Print Statement | | | 9/28/2016 | | DONE |
|
|
|
|
Third Notice | | 8/17/2016 | 9/19/2016 | | DONE |
|
|
|
|
Third Notice | | 7/16/2016 | 8/12/2016 | | DONE |
|
|
|
notice was returned in the mail- wrong address on file- address is now updated and emailed notice to GC
|
Second Notice | | 6/24/2016 | 7/11/2016 | | DONE |
|
|
|
Mailed 7-12-16
|
First Notice | | 6/10/2016 | 6/14/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/31/2016 | | DONE |
|
|
|
|
BLD-Final | 5/24/2016 | 5/24/2016 | 5/24/2016 | P | PASS |
Mike Jordan
|
|
|
Ok for perm occ.
|
BLD-Framing/Rough-in | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | NR |
Mike Jordan
|
|
|
Call half hour before to meet // Fransico Phone #: ###-####. moved to pm.
|
FIRE-Final Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | FAIL |
Troy Cobbley
|
|
|
Missing a sprinkler canopy and the ceiling in the closet near the restrooms.
|
CHANGE STATUS TO (ISS) | | | 5/17/2016 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 5/4/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 5/4/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE -- ALL REQUIREMENTS MET FOR PLAN MOD
Must pay all additional fees prior to changing status to ISS
|
Plan assigned to (CJW) | 4/28/2016 | 4/28/2016 | 5/3/2016 | | PASS |
Carl Westfall
|
|
|
Plan mod. - La Ranchero Market
|
Routing - PLAN CHECK | 4/28/2016 | | 5/3/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLUMBING | 5/2/2016 | | 5/3/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 4/28/2016 | | DONE |
Christina Prado
|
|
|
As requested by Architect - to show minor plumbing updates
|
BLD-Framing/Rough-in | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | PASS |
Mike Jordan
|
|
|
Fransisco Phone #: ###-####. All framing issues resolved. Ok to sheet rock.
|
BLD-Framing/Rough-in | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | FAIL |
Mike Jordan
|
|
|
Francasca Phone #: ###-####. Remove screws from top track of steel stud walls and provide support from structure above. Provide backing for vertical grab bars in new ADA restrooms. A correction notice was issued.
|
BLD-Framing/Rough-in | 3/21/2016 | 3/22/2016 | 3/22/2016 | P | NR |
Mike Jordan
|
|
|
Francisco Phone #: ###-####. Needs electrical rough in inspection first.
|
OVERRIDE | | | 2/25/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 2/17/2016 | 2/17/2016 | 2/25/2016 | | PASS |
Carl Westfall
|
|
|
Plan mod
|
Routing - PLAN CHECK | 2/17/2016 | | 2/25/2016 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/25/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE - All requirements met for plan mod
Must pay all fees in full prior to changing status to ISS
|
CHANGE STATUS TO (ISS) | | | 2/25/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - PLUMBING | 2/18/2016 | | 2/24/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Plan Modification Accepted | | | 2/17/2016 | | DONE |
Carl Westfall
|
|
|
ePlan workflow actually received
|
Plan Modification Accepted | | | 2/17/2016 | | DONE |
Christina Prado
|
|
|
As requested per Pat M. - need to revise plumbing sheets to reflect addition of injection pump for grease interceptor
|
Issue PAID IN FULL permit | | | 2/12/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/12/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/12/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/12/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 2/8/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 1/25/2016 | 1/25/2016 | 2/8/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) LA RANCHERA MARKET (Feb. 12 - 15 days) Level 3 TI - ePlanReview
|
Plan resubmittals received | | | 2/8/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/8/2016 | | 2/8/2016 | | PASS |
Carl Westfall
|
|
|
Resubmittal review completed
|
Routing PW Sewer Rating | 2/8/2016 | | 2/8/2016 | | PASS |
Rachael Beierle
|
|
|
WEST BOISE SEWER DISTRICT.
|
Routing - PLUMBING | 2/8/2016 | | 2/8/2016 | | PASS |
Bill VanDegrift
|
|
|
Additional fixtures - transfer redlines
1) additional cross connection protection may be required
2) floor sinks must be at the face of the cooler for acess and cleaning
3) asse 1070 mixing valve required at public lavs
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2016 | | DONE |
Christina Prado
|
|
|
2-12-16 ALL REQUIRMENTS MET /CEV
2-12-16 Still Need RP
Need RP, GC Form & Revised certificate of value for issuance
|
Routing - PLAN CHECK | 1/25/2016 | | 2/5/2016 | | FAIL |
Carl Westfall
|
|
|
Drinking fountains required
|
Plan resubmittals requested | | | 2/5/2016 | | DONE |
|
|
|
|
1st review completed | | | 2/5/2016 | | DONE |
|
|
|
|
Routing PW Drainage | 1/26/2016 | | 2/2/2016 | | CANC |
Jason C. Taylor
|
|
|
NO REVIEW REQUIRED. JCT
|
Routing - Design Review | 1/25/2016 | | 2/1/2016 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - New exterior rear door, changing front entrance door from single to double doors. Signed off on new doors with through building permit.
|
Routing PW Environmental | 1/26/2016 | | 2/1/2016 | | PASS |
Rick Christenson
|
|
|
Installation of Exterior Grease Interceptor Shown
|
Routing - MECHANICAL | 1/25/2016 | | 1/29/2016 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 1/25/2016 | | 1/27/2016 | | PASS |
Evan Jenkins
|
|
|
(LA RANCHERA MARKET) Remodel for a new 2,503 sq. ft. retail market store within an existing shopping center building per approved plans. Work to include two new restrooms, non-bearing partitions, Type I hood, sinks, plumbing, electrical, paint, ceiling panels, fire sprinkler modification.
|
Routing - FIRE | 1/25/2016 | 1/25/2016 | 1/26/2016 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Routing - PUBLIC WORKS | 1/25/2016 | | 1/26/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 1/25/2016 | | 1/26/2016 | | PASS |
Bill VanDegrift
|
|
|
1) additional cross connection protction may be required
2) floor sink must be at the front of the cooler for access to cleaning
|
Routing - Addressing | 1/25/2016 | | 1/25/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 1/25/2016 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Pending Assignment by JCB | 1/25/2016 | | 1/25/2016 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 1/22/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following (Incomplete submittals will not be accepted):
**Previous request not addressed **
1. The checklist is not complete unless all information is filled out, all boxes are checked and all plan page numbers are listed. (See Page #6 of the checklist it is left blank, please check appropriate box, add plan sheet # if applicable.)
|
Intake Approval | | | 1/21/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following (Incomplete submittals will not be accepted):
1. The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
2. The checklist is incomplete missing page 7.
3. Central District Health Department (CDHD) Food Establishment Plan Review and Approval form for any building where food is prepared, manufactured or stored. Form is available at: http://www.cdhd.idaho.gov/EH/food/forms.htm.
4. Erosion & Sediment Control (ESC) ESC plans as stated.
|
Application received | | | 1/19/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 19 2016 4:34PM
|