BLD-Conference | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | DONE |
Jim Storey
|
|
|
Tony, not sure why this is still open but you came up for inspections. If you could call me when you are going up I will meet you there. I tried for today but your out of office. See you tomorrow. Phone #: ###-#### Inspection requested via web by jordan winspear
|
BLD-Conference | 9/1/2016 | 9/1/2016 | 9/1/2016 | P | DONE |
Jim Storey
|
|
|
Inspection requested via web by jordan winspear
|
DOC - Permit Finaled | 9/1/2016 | 9/1/2016 | 9/1/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Foundation | 5/9/2016 | 5/11/2016 | 5/11/2016 | A | PART |
Tony Young
|
|
|
Jordan; Phone #: ###-####,, work in progress
|
BLD-Footing | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PASS |
Tony Young
|
|
|
Jordan; Phone #: ###-####
|
BLD-Footing | 5/9/2016 | 5/9/2016 | 5/10/2016 | P | PEND |
Tony Young
|
|
|
Jordan; Phone #: ###-####,, need soils report approval from JT
|
PubWorks Subgrade Approval | 5/10/2016 | 5/10/2016 | 5/10/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the wall footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 4/27/2016 | | |
|
|
|
|
OVERRIDE | | | 4/27/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 4/27/2016 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 4/27/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/27/2016 | | DONE |
|
|
|
called Jordan to let know permit is ready-we removed the other contact so Jordan is the only contact on this permit
|
Issue PAID IN FULL permit | | | 4/27/2016 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 2/12/2016 | 2/12/2016 | 4/26/2016 | | DONE |
Brian McGowan
|
|
|
Planning Failed it due to 6' tall walls in front setback
|
Routing - PLAN CHECK | 4/26/2016 | | 4/26/2016 | | PASS |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 4/26/2016 | | 4/26/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Case Summary (BLD) | | | 4/26/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2016 | | DONE |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 4/22/2016 | | DONE |
|
|
|
received (2) sets of structural engineering
|
Routing PW Grading-Hillside | 4/19/2016 | | 4/19/2016 | | FAIL |
Jason C. Taylor
|
|
|
Retaining wall plans show ecology blocks but engineering has two designs (ecology & concrete). Which design is to be used? JCT ###-####
|
Routing - PLAN CHECK | 2/22/2016 | | 4/14/2016 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLANNING | 4/13/2016 | | 4/14/2016 | | PASS |
Colleen T Carroll
|
|
|
Per CVA16-00013. For replacement of the existing railroadties wall only. No other wall or fence at other locations is approved.
|
Plan resubmittals received | | | 2/22/2016 | | DONE |
|
|
|
Two copies of Waiver Request for ESC, Structural Edge Engineering PPLC and L-100. Taken to Brian M
|
1st review completed | | | 2/16/2016 | | FAIL |
Brian McGowan
|
|
|
Planning failed it.
|
Routing - PLAN CHECK | 2/12/2016 | | 2/16/2016 | | FAIL |
Brian McGowan
|
|
|
Planning failed it.
|
Routing - PLANNING | 2/12/2016 | | 2/12/2016 | | FAIL |
David Moser
|
|
|
The retaining wall is 6 feet high in front setback and max height is 3 feet.
|
Plans ACCEPTED BY PLAN TECH | | | 2/12/2016 | | DONE |
|
|
|
|
Intake Approval | | | 2/12/2016 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - Erosion and Sediment | 2/12/2016 | | 2/12/2016 | | PASS |
Evan Jenkins
|
|
|
New Hillside Retaining Wall
|
Application received | | 2/12/2016 | | | |
|
|
|
|