First Notice | | 10/22/2016 | 11/15/2016 | | DONE |
|
|
|
Mailed 11-16-16
|
Permanent Occupancy | | | 10/12/2016 | | DONE |
|
|
|
|
BLD-Final | 10/6/2016 | 10/10/2016 | 10/10/2016 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok for perm occ
|
BLD-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | NR |
Dave Hannah
|
|
|
Bob Phone #: ###-#### needs stairway signage
|
Zoning Approval | 9/21/2016 | 9/21/2016 | 9/21/2016 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Final | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags, level 1 tenant space area is unoccupied space at time of inspection so no fire extinguishers or exit signs, fire sprinkler system is active. Final life fire safety inspection passed/complete.
|
BLD-Conference | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | DONE |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | CANC |
Mike Jordan
|
|
|
Insulation Bob Phone #: ###-####. Per contractor, inspector #425 has already inspected and inspection request was made in error.
|
BLD-Energy code compliance | 7/27/2016 | 7/27/2016 | 7/27/2016 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Energy code compliance | 7/25/2016 | 7/26/2016 | 7/27/2016 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### first floor ok to insulate
|
BLD-Energy code compliance | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-####second floor ok to cover
|
BLD-Framing/Rough-in | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to insulate second floor
|
BLD-Energy code compliance | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | CANC |
Dave Hannah
|
|
|
Insulation // Bob Phone #: ###-#### ok to cover 3rd floor
|
BLD-Framing/Rough-in | 7/8/2016 | 7/11/2016 | 7/11/2016 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####-floor 3
|
BLD-Energy code compliance | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to cover 4th floor
|
BLD-Energy code compliance | 7/5/2016 | 7/5/2016 | 7/5/2016 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### 4th floor walls ok to insulate
|
BLD-Energy code compliance | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PART |
Dave Hannah
|
|
|
Insulation // Bob Phone #: ###-#### ceiling first floor ok to lid
|
BLD-Framing/Rough-in | 6/29/2016 | 6/29/2016 | 7/1/2016 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### first floor ok
|
BLD-Energy code compliance | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | PART |
Dave Hannah
|
|
|
4th floor // Bob Phone #: ###-#### ok to prerock
|
BLD-Framing/Rough-in | 6/17/2016 | 6/17/2016 | 6/20/2016 | P | PART |
Dave Hannah
|
|
|
Bob-partial frame on 4th floor Phone #: ###-#### 4th floor ok to insulate
|
BLD-Energy code compliance | 6/13/2016 | 6/14/2016 | 6/16/2016 | A | PART |
Dave Hannah
|
|
|
Part Insulation // Bob Phone #: ###-#### second floor comon areas ok to cover
|
BLD-Framing/Rough-in | 6/14/2016 | 6/14/2016 | 6/16/2016 | P | PART |
Dave Hannah
|
|
|
3rd Floor; Bob Phone #: ###-#### hallways and comon areas bath rooms ok to insulate
|
BLD-Energy code compliance | 6/15/2016 | 6/16/2016 | 6/16/2016 | A | PART |
Dave Hannah
|
|
|
Bob-partial on 3rd floor insulation for sheet rock Phone #: ###-#### ceilings on 3rd floor hallways and comon areas ok to rock
|
BLD-Energy code compliance | 6/10/2016 | 6/13/2016 | 6/13/2016 | P | NR |
Dave Hannah
|
|
|
Part Insulation // Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 6/8/2016 | 6/9/2016 | 6/10/2016 | P | PART |
Dave Hannah
|
|
|
Part // Bob Phone #: ###-#### ok to start insulating 2nd floor
|
BLD-Wall Bracing | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 5/27/2016 | 5/31/2016 | 5/31/2016 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to cover 1st floor ext walls
|
BLD-Conference | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | DONE |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/17/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/17/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/2/2016 | | 5/2/2016 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 5/2/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/2/2016 | | DONE |
Christina Prado
|
|
|
***ALL REQUIRMENTS MET 5-17-16
Need ACHD for issuance
|
Plan assigned to (TLW) | 2/18/2016 | | 5/2/2016 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete
|
Plan resubmittals received | | | 4/13/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/10/2016 | 3/13/2016 | 3/11/2016 | | PASS |
Stephanie Jensen
|
|
|
|
Routing - PLAN CHECK | 2/18/2016 | | 3/10/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Street Lights | 2/19/2016 | | 3/10/2016 | | PASS |
Mike D Hedge
|
|
|
Approved in E-Plan. TLW
|
Routing PW Sewer Design | 2/19/2016 | | 3/10/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Approved in E-Plan. TLW
|
1st review completed | | | 3/10/2016 | | DONE |
|
|
|
|
Routing PW Environmental | 2/19/2016 | | 3/2/2016 | | PASS |
Rick Christenson
|
|
|
No more than 2 facilities in the same building can be connected to 1500 gallon exterior grease interceptor.
|
Routing - MECHANICAL | 2/18/2016 | | 2/24/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/18/2016 | | 2/24/2016 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing - FIRE | 2/18/2016 | 2/18/2016 | 2/23/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Drainage | 2/19/2016 | | 2/22/2016 | | CANC |
Jason C. Taylor
|
|
|
Plan approved under PWK16-00007 ODI 3484. No review required under this permit. JCT
|
Routing PW Solid Waste | 2/19/2016 | | 2/19/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Geothermal | 2/19/2016 | | 2/19/2016 | | PASS |
Jon R. Gunnerson
|
|
|
Not connecting onto geothermal district. Jon Gunnerson 384.3935
|
Routing - Addressing | 2/18/2016 | | 2/19/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/18/2016 | | 2/19/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 2/18/2016 | | 2/18/2016 | | PASS |
Andrea Tuning
|
|
|
|
Pending Assignment by TLW | 2/18/2016 | | 2/18/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 2/12/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | | 1/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 27 2016 2:57PM
|