Permit Information
Permit NumberBLD16-00339
StatusVoid/No Violation
Name HUMMEL ARCHITECTS
Site Address 1276 W RIVER ST Unit: 100
Project NameBehavioral Health Services
Customer Number 
ePlanReviewNo
Description
** (BEHAVIORAL HEALTH SERVICES – 1st Floor, Suite #200,#202) ** Permit is to remodel an existing 8,987 sq. ft. 1st floor tenant space and tenant to occupy 4,830 sq. ft. of suites #200 and #202 on the second floor. Approval is contingent upon adhering to the approved plans on file. Work to include: construction of select interior nonbearing walls to create a 5’6” tall privacy wall at the reception area and to add a new door opening in the hallway at the north end of the building, adding a door holding device and (2) smoke detectors on both sides existing corridor door, electrical work, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. Note: No building construction work at the second floor areas. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
VOIDED CHANGE STATUS  2/7/2017 DONE
Per Greg with Hummel Architects work is not being done on this project/space
Telephone call  2/3/2017 DONE
Left a message for Deanna Watson informing her that I left a couple of messages with Greg (Hummel Architects) letting him know the permit for the TI in that space expired on 1/29/17 and haven't heard back from him. I also informed her that this permit is for their occupancy to be in that space and asked her to give me a call back. Behavioral Health Services are in there now
Telephone call  1/30/2017 DONE
Left a message for Greg informing him that this permit expired at 5pm 1/29 and that if he would like he is able to request an extension one last time. Informed him that this is for Behavioral Health Services occupancy as well so if they are in the space this permit would need to be picked up, paid for and inspections done.
BLD-Conference1/26/20171/27/20171/27/2017ADONE
DetailsDave Hannah
Permit is going to expire. Need to know if Behavioral Health Services is occupying the space. DO NOT EXPIRE PERMIT yes they are occ the space
Telephone call  1/19/2017 DONE
Left a message for Greg informing him that this permit is going to expire in 10 days and that he may send in a request for a 180 day extension if he would like. Gave him my email and the permit number
Expiration Notice1/10/20172/1/20171/10/2017 DONE
DetailsBrittany Hill
Telephone call  9/29/2016 DONE
customer called-asked me to send her the rec for payment-so i emailed it to her
Extend Review Timeline  8/12/2016 DONE
1st Approved 180 day extension per Adele. See documents
Telephone call  8/4/2016 DONE
Spoke with Greg informing that if they are going to send a request for an extension the the business needs to apply for occupancy to be in that space
BLD-Conference8/3/20168/3/20168/3/2016PDONE
DetailsMike Jordan
Permit has not been issued and is going to expire. Need to know if TI was completed and if Behavioral Health Services is in the space. Permit is for TI and Occupancy. These spaces are occupied, No one knows of any remodel work.
Telephone call  8/3/2016 DONE
Left a message for Greg informing him that this permit expired yester day 8/2/16 and if he would like to send in a request for an extension or to let the permit expire to give me a call either way.
Telephone call  7/26/2016 DONE
Sent an email, see documents, to Greg Allen informing him that this permit is going to expire in 8 days and if he would like to request for an extension he may do so by emailing Adele.
Expiration Notice7/11/20168/1/20167/11/2016 DONE
DetailsBrittany Hill
Plan assigned to (JG)2/5/20162/5/20162/11/2016 PASS
DetailsJavier Guzman
2/11 L1 BEHAVIORAL HEALTH SERVICES ePlan
Routing - PLAN CHECK2/5/2016 2/11/2016 PASS
DetailsJavier Guzman
1st review completed  2/11/2016 DONE
DetailsJavier Guzman
Case Summary (BLD)  2/11/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  2/11/2016 DONE
Permit Ready to Issue  2/11/2016 DONE
need GC and rev cert of val
Print Occupancy Form  2/11/2016 DONE
Telephone call  2/11/2016 DONE
Left a message for Greg informing him that this permit is ready and the GC would need to fill out a 302 and a 306 for issuance
Routing - Addressing2/5/2016 2/5/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/5/2016 2/5/2016 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  2/5/2016 DONE
Intake Approval  2/5/2016 PASS
Recd Pcfee & Taken To Pln CK  2/5/2016 DONE
Application received 2/4/2016