Permit Information
Permit NumberBLD16-00221
StatusFinaled
Name BRIGHTON HOMES IDAHO INC
Site Address 6648 E PLAYWRIGHT DR
Project NameRIVER HEIGHTS#6 RETAINING WALL
Customer Number 
ePlanReviewYes
Description
Permit for (2) 4-foot concrete block retaining walls on Block 7 of River Heights No. 6 subdivision. All work is to be done per approved plans, engineering and current local codes. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/27/201612/27/201612/27/2016PPASS
DetailsPhil Shearer
BLD-Aging Inspection12/26/201612/26/201612/27/2016 DONE
DetailsPhil Shearer
BLD-Aging Inspection12/27/201612/27/201612/27/2016 DONE
DetailsPhil Shearer
DOC - Permit Finaled12/27/201612/27/201612/27/2016PPASS
DetailsPhil Shearer
BLD-Final3/29/20163/29/20163/29/2016PNR
DetailsPhil Shearer
Erby Phone #: ###-####. Need fence post to be installed
Issue PAID IN FULL permit  2/11/2016 DONE
Routing PW Grading-Hillside2/10/2016 2/10/2016 PASS
DetailsJason C. Taylor
Routing - PLAN CHECK2/10/2016 2/10/2016 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  2/10/2016 DONE
Permit Ready to Issue  2/10/2016 DONE
DetailsChristina Prado
All requirements met
Telephone call  2/10/2016 DONE
Josh called in making sure we had everything that is needed for issuance. I informed we have everything and the fee amount that is due.
Plan assigned to (LEG) Tisha1/28/2016 2/10/2016 DONE
DetailsTisha Gallop
1st review 2/1 walk-in (x2 4' retaining wall) need structural calcs for supporting surcharge
Routing PW Grading-Hillside2/9/2016 2/9/2016 FAIL
DetailsJason C. Taylor
See changemarks in eplan. JCT
Routing - PLANNING2/9/2016 2/9/2016 PASS
DetailsDavid Moser
The moved the walls so they are 5 feet apart
Routing - PLANNING2/5/2016 2/5/2016 FAIL
DetailsDavid Moser
Retaing walls exceed 6 feet in height in rear setback
Routing - PLAN CHECK1/28/2016 2/1/2016 FAIL
DetailsTisha Gallop
need structural engineering and calcs for retaining wall supporting surcharge
Routing - PLANNING1/28/2016 2/1/2016 FAIL
DetailsDavid Moser
The two four foot high retaining walls are required to be separated by 5 feet or the combined walls shall not exceed 6 feet in height.
Routing PW Grading-Hillside1/28/2016 2/1/2016 FAIL
DetailsJason C. Taylor
per ePlan
1st review completed  2/1/2016 FAIL
DetailsTisha Gallop
Routing - Erosion and Sediment2/1/2016 2/1/2016 CANC
DetailsTisha Gallop
per Evan Jenkins subdiviaion ESC will cover this retaining wall, no ESC review required.
Plans ACCEPTED BY PLAN TECH  1/28/2016 DONE
DetailsChristina Prado
Intake Approval  1/28/2016 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  1/28/2016 DONE
DetailsChristina Prado
Application received  1/26/2016 DONE
Application submitted via PDS Online on Jan 26 2016 9:53AM
Intake Approval  1/26/2016 FAIL
DetailsCarlos Velazquez
must provide plans for the construction of the retaining wall; see 406 checklist for requirments