Permit Information
Permit NumberBLD16-00286
StatusFinaled
Name TROY LINDSEY CONST INC
Site Address 2901 W NEFF ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Remodel of existing home (kitchen, hall, Living room) and addition of Mst. Bedroom/Mst. Bath and closet. (720 square feet of new construction). Existing furnace to be relocated into new Utility Room. REScheck has been provided. New smoke detectors and carbon monoxide alarms are to be added as per code. All work to bedone according to plans, notes and local codes. Separate electrical, plumbing, mechanical and erosion permits are required. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/14/2016 DONE
Case Summary (BLD)  7/14/2016 DONE
BLD-Final4/12/20164/13/20164/13/2016APASS
DetailsTony Young
Troy Phone #: ###-####
DOC - Permit Finaled4/13/20164/13/20164/13/2016PPASS
DetailsTony Young
BLD-Energy code compliance3/7/20163/9/20163/9/2016APASS
DetailsTony Young
Troy Phone #: ###-####
BLD-Framing/Rough-in3/7/20163/7/20163/7/2016PPART
DetailsTony Young
Troy Phone #: ###-####,, ok to insulate,, need mech all the way roughed in
BLD-Wall cover2/25/20162/26/20162/26/2016APASS
DetailsTony Young
shear // Troy Phone #: ###-####
BLD-Footing2/12/20162/16/20162/16/2016APASS
DetailsJim Sly
Foundation // Troy Phone #: ###-####
OVERRIDE  2/1/2016  
Routing Walk-In (Zoning)2/1/20162/1/20162/1/2016PPASS
DetailsJosh Wilson
Ok per R-1C setbacks. JGW
Routing Walk-In (BLD)2/1/20162/1/20162/1/2016PDONE
DetailsBrian McGowan
1st review completed  2/1/2016 DONE
DetailsBrian McGowan
Routing - PLAN CHECK2/1/2016 2/1/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  2/1/2016 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  2/1/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  2/1/2016 DONE
Case Summary (BLD)  2/1/2016 DONE
Permit Ready to Issue  2/1/2016 DONE
Needs Responsible Person
Issue PAID IN FULL permit  2/1/2016 DONE
Application received 2/1/2016