DetailsDave Hannah
Shaft walls on 4th Myrtle Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in10/14/201610/14/201610/14/2016APASS
DetailsPhil Shearer
Framing on lid on 3, fire caulking on 3 above lids. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference10/12/201610/13/201610/13/2016PPASS
DetailsJim Storey
Insulation on exterior walls on 5th floor.exterior and shafts as noted on plan Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Ceiling Grid Inspection10/11/201610/12/201610/12/2016PNR
DetailsJim Storey
Insulation on 5th floor and cover on 3rd floor. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Ceiling Grid Inspection10/11/201610/12/201610/12/2016ACANC
DetailsJim Storey
Cover on 2nd floor Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover10/10/201610/11/201610/11/2016PNR
DetailsDave Hannah
Cover on 3 and 4, Insulation on 5 Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover10/4/201610/5/201610/5/2016APASS
DetailsDave Hannah
shaft wall and fire caulking floors 2 and 3 Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference10/3/201610/3/201610/4/2016PPASS
DetailsDave Hannah
2nd floor shaft wall and fire caulking Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in9/30/20169/30/20169/30/2016PPASS
DetailsDave Hannah
Fire caulking on 3 for cover.


Phone #: ###-#### Inspection requested via web by Mike Beeson myrdel side ok
BLD-Wall cover9/27/20169/28/20169/29/2016PPART
DetailsDave Hannah
1st floor hard lids, 3rd floor walls and walk 4th floor Phone #: ###-#### Inspection requested via web by Mike Beeson. First floor hard lids ok 3rd fl fail
BLD-Framing/Rough-in9/26/20169/27/20169/27/2016PPART
DetailsDave Hannah
cover on the 3rd Phone #: ###-#### Inspection requested via web by Mike Beeson 3rd floor fail first floor lobby ok
BLD-Framing/Rough-in9/16/20169/19/20169/19/2016APASS
DetailsDave Hannah
Capitol side insulation on 4th floor and third floor framing Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in9/14/20169/15/20169/15/2016APART
DetailsDave Hannah
Insulation and framing Phone #: ###-#### Inspection requested via web by Mike Beeson ext walls myrtle end insulation ok ok to cover walls room side
BLD-Framing/Rough-in9/13/20169/14/20169/14/2016ADEFR
DetailsJim Storey
Insulation and framing Phone #: ###-#### Inspection requested via web by Mike Beeson to dave am out of time
BLD-Other9/6/20169/7/20169/8/2016APART
DetailsDave Hannah
Fire caulking, approved to cover from Mechanical. Need approval to rock 2nd floor complete. Phone #: ###-#### Inspection requested via web by Mike Beeson eastwing ok to cover walls
BLD-Framing/Rough-in9/6/20169/6/20169/6/2016APEND
DetailsDave Hannah
2nd floor, 3rd floor, 6th and roof Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Energy code compliance8/23/20168/24/20168/30/2016PPASS
DetailsDave Hannah
Rock-wool and fire proofing on second floor and short conference talk Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Energy code compliance8/17/20168/17/20168/17/2016PPASS
DetailsMike Jordan
Exterior insulation on floors 2 and 3 Myrtle Phone #: ###-#### Inspection requested via web by Mike Beeson. Floors 2 and 3, exterior walls (east half) ok to sheet rock only. Furred out fireplace framing to remaing uncovered at this time.
BLD-Framing/Rough-in8/9/20168/10/20168/10/2016APEND
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Wesley Harrison
BLD-Energy code compliance8/4/20168/5/20168/5/2016PPEND
DetailsDave Hannah
Fireproofing Phone #: ###-#### Inspection requested via web by Mike Beeson second floor ok
BLD-Framing/Rough-in7/29/20168/1/20168/5/2016APART
DetailsDave Hannah
Framing for 6th deck on Myrtle, cover for lids on 3rd floor corridor and Monokote on 2nd, MTI approved just a visual to make sure you are OK with coverage. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Framing/Rough-in7/22/20167/25/20167/26/2016PPASS
DetailsDave Hannah
5th floor decking, checking framing below. Maybe we can review Mono-kote progress on floor 2 while your here. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference7/18/20167/18/20167/18/2016APART
DetailsDave Hannah
Lid inspection, partial insulation at 2nd floor Myrtle side. Sheathing Phone #: ###-#### Inspection requested via web by Mike Beeson elec walls 2&3 floors ok to prerock top of walls and ceilings 2nd floor east wing and ok to insulate 3rd fl e wing
BLD-Conference7/15/20167/15/20167/15/2016PCANC
DetailsJim Storey
Just need ok to cover 2nd floor lid on Myrtle side, not walls. All MEP inspections above lid have been signed off. Phone #: ###-#### Inspection requested via web by Mike Beeson out of time
BLD-Framing/Rough-in7/5/20167/6/20167/6/2016PPART
DetailsDave Hannah
This is for our structural framing for the 5th floor deck pour. MTI has inspected all Forte''s welds with no deficiencies. Phone #: ###-#### Inspection requested via web by Mike Beeson east half
BLD-Conference6/30/20167/1/20167/1/2016APASS
DetailsDave Hannah
Mike Phone #: ###-####
Print Occupancy Form  6/15/2016 DONE
Issue PAID IN FULL permit  6/7/2016 DONE
Print Occupancy Form  6/7/2016 DONE
Permit Ready to Issue  4/12/2016 DONE
MET Needs; sewer fees paid prior to issuance
PLANS/APPL TAKEN TO FRONT DESK  4/11/2016 DONE
Routing PW Street Lights3/30/2016 4/11/2016 PASS
DetailsMike D Hedge
Approved in E-Plan Review. TLW
Plan assigned to (TLW)1/24/2016 4/11/2016 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK3/30/2016 4/11/2016 PASS
DetailsTim L. Woodard
Approved with defered submittal on Jacuzzi Transfer Wall. TLW
Routing - MECHANICAL3/30/2016 4/6/2016 PASS
DetailsTroy James
Routing - PLUMBING3/30/2016 4/6/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing PW Street Lights4/4/2016 4/4/2016 PASS
DetailsTom Marshall
Resub approved per Tom.
Routing - FIRE3/30/20163/30/20163/30/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Routing - PLAN CHECK1/24/2016 3/1/2016 FAIL
DetailsTim L. Woodard
Refer to Changemarks on drawings. TLW
1st review completed  3/1/2016 DONE
Routing - PLUMBING1/24/2016 2/5/2016 FAIL
DetailsDaryl Spivey
P11 sewer service location does not match utility plan
Show interceptor, piping and venting
P91 and P92 separate riser diagrams to provide clarity and show sizing
P41 P91 and P92 provide suds relief for risers with suds producing fixtures
P81 backflow preventers are not allowed to be installed in walls where water damage will occur
P93 and P94 clarify pipe sizing and routing to bathroom groups
Routing - MECHANICAL1/24/2016 2/4/2016 FAIL
DetailsTroy James
Routing PW Drainage1/25/2016 2/2/2016 PASS
DetailsJason C. Taylor
See BLD15-03525 for drainage approval. JCT
Routing PW Geothermal1/25/2016 1/28/2016 PASS
DetailsJon R. Gunnerson
No Geothermal
Routing - FIRE1/24/20161/24/20161/27/2016 PASS
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing PW Solid Waste1/25/2016 1/27/2016 PASS
DetailsMegan Durrell
Shared concerns over access to trash room under building and noise impacts of services on hotel guests. Approved.
Routing PW Street Lights1/25/2016 1/25/2016 FAIL
DetailsMike D Hedge
Historic street lighting required but not on the plans.
Routing - Addressing1/24/2016 1/25/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/24/2016 1/25/2016 PASS
DetailsRachael Beierle
Routing - Design Review1/24/2016 1/25/2016 PASS
DetailsSarah Schafer
DRH15-00337 - Approved per DR.
Intake Approval  1/24/2016 PASS
Pending Assignment by TLW1/24/2016 1/24/2016 DONE
DetailsTim L. Woodard
Application received  1/15/2016 DONE
Application submitted via PDS Online on Jan 15 2016 4:13PM