BLD-Other | 4/21/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Tony Young
|
|
|
fire soffit; Wayne Phone #: ###-####
|
BLD-Energy code compliance | 4/14/2016 | 4/15/2016 | 4/15/2016 | A | PASS |
Tony Young
|
|
|
WAYNE Phone #: ###-####,, inside ok to sheetrock
|
BLD-Framing/Rough-in | 4/13/2016 | 4/14/2016 | 4/15/2016 | P | PART |
Tony Young
|
|
|
As late as possible // WAYNE Phone #: ###-####,, ok to sheet rock,, need soffits and siding to meet wui
|
BLD-Framing/Rough-in | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PART |
Jim Sly
|
|
|
Wayne Phone #: ###-#### C/N posted......OK to insulate.
|
BLD-Foundation | 3/3/2016 | 3/4/2016 | 3/4/2016 | A | PART |
Tony Young
|
|
|
Andy-pour at 10:00 Phone #: ###-####,, work in progress
|
BLD-Footing | 3/2/2016 | 3/3/2016 | 3/3/2016 | A | PASS |
Tony Young
|
|
|
Andy Phone #: ###-####
|
PubWorks Subgrade Approval | 3/2/2016 | 3/2/2016 | 3/2/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 2/24/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 2/11/2016 | 2/11/2016 | 2/24/2016 | | DONE |
Brian McGowan
|
|
|
due 3/2 L2 Hillside
|
Case Summary (BLD) | | | 2/24/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/24/2016 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 2/24/2016 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2016 | | DONE |
|
|
|
Spoke with Wayne informing him that this permit is ready and the fee amount that is due
|
Issue PAID IN FULL permit | | | 2/24/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 2/24/2016 | | PASS |
Brian McGowan
|
|
|
|
Routing - FIRE | 2/12/2016 | | 2/16/2016 | | PASS |
Katie Marron
|
|
|
Plans reviewed for FD Access. No comments required.
|
1st review completed | | | 2/16/2016 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 2/11/2016 | | 2/12/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade (3000 psi) is acceptable must be approved by Public Works prior to scheduling a footing inspection.
|
Routing PW Grading-Hillside | 2/10/2016 | | 2/11/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade (3000 psi) is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plan assigned to (LEG) Tisha | 2/10/2016 | | 2/11/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing Walk-In (Zoning) | 2/10/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/10/2016 | | DONE |
|
|
|
|
Application received | | 2/10/2016 | | | |
|
|
|
|