BLD-Final | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2016 | 10/26/2016 | 10/26/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | CANC |
Phil Shearer
|
|
|
Brett Phone #: ###-####
|
BLD-Footing | 5/5/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
BLD-Energy code compliance | 4/15/2016 | 4/18/2016 | 4/18/2016 | A | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
BLD-Energy code compliance | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Phil Shearer
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 4/12/2016 | 4/13/2016 | 4/14/2016 | A | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
BLD-Foundation | 2/29/2016 | 3/2/2016 | 3/2/2016 | A | PASS |
Dave Hannah
|
|
|
Terry Phone #: ###-####
|
OVERRIDE | | | 2/19/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 1/22/2016 | 1/22/2016 | 2/19/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/19/2016 | | 2/19/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 2/19/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 2/19/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/19/2016 | | DONE |
|
|
|
***ALL REQUIRMENTS MET 2-19-16 /CEV
Needs RP
|
Inspection Record Card- Bld | | | 2/19/2016 | | DONE |
|
|
|
|
Telephone call | | | 2/19/2016 | | DONE |
|
|
|
called customer and notified that the permit is ready
|
Telephone call | | | 2/19/2016 | | DONE |
|
|
|
left message for owner to notify that the permit was ready and that the contractor (Ogata Construction) was notified
|
Issue PAID IN FULL permit | | | 2/19/2016 | | DONE |
|
|
|
|
Routing PW Flood Plain | 1/22/2016 | | 2/18/2016 | | PASS |
Jim Wyllie
|
|
|
Substantial Improvement criteria is not met. Floodplain requirements do not apply. Floor additions are at existing finish floor elevations.
Jim Wyllie / ###-####
|
Routing Walk-In (Zoning) | 1/22/2016 | 1/22/2016 | 1/22/2016 | P | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 1/22/2016 | | 1/22/2016 | | FAIL |
Brian McGowan
|
|
|
Need to go through Flood plain PW and Jim Wyllie
|
1st review completed | | | 1/22/2016 | | FAIL |
Brian McGowan
|
|
|
Need to go to PW and Jim Wyllie for flood plain
|
Application received | | 1/22/2016 | | | |
|
|
|
|