Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD16-00397
StatusFinaled
Name BARBER JESSE R
Site Address 911 E WASHINGTON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
** Plan Modification 6-17-16 - Owners do not want to finish the Bedroom in the Basement. Keep as existing. Window well has been installed to meet code for future completion of Bedroom. ***BJM*** DRH16-00051**4/4/16 plan modification to change size of deck pier footing//leg **3/18/16 Plan modification to include new partition walls in existing conditioned basement to create new bedroom with furred out walls and egress opening, and new 137 rear deck. All work per Certificate of Appropriateness DHR16-00051//leg**Permit for interior remodel to create master bathroom out of existing room. No exterior work or work in the basement is approved at this time. Separate electrical, plumbing and mechanical permits are required. All work is to be done according to approved plans and current local codes. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/28/20166/28/20166/28/2016PPASS
DetailsDave Hannah
Robin Phone #: ###-####
DOC - Permit Finaled6/28/20166/28/20166/28/2016PPASS
DetailsDave Hannah
Zoning Approval6/21/20166/21/20166/21/2016 PASS
DetailsSarah Schafer
Approved.
BLD-Final6/17/20166/20/20166/20/2016APEND
DetailsDave Hannah
Jesse// please call before Phone #: ###-#### ok after zoning finals
Routing Walk-In (BLD)6/17/20166/17/20166/17/2016PDONE
DetailsBrian McGowan
Routing - PLAN CHECK6/17/2016 6/17/2016 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  6/17/2016 DONE
DetailsBrian McGowan
CHANGE STATUS TO (ISS)  6/17/2016 DONE
(F) Reprint permit  6/17/2016 DONE
BLD-Footing5/12/20165/12/20165/12/2016PPASS
DetailsDave Hannah
Kelly Phone #: ###-####
Plan Modification Accepted  4/4/2016 DONE
Copy of sheets A1.0, A2.0, A3.0 and A4.0. Taken to Tisha
Plan assigned to (LEG) Tisha4/4/2016 4/4/2016 DONE
DetailsTisha Gallop
Routing - PLAN CHECK4/4/2016 4/4/2016 PASS
DetailsTisha Gallop
modified deck pier footings to 12" diam. 24" depth.
PLANS/APPL TAKEN TO FRONT DESK  4/4/2016 DONE
no fees for plan mod
CHANGE STATUS TO (ISS)  4/4/2016 DONE
BLD-Framing/Rough-in3/23/20163/24/20163/24/2016APEND
DetailsDave Hannah
Kelly Phone #: ###-#### master bath ok after plumbing rough in is oked
Routing Walk-In (Zoning)3/18/20163/18/20163/18/2016PPASS
DetailsMatthew A Halitsky
Routing Walk-In (BLD)3/18/20163/18/20163/18/2016PPASS
DetailsTisha Gallop
Inspection Record Card- Bld  3/18/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/18/2016 DONE
CHANGE STATUS TO (ISS)  3/18/2016 DONE
(F) Reprint permit  3/18/2016 DONE
Routing Walk-In (BLD)2/10/20162/10/20162/10/2016APASS
DetailsTisha Gallop
Plan assigned to (LEG) Tisha2/10/2016 2/10/2016 DONE
DetailsTisha Gallop
1st review completed  2/10/2016 DONE
Inspection Record Card- Bld  2/10/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/10/2016 DONE
Permit Ready to Issue  2/10/2016 DONE
all requirments met
Issue PAID IN FULL permit  2/10/2016 DONE
Application received 2/10/2016