BLD-Final | 11/7/2016 | 11/8/2016 | 11/8/2016 | P | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####
|
DOC - Permit Finaled | 11/8/2016 | 11/8/2016 | 11/8/2016 | P | PASS |
Tony Young
|
|
|
bond in place,, c of o issued
|
BLD-Final | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | NR |
Tony Young
|
|
|
Bill Phone #: ###-####,, needs hillside final,, tempered glass,, fire caulking,, landing out lower door,, blower door test.. walk through only,,
|
BLD-Other | 9/6/2016 | 9/7/2016 | 9/7/2016 | P | PART |
Tony Young
|
|
|
Fire soffit - Phil Phone #: ###-####,, no vents yet
|
BLD-Other | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | PART |
Tony Young
|
|
|
Fire soffit - Phil Phone #: ###-####,, wip
|
BLD-Energy code compliance | 8/19/2016 | 8/22/2016 | 8/22/2016 | A | PASS |
Tony Young
|
|
|
Insulation // Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Phil Shearer
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 8/18/2016 | 8/18/2016 | 8/18/2016 | P | PART |
Phil Shearer
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2016 | 8/17/2016 | 8/18/2016 | P | FAIL |
Phil Shearer
|
|
|
Bill Phone #: ###-####
|
BLD-Wall Bracing | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PART |
Phil Shearer
|
|
|
Shear conference // Bill Phone #: ###-####. Engineer to verify the placement of one of the floor to floor straps
|
BLD-Wall Bracing | 8/12/2016 | 8/15/2016 | 8/15/2016 | P | FAIL |
Tony Young
|
|
|
Shear // Bill Phone #: ###-####,, not per plan
|
BLD-Wall Bracing | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | NR |
Tony Young
|
|
|
Shear // Bill Phone #: ###-####
|
BLD-Footing | 6/22/2016 | 6/22/2016 | 6/22/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | PART |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, work in progress,, ok to pour when ready
|
BLD-Footing | 5/2/2016 | 5/2/2016 | 5/2/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 4/20/2016 | 4/20/2016 | 4/20/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 3/18/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/15/2016 | | |
|
|
|
|
Telephone call | | | 3/15/2016 | | DONE |
|
|
|
Left a message for Gene informing him that this permit is ready and the fee amount that is due
|
Plan assigned to (LEG) Tisha | 2/11/2016 | | 3/15/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 3/11; plan check
|
Plan resubmittals received | | | 3/15/2016 | | DONE |
|
|
|
received e-mail from applicant
|
Routing - PLAN CHECK | 3/15/2016 | | 3/15/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/15/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/15/2016 | | DONE |
|
|
|
all requirements met
|
Routing - PLAN CHECK | 2/18/2016 | | 3/11/2016 | | FAIL |
Tisha Gallop
|
|
|
e-mailed Gene Harding list of comments
|
1st review completed | | | 3/11/2016 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 3/8/2016 | | 3/9/2016 | | PASS |
Andy J. Long
|
|
|
|
Routing - FIRE | 2/17/2016 | 2/11/2016 | 2/18/2016 | | PASS |
Katie Marron
|
|
|
Plans reviewed for FD access and water availability.
|
1st review completed | | | 2/18/2016 | | PASS |
|
|
|
|
Routing - MECHANICAL | | | 2/17/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/16/2016 | | 2/16/2016 | | PASS |
Susan Riggs
|
|
|
|
Routing - PUBLIC WORKS | 2/16/2016 | | 2/16/2016 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Grading-Hillside | 2/12/2016 | | 2/16/2016 | | PASS |
Jason C. Taylor
|
|
|
**COMPACTION TESTING REQUIRED FOR FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 2/11/2016 | | 2/11/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/11/2016 | | DONE |
|
|
|
|
Intake Approval | | | 2/11/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/11/2016 | | DONE |
|
|
|
|
Application received | | 2/11/2016 | | | |
|
|
|
|