Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00256
StatusFinaled
Name SYRINGA CONSTRUCTION LLC
Site Address 2628 N 36TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2597 sq. ft., two story (first story 1500 sq. ft., second story 1097 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 237 sq. ft. of covered patio’s/porches and 525 sq. ft. attached garage per the approved plans, and any notations. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference9/29/20169/30/20169/30/2016APASS
DetailsTony Young
Garage code 0713. Please call Steve 208.850.8424 with any questions. Thank you, steve... verify address,, 2622 .vs 2628,, permit has been changed to proper address
DOC - Permit Finaled9/30/20169/30/20169/30/2016PPASS
DetailsTony Young
done
BLD-Final9/27/20169/29/20169/29/2016APEND
DetailsTony Young
Final inspection for C of O. Plans on the counter inside. Garage code 0713. Please call Steve 208.850.8424 with any questions. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, all ok,, just need to verify address,, permit .vs house #s
BLD-Wall Bracing6/30/20167/5/20167/5/2016APASS
DetailsTony Young
Exterior shear inspection completed and passed. This inspection is for Drywall Shear inspection. Several areas inside with 7" screw pattern completed. Call Steve with any questions. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Energy code compliance6/27/20166/28/20166/28/2016APASS
DetailsTony Young
Need a framing re-inspect ; an energy inspection. We have the ''tempered glass'' ordered for the window next to the front door. Once the glass is here this will be changed out. Any questions please give me a call. Thanks! Phone #: ###-#### Inspection requested via web by Kim Winkle
BLD-Framing/Rough-in6/22/20166/24/20166/24/2016APART
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Kim Winkle. point load for beam over fireplace and beam to the right of the fireplace. OK to insulate
BLD-Wall Bracing6/10/20166/13/20166/13/2016APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Kim Winkle,, exterior ok
BLD-Foundation5/12/20165/12/20165/12/2016PPASS
DetailsPhil Shearer
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Foundation5/11/20165/12/20165/12/2016ANR
DetailsPhil Shearer
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing5/10/20165/10/20165/10/2016PPART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, work in progess
BLD-Footing5/9/20165/10/20165/10/2016ANR
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Footings excavated. No one here, no forms on site, no lot lines strung. Needs to reschedule inspection.
BLD-Conference5/3/20165/4/20165/4/2016APASS
DetailsDave Hannah
Need erosion control inspection prior to dig. STeve is site contact at 850.8424. thanks. steve Phone #: ###-#### Inspection requested via web by steve hanson
Issue PAID IN FULL permit  4/26/2016 DONE
OVERRIDE  2/25/2016  
Plan assigned to (DAF)2/1/20162/1/20162/25/2016 DONE
DetailsDavid Ferguson
due 2/11 - Need tall wall engineering, roof plan(or truss specs), column sizes
Inspection Record Card- Bld  2/25/2016 DONE
Telephone call  2/25/2016 DONE
called Steve- left a message that permit is ready for pick up and fees due
Routing - PLAN CHECK2/25/2016 2/25/2016 PASS
DetailsDavid Ferguson
Case Summary (BLD)  2/25/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  2/25/2016 DONE
Permit Ready to Issue  2/25/2016 DONE
All Met
Route to Impact Fee Review2/8/20162/11/20162/10/2016 PASS
DetailsCindy M. Gould
1st review completed  2/8/2016 FAIL
DetailsDavid Ferguson
Routing - PLAN CHECK  2/8/2016 FAIL
DetailsDavid Ferguson
Routing - MECHANICAL2/1/2016 2/2/2016 PASS
DetailsTroy James
Routing - PLANNING1/29/2016 2/1/2016 PASS
DetailsColleen T Carroll
Plan assigned to (LEG) Tisha1/28/2016 2/1/2016 DEFR
DetailsTisha Gallop
Routing - PUBLIC WORKS1/28/2016 1/29/2016 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  1/28/2016 DONE
Intake Approval  1/28/2016 PASS
Recd Pcfee & Taken To Pln CK  1/28/2016 DONE
Routing - Addressing1/28/2016 1/28/2016 PASS
DetailsLaura Hunter
Application received 1/28/2016