First Notice | | 10/21/2016 | 11/14/2016 | | DONE |
|
|
|
Mailed 11-14-16 PDF
|
Permanent Occupancy | | | 10/11/2016 | | DONE |
|
|
|
|
BLD-Final | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Mike Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguishers as discussed for both levels, remove deadbolts from the restroom doors and provide single action hardware or get building code official approval.
|
BLD-Final | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | NR |
Jim Sly
|
|
|
Please call for access - Mike Phone #: ###-#### Need Permit and final insp. on Mech. Need fire/life safety and CDHD.
|
Zoning Approval | 8/24/2016 | 8/24/2016 | 8/24/2016 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Framing/Rough-in | 6/30/2016 | 6/30/2016 | 6/30/2016 | A | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-#### Please call 30 min. prior to going out.
|
BLD-Framing/Rough-in | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | NR |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | NR |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PART |
Jim Sly
|
|
|
Mike-wall grout Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Wall cover | 5/24/2016 | 5/24/2016 | 5/25/2016 | P | PART |
Jim Sly
|
|
|
Mike Phone #: ###-#### CMU 1st lift...... OK pending MTI special inspection tests and approvals.
|
BLD-Footing | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Jim Sly
|
|
|
Mike-would like inspection at noon if possible Phone #: ###-#### OK pending MTI special inspections, tests and approvals.
|
Issue PAID IN FULL permit | | | 4/26/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/26/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/26/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/15/2016 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/15/2016 | | DONE |
Christina Prado
|
|
|
All requirements met 3/18/16 C_P/// Need ACHD, RP, GC Form & Revised Certificate of value for issuance
|
Routing Off Site - STRUCTURAL | 3/8/2016 | | 3/15/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 2/2/2016 | | 3/15/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - ELECTRICAL | 3/8/2016 | | 3/10/2016 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 3/8/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 2/24/2016 | 2/27/2016 | 2/26/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 2/24/2016 | | DONE |
|
|
|
|
Routing - Design Review | 2/2/2016 | | 2/24/2016 | | PASS |
Sarah Schafer
|
|
|
Approved in E-Plan. TLW
|
Routing - PLAN CHECK | 2/2/2016 | | 2/24/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines. TLW
|
Routing - PLANNING Land Div | 2/2/2016 | | 2/24/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E plan Review
|
Routing Off Site - STRUCTURAL | 2/2/2016 | | 2/24/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 2/3/2016 | | 2/16/2016 | | PASS |
Brian Murphy
|
|
|
LESS THAN 1000SQ
|
Routing - MECHANICAL | 2/2/2016 | | 2/5/2016 | | PASS |
Troy James
|
|
|
redlined drawings
|
Routing - ELECTRICAL | 2/2/2016 | | 2/4/2016 | | FAIL |
Javier Guzman
|
|
|
relocate panel
|
Routing - FIRE | 2/2/2016 | 2/2/2016 | 2/3/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Sewer Rating | 2/3/2016 | | 2/3/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 2/2/2016 | | 2/3/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/2/2016 | | 2/3/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 2/2/2016 | | 2/3/2016 | | PASS |
Evan Jenkins
|
|
|
(CENTENNIAL HIGH SCHOOL - Concessions Stand) To replace the existing concession / restroom building with a new concessions and restroom building with a second floor press box.
|
Routing - PLUMBING | 2/2/2016 | | 2/3/2016 | | PASS |
Daryl Spivey
|
|
|
1) ASSE 1070 MIXING VALVE REQUIRED AT PUBLIC LAVS
2) ET-1 AT WATER HEATER
|
Pending Assignment by TLW | 2/2/2016 | | 2/2/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 2/1/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete and upload the 502 check list and any additional documents required by the check list. The pre screen can not be done until this check list is received. Thank you
|
Intake Approval | | | 2/1/2016 | | PASS |
|
|
|
|
Application received | | | 1/29/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2016 1:35PM
|