BLD-Final | 6/14/2016 | 6/15/2016 | 6/15/2016 | A | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####
|
DOC - Permit Finaled | 6/15/2016 | 6/15/2016 | 6/15/2016 | P | PASS |
Tony Young
|
|
|
signed paperwork
|
BLD-Framing/Rough-in | 3/2/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####,, new header ok
|
CHANGE STATUS TO (ISS) | | | 3/2/2016 | | DONE |
|
|
|
all plan mod fees paid
|
Routing Walk-In (BLD) | 2/19/2016 | 2/19/2016 | 2/19/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/19/2016 | | 2/19/2016 | | PASS |
Brian McGowan
|
|
|
Different windows and header to be installed.
|
Case Summary (BLD) | | | 2/19/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2016 | | DONE |
Brian McGowan
|
|
|
|
(F) Reprint permit | | | 2/19/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/19/2016 | | DONE |
|
|
|
modification to exterior wall
|
BLD-Framing/Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 | A | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####
|
Routing Walk-In (BLD) | 1/27/2016 | 1/27/2016 | 1/27/2016 | A | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 1/27/2016 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 1/27/2016 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 1/27/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/27/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/27/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 1/26/2016 | 1/26/2016 | 1/26/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 1/26/2016 | | | |
|
|
|
|