Third Notice | | 1/17/2018 | 2/12/2018 | | DONE |
|
|
|
|
Third Notice | | 12/17/2017 | 1/12/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
Third Notice | | 11/19/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
Second Notice | | 10/22/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
First Notice | | 9/22/2017 | 10/12/2017 | | DONE |
|
|
|
Mailed 10-13-17
|
Print Occupancy Form | | | 9/12/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/12/2017 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 6/28/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Dave Hannah
|
|
|
Please call ahead for access - Scott Phone #: ###-####
|
BLD-Final | 6/26/2017 | 6/27/2017 | 6/27/2017 | P | PART |
Dave Hannah
|
|
|
Scott Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place by main entry, luminous egress path markings for stairwell number 2 to be installed. Final life fire safety inspection passed/complete.
|
Extend Permit 90/180 days | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | CANC |
Jim Page
|
|
|
|
Zoning Approval | 6/27/2017 | 6/27/2017 | 6/27/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 6/22/2017 | 6/23/2017 | 6/23/2017 | P | NR |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Needs fire/life/safety, zoning and public works finals.
|
BLD-Conference | 5/10/2017 | 5/10/2017 | 5/11/2017 | P | PASS |
Dave Hannah
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 4/7/2017 | 4/7/2017 | 4/10/2017 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Final | 3/29/2017 | 3/30/2017 | 3/31/2017 | P | PART |
Dave Hannah
|
|
|
Building Final for Dave to verify safety railing is in-place at 2nd Floor Phone #: ###-#### Inspection requested via web by Joel Halfhill ok for temp occ of second and fourth floors
|
BLD-Final | 3/28/2017 | 3/29/2017 | 3/30/2017 | A | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Halfhill
|
FIRE-Final Inspection | 3/27/2017 | 3/28/2017 | 3/28/2017 | A | PART |
Jim Page
|
|
|
Life fire safety Inspection for requested TCO complete (Levels 2 and 4). Building has active fire sprinklers throughout to include monitoring, final inspection for fire sprinklers in requested TCO area's with exception to some heads that will be installed at a later date, final fire alarm inspection has been completed for TCO requested area's (fire alarms are active on floors above and below TCO requested floors 2 and 4), fire extinguishers are in place with current inspection tags, knox box is on order and will be installed when received. Area's that have not had a final inspection performed are the basement level, level 1, mezzanine level and level 3. Life fire safety inspection passed for levels 2 and 4.
|
FIRE-Final Inspection | 3/27/2017 | 3/27/2017 | 3/27/2017 | A | CANC |
Jim Page
|
|
|
|
FIRE-Final Inspection | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | CANC |
Jim Page
|
|
|
Inspection scheduled for 28MAR2017, this request is cancelled.
|
BLD-Other | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | PEND |
Dave Hannah
|
|
|
We are requesting a conditional TCO for floors 2 and 4. If email response is used, please send to halfhilljoel@gmail.com.
Thank you Phone #: ###-#### Inspection requested via web by Joel Halfhill
|
BLD-Framing/Rough-in | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | PART |
Dave Hannah
|
|
|
Joel Phone #: ###-#### landing ok to over
|
FIRE-Conference | 2/22/2017 | 2/22/2017 | 2/22/2017 | P | DONE |
Katie Marron
|
|
|
Phone conversation with Rochelle on required signage at stairwells/floor levels and fire protection equipment doors.
|
BLD-Framing/Rough-in | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | PASS |
Dave Hannah
|
|
|
Partial, first floor - Joel Phone #: ###-####
|
BLD-Energy code compliance | 1/31/2017 | 2/1/2017 | 2/1/2017 | A | PASS |
Dave Hannah
|
|
|
Insulation // Joel Phone #: ###-#### first floor bottom of windows
|
BLD-Framing/Rough-in | 1/27/2017 | 1/30/2017 | 1/30/2017 | A | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 1/20/2017 | 1/23/2017 | 1/23/2017 | A | PASS |
Dave Hannah
|
|
|
Partial ceiling framing - Joel Phone #: ###-#### first floor rest rooms and second floor offices ok to cover
|
BLD-Framing/Rough-in | 1/17/2017 | 1/18/2017 | 1/18/2017 | A | PASS |
Dave Hannah
|
|
|
Dave Phone #: ###-####
|
BLD-Conference | 1/17/2017 | 1/18/2017 | 1/18/2017 | A | PASS |
Dave Hannah
|
|
|
Dave Phone #: ###-####
|
BLD-Conference | 1/3/2017 | 1/4/2017 | 1/4/2017 | A | PEND |
Dave Hannah
|
|
|
Joel Phone #: ###-#### ground level ceiling higth in rest rooms down to 7-3 becouse of beams
|
BLD-Framing/Rough-in | 12/22/2016 | 12/23/2016 | 12/23/2016 | A | PART |
Tony Young
|
|
|
Joel-Partial Phone #: ###-####-0155,, 2 beams on 2nd floor,, pending special inspection ,, mech room fire wall and walls in classroom,, as noted on plans,, ok to cover pending trades
|
BLD-Framing/Rough-in | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | PASS |
Dave Hannah
|
|
|
joel Phone #: ###-#### mez framing ok
|
BLD-Framing/Rough-in | 12/8/2016 | 12/9/2016 | 12/12/2016 | A | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 11/30/2016 | 11/30/2016 | 12/1/2016 | P | PASS |
Dave Hannah
|
|
|
joel Phone #: ###-####
|
BLD-Framing/Rough-in | 11/23/2016 | 11/28/2016 | 11/28/2016 | A | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | PASS |
Dave Hannah
|
|
|
joel Phone #: ###-####
|
BLD-Framing/Rough-in | 11/10/2016 | 11/10/2016 | 11/14/2016 | P | PART |
Dave Hannah
|
|
|
Joel Phone #: ###-#### ok to one side 1st floor
|
BLD-Framing/Rough-in | 10/25/2016 | 10/26/2016 | 10/27/2016 | P | PART |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-#### ramp sheerok/ soffits 2 nd floor ok
|
BLD-Other | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Dave Hannah
|
|
|
Scott// stairwell inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PART |
Dave Hannah
|
|
|
Joel Phone #: ###-#### stair one ok
|
BLD-Energy code compliance | 9/21/2016 | 9/22/2016 | 9/23/2016 | A | PART |
Dave Hannah
|
|
|
Joel Phone #: ###-#### basement ceiling and wall on ally side 2 thru 4
|
BLD-Energy code compliance | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 9/12/2016 | 9/12/2016 | 9/13/2016 | P | PART |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2016 | 8/24/2016 | 8/30/2016 | P | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-#### east end second floor
|
BLD-Energy code compliance | 8/24/2016 | 8/25/2016 | 8/26/2016 | P | PART |
Dave Hannah
|
|
|
Joel Phone #: ###-#### east half second floor ok to cover
|
BLD-Energy code compliance | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | PART |
Mike Jordan
|
|
|
David Phone #: ###-####. Ok to rock exterior walls(west and south west ends) 2nd. floor only. Contractor to send RFI for insulation between top of wall and bottom of 3rd. floor.
|
BLD-Framing/Rough-in | 8/16/2016 | 8/17/2016 | 8/17/2016 | A | PASS |
Mike Jordan
|
|
|
David Phone #: ###-####. 2nd floor, interior steel stud walls and furred walls, west end and south west portion only. Ok to insulate exterior furred walls.
|
BLD-Energy code compliance | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | PART |
Dave Hannah
|
|
|
Joel Phone #: ###-#### ok to cover 4th floor
|
BLD-Framing/Rough-in | 8/4/2016 | 8/8/2016 | 8/8/2016 | A | PEND |
Dave Hannah
|
|
|
Joel 4th floor Phone #: ###-#### ok to insulate after other trades ok
|
CHANGE STATUS TO (ISS) | | | 8/3/2016 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 8/3/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/18/2016 | 4/18/2016 | 4/21/2016 | | PASS |
Carl Westfall
|
|
|
Athlos - plan mod
|
Routing - PLAN CHECK | 4/18/2016 | | 4/21/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - FIRE | 4/20/2016 | | 4/21/2016 | | PASS |
Katie Marron
|
|
|
Modified report attached to case.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2016 | | DONE |
|
|
|
PLAN MOD
|
Permit Ready to Issue | | | 4/21/2016 | | DONE |
|
|
|
DO NOT RE-ISSUE THIS IS A PLAN MOD WITH FEES DUE
|
Routing - Design Review | 4/20/2016 | | 4/20/2016 | | PASS |
Andrea Tuning
|
|
|
|
Plan Modification Accepted | | | 4/18/2016 | | DONE |
Christina Prado
|
|
|
Interior updates to elevator, stairs and other misc. details per RMH
|
Issue PAID IN FULL permit | | | 3/23/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/23/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/24/2016 | 1/24/2016 | 3/18/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) ATHLOS - PHASE 3 - TI (Feb 4 - 10 days) (Feb 11 - 15 days) Level 3 TI - ePlanReview
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/18/2016 | | DONE |
Christina Prado
|
|
|
**ALL MET*** Need GC Form & Revised certificate of value for issuance
|
Routing - PLAN CHECK | 3/16/2016 | | 3/18/2016 | | PASS |
Carl Westfall
|
|
|
Approved with redlines and documentation.
|
Routing - MECHANICAL | 3/16/2016 | | 3/16/2016 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 3/16/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/15/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/7/2016 | | 3/15/2016 | | FAIL |
Carl Westfall
|
|
|
2nd plan review completed
|
Routing - MECHANICAL | 3/8/2016 | | 3/15/2016 | | FAIL |
Troy James
|
|
|
|
Routing Off Site - STRUCTURAL | 3/8/2016 | | 3/11/2016 | | PASS |
Carl Westfall
|
|
|
Stapley - Chris Merrill
|
Routing - PLUMBING | 3/8/2016 | | 3/11/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - FIRE | 3/8/2016 | | 3/9/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Plan resubmittals received | | | 3/7/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 2/13/2016 | 2/16/2016 | 2/16/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 2/13/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/13/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/24/2016 | | 2/13/2016 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing PW Environmental | 1/25/2016 | | 2/10/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing Off Site - STRUCTURAL | 1/24/2016 | | 2/3/2016 | | FAIL |
Carl Westfall
|
|
|
Stapley - Chris Merrill
|
Routing - FIRE | 1/24/2016 | 1/24/2016 | 2/2/2016 | | FAIL |
Scott Arellano
|
|
|
Report attached to case and emailed to architect.
|
Routing - MECHANICAL | 1/24/2016 | | 2/2/2016 | | FAIL |
Troy James
|
|
|
|
Routing PW Geothermal | 1/25/2016 | | 1/28/2016 | | PASS |
Jon R. Gunnerson
|
|
|
Geothermal service in basement. Coordinate connection with Public Works, Jon Gunnerson, 208.384.3935
|
Routing - Erosion and Sediment | 1/24/2016 | | 1/27/2016 | | PASS |
Evan Jenkins
|
|
|
Please Reference ESC15-01322 for ESC Converage
**Project Management - Ron Hill**GREEN TAG-PRIORITY REVIEW (ATHLOS HEADQUARTERS - Phase 3 Interior Tenant Improvement) Offices, training facilities, leasable space (3rd floor), restrooms, and support spaces. Includes all mechanical and electrical upgrades. Special Inspections required for fabricators, steel other than structural, structural steel, concrete, masonry, wood high-load diaphragms, soils, seismic resistance upgrade work
|
Routing - PLUMBING | 1/24/2016 | | 1/26/2016 | | FAIL |
Bill VanDegrift
|
|
|
1) Interceptor needs to be a flammable liquids interceptor.
2) vapor compartment vent needs to be piped to the exterior independently.
3) Downstream interceptor vent needs to be 3”.
4) All R.P.’s need to be mounted over a floor sink.
5) Provide information explaining why 1st floor drainage needs to discharge to the basement ejector.
|
Routing PW Solid Waste | 1/25/2016 | | 1/26/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing - Addressing | 1/24/2016 | | 1/25/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 1/24/2016 | | 1/25/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 1/24/2016 | | 1/25/2016 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH15-00444
|
Pending Assignment by JCB | 1/24/2016 | | 1/24/2016 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 1/22/2016 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Tim Woodard and plan review fees paid.
|
Application received | | | 1/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 20 2016 3:45PM
|