BLD-Final | 3/17/2016 | 3/18/2016 | 3/18/2016 | A | PASS |
Dave Hannah
|
|
|
Please call 30min prior for access - Keith Phone #: ###-####
|
Permanent Occupancy | | | 3/18/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Jim Page
|
|
|
All previously noted items repaired, final life fire safety inspection passed/complete
|
FIRE-Final Inspection | 3/1/2016 | 3/1/2016 | 3/1/2016 | P | PART |
Jim Page
|
|
|
Fire sprinkler has current inspection tag, fire extinguishers have current inspection tags. Exit lights have been repaired and are now functional. Emergency egress lighting has been repaired and are now functional. Final item for repair is the smoke detector missing located in the basement and inspection of smoke curtian operation on each floor for the elevator.
|
BLD-Final | 2/24/2016 | 2/25/2016 | 2/25/2016 | A | CANC |
Dave Hannah
|
|
|
Keith// please call 30 min. prior Phone #: ###-####
|
FIRE-Final Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | FAIL |
Jim Page
|
|
|
Exit lights did not stay illumunated when test button was pressed, all exit lights need serviced/replaced. Emergency egress lights would not illuminate when test buttons were pressed, all egress lights need to be serviced/replaced. Smoke detector missing in front of elevator at the basement level, smoke detector needs to be installed and verified for operation for smoke curtian activation. Smoke detectors on 1st floor as well as attic level need to be tested for operation with smoke curtian activation.
|
Place hold on job | 1/25/2016 | | 2/12/2016 | | DONE |
Kristal Soland
|
|
|
PLEASE ISSUE MIS16-00018 WITH THIS BUILDING PERMIT
|
Issue PAID IN FULL permit | | | 2/12/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/12/2016 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 1/25/2016 | 1/25/2016 | 1/25/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 1/25/2016 | | 1/25/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Reviewer's activity | | | 1/25/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
spoke with Sara and Matt in histoic review and neither of them said they needed to sign off on the planning approval.
|
1st review completed | | | 1/25/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 1/25/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/25/2016 | | DONE |
|
|
|
all requirements met- this permit is being paid for internally through JV account
|
Print Occupancy Form | | | 1/25/2016 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2016 | | |
|
|
|
called Scott- left message that permit is ready for pick up
|
Plans ACCEPTED BY PLAN TECH | | | 1/25/2016 | | DONE |
|
|
|
|
Intake Approval | | | 1/25/2016 | | PASS |
|
|
|
|
First Notice | | 3/28/2016 | | | |
|
|
|
|
Application received | | 1/25/2016 | | | |
|
|
|
|