First Notice | 3/14/2016 | 3/14/2016 | 4/12/2016 | | DONE |
Mike Jordan
|
|
|
mailed 4-13-16
|
BLD-Final | 3/11/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
Mike Jordan
|
|
|
Terry Phone #: ###-####
|
DOC - Permit Finaled | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 3/11/2016 | 3/14/2016 | 3/14/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 3/10/2016 | 3/11/2016 | 3/11/2016 | P | NR |
Mike Jordan
|
|
|
Please coordinate with Fire final and Electrical Final. Phone #: ###-#### Inspection requested via web by Terry Conner. Need a fire/life/safety final prior to bldg. final.
|
BLD-Framing/Rough-in | 3/2/2016 | 3/2/2016 | 3/2/2016 | A | PASS |
Mike Jordan
|
|
|
This will be for area 3 framing/ card is posted on door to room / please call 30 minutes before if possible for expected time of inspection and I can meet there if needed. Phone #: ###-#### Inspection requested via web by Terry Conner. INterior steel stud framed walls ok, pending electrical rough in inspection.
|
Issue PAID IN FULL permit | | | 2/29/2016 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 2/5/2016 | 2/5/2016 | 2/9/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/5/2016 | | 2/9/2016 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/9/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/9/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/9/2016 | | DONE |
|
|
|
***ALL REQUIRMENTS MET 2-29-16 /CEV
need GC and rev cert of val
|
Telephone call | | | 2/9/2016 | | DONE |
|
|
|
left message for customer notifying of requirments needed
|
Plans ACCEPTED BY PLAN TECH | | | 2/5/2016 | | DONE |
|
|
|
|
Intake Approval | | | 2/5/2016 | | |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/5/2016 | | |
|
|
|
|
Application received | | 2/5/2016 | | | |
|
|
|
|