Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00265
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 1307 S EAGLE FLIGHT WAY
Project NameTaos Restroom Remodel
Customer Number 
ePlanReviewYes
Description
**(TAOS - RESTROOM REMODEL)** Permit is to remodel Men’s and women’s restrooms and adding 108 sq. ft. to the men’s restroom within the 34,750 sq. ft. existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: Removal of select interior nonbearing wall, removal of select door frame openings, remove two existing men’s restroom urinals and urinal partitions, removal of suspended ceiling in new men’s restroom area, construction of select wall opening infill, move women’s rest room to the existing men’s restroom and add two accessible height toilets, add partitions to new women’s toilets, adding (7) new urinals with partitions of which one will be an accessible height urinal and a ADA sink in the new men’s restroom area, new light fixtures, electrical work, mechanical work, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  8/17/2016 DONE
First Notice6/13/20166/13/20167/11/2016 DONE
DetailsCandy A. Nichols
BLD-Final6/9/20166/13/20166/13/2016PPASS
DetailsMike Jordan
Colyn Phone #: ###-####
DOC - Permit Finaled6/13/20166/13/20166/13/2016PPASS
DetailsMike Jordan
FIRE-Final Inspection6/9/20166/13/20166/13/2016APASS
DetailsTroy Cobbley
Life safety passed. I suggested that the contractor contact the plan reviewer and discuss the two existing doors in the corridor that are not shown on the plans.
Letter of compliance/Occupancy  6/13/2016 DONE
Issue PAID IN FULL permit  3/2/2016 DONE
Inspection Record Card- Bld  3/2/2016 DONE
Plan assigned to (JG)2/3/20162/3/20162/4/2016 PASS
DetailsJavier Guzman
2/09 L1 TAOS RESTROOM REMODEL eplan
Routing - PLAN CHECK2/3/2016 2/4/2016 PASS
DetailsJavier Guzman
Routing - Addressing2/3/2016 2/4/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/3/2016 2/4/2016 PASS
DetailsJennifer Bruner
Routing PW Sewer Rating2/4/2016 2/4/2016 PASS
DetailsJennifer Bruner
1st review completed  2/4/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  2/4/2016 DONE
Permit Ready to Issue  2/4/2016 DONE
DetailsChristina Prado
All requirements met
Intake Approval  2/3/2016 PASS
DetailsJavier Guzman
Application received  1/28/2016 DONE
Application submitted via PDS Online on Jan 28 2016 2:56PM