Permit Information
Permit NumberBLD16-00305
StatusFinaled
Name SMITHCRAFT CONSTRUCTION LLC
Site Address 658 E BOISE AVE
Project NameEastgate Facade Remodel
Customer NumberDRH15-00366
ePlanReviewNo
Description
(EASTGATE SHOPPING CENTER – SOUTH EXTERIOR FAÇADE REMODEL) (DRH15-00366) Fire sprinklers used for building area increase and for fire area. To remodel the South exterior façade of the “Rite Aid” and “Master Lee’s Tae Kwon Do” tenant spaces. Work is to include overbuild framing on existing engineered trusses, tapered wood ledgers, wood structural panels, roofing, and exterior wall finishes. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Concealed combustible spaces are required to have fire sprinkler protection or otherwise comply with NFPA 13. A separate fire sprinkler permit shall be obtained prior to beginning any modification or installation work on such system. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  3/21/2018 DONE
Took drawings to records
Third Notice 4/16/20175/10/2017 DONE
Mailed 5-11
Second Notice 3/19/20174/11/2017 DONE
Mailed 4-12-17
First Notice2/15/20172/15/20173/9/2017 DONE
DetailsJim Storey
put in mail 3-10-17
BLD-Final2/15/20172/15/20172/15/2017PPASS
DetailsJim Storey
Robert Phone #: ###-####
DOC - Permit Finaled2/15/20172/15/20172/15/2017PPASS
DetailsJim Storey
FIRE-Final Inspection2/13/20172/14/20172/14/2017APASS
DetailsJim Page
Final life fire safety inspection passed/complete
Zoning Approval2/6/20172/6/20172/6/2017 PASS
DetailsSarah Schafer
BLD-Final1/30/20171/31/20171/31/2017PNR
DetailsJim Storey
Bob Phone #: ###-####
BLD-Framing/Rough-in11/21/201611/22/201611/22/2016APASS
DetailsJim Storey
Bob Phone #: ###-####
BLD-Framing/Rough-in11/2/201611/3/201611/3/2016APART
DetailsJim Storey
Bob Phone #: ###-#### ft ok wip
BLD-Framing/Rough-in10/31/201610/31/201610/31/2016PPASS
DetailsJim Storey
Robert Phone #: ###-####
BLD-Framing/Rough-in10/24/201610/25/201610/25/2016APASS
DetailsJim Storey
Bob Phone #: ###-####
Inspection Record Card- Bld  9/20/2016 DONE
Issue PAID IN FULL permit  9/20/2016 DONE
Plan assigned to (CJW)2/2/20162/2/20169/19/2016 PASS
DetailsCarl Westfall
(1st done) EASTGATE SHOPPING CENTER FACADE (Feb 22 - 15 days)
Routing - Design Review9/15/2016 9/19/2016 PASS
DetailsJosh Wilson
Routing - PLAN CHECK9/19/2016 9/19/2016 DONE
DetailsCarl Westfall
Routing completed
PLANS/APPL TAKEN TO FRONT DESK  9/19/2016 DONE
Permit Ready to Issue  9/19/2016 DONE
need GC and Rev Cert of Val
Inspection Record Card- Bld  9/19/2016 DONE
Telephone call  9/19/2016 DONE
Spoke with Doug informing him that this permit is ready to be picked up and that the GC needs to fill out the 302 and 306 forms
Routing - PLAN CHECK9/13/2016 9/15/2016 PASS
DetailsCarl Westfall
Plan resubmittals received  9/12/2016 DONE
Two copies of Structural Edge Engineering PLLC, Two copies of sheets A0.0, A0.1, A2.2, A2.3, A4.1, A4.2 and A5.0 Taken to Carl W
Plan Reviewer's activity  8/22/2016 DONE
Project on hold after receiving the following Email.

Carl,
Doug resubmitted revised plans last week and unfortunately I'll be revising the design one more time. Existing conditions make impractical to remove the exiting trusses.
Please set the plans aside when you receive them or stop your review if you have already begun.
Thanks,
Kevin
Routing - PLANNING8/17/2016 8/18/2016 PASS
DetailsJosh Wilson
Exterior changes ok
Routing - PLAN CHECK8/10/2016 8/17/2016 PASS
DetailsCarl Westfall
Drawings approved
Plan resubmittals received  8/15/2016 DONE
received two copies of Plan review report and sheets A0.0, A0.1, A2.2, A2.3, A4.0, A4.1, A4.2, A5.0- put on Carl's desk
Routing - PLANNING8/9/2016 8/10/2016 PASS
DetailsJosh Wilson
Plan resubmittals requested  8/9/2016 DONE
Routing - PLAN CHECK7/29/2016 8/9/2016 FAIL
DetailsCarl Westfall
Resubmittal came in late on Friday afternoon just before being gone for a week. Plan review report Emailed to the Architect.
Plan resubmittals received  7/29/2016 DONE
resubmittals received 2 sets of struc calcs and 2 each of sheets A0.0,A0.1, A2.2, A2.3, A4.0, A4.1, A4.2 & A5.0-took to Carl W
1st review completed  2/22/2016 DONE
Failed IBC
Plan resubmittals requested  2/22/2016 DONE
Send to Fire for the resubmittal review
Routing - PLAN CHECK2/3/2016 2/22/2016 FAIL
DetailsCarl Westfall
Revisions required to the drawings.
Routing - Addressing2/2/2016 2/3/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/2/2016 2/3/2016 PASS
DetailsJennifer Bruner
Routing - PLANNING2/3/2016 2/3/2016 PASS
DetailsJosh Wilson
Plan Reviewer's activity  2/2/2016 PASS
Plan intake approved
Plans ACCEPTED BY PLAN TECH  2/2/2016 DONE
Intake Approval  2/2/2016 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  2/2/2016 DONE
Application received 2/2/2016