Second Notice | | 5/21/2016 | 5/17/2016 | | DONE |
|
|
|
This permit finaled on the web by Ed Olson
|
First Notice | 4/28/2016 | 4/28/2016 | 5/11/2016 | | DONE |
Mike Jordan
|
|
|
mailed 5-12-16
|
BLD-Final | 4/27/2016 | 4/28/2016 | 4/28/2016 | P | PASS |
Mike Jordan
|
|
|
Josh-pleae call 30 minutes prior to meet Phone #: ###-####
|
DOC - Permit Finaled | 4/28/2016 | 4/28/2016 | 4/28/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 4/25/2016 | 4/26/2016 | 4/26/2016 | A | NR |
Jim Sly
|
|
|
Josh Phone #: ###-#### Need verification of CDHD final......Need permit and inspections of Mechanical 4,000.00 valuation.
|
FIRE-Sprinkler Rough-in | 4/25/2016 | 4/25/2016 | 4/25/2016 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety passed
|
BLD-Final | 4/21/2016 | 4/22/2016 | 4/22/2016 | A | NR |
Mike Jordan
|
|
|
josh will try to be there, he would like for you to call 30 min. prior to going out. He has two Mavericks going on in the valley. Phone #: ###-####. Needs fire/life/safety, CDHD finals. Aslo a mech permit is required.
|
BLD-Other | 4/18/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Mike Jordan
|
|
|
Rebar - Josh Phone #: ###-####
|
OVERRIDE | | | 4/12/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/12/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/12/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/28/2016 | | |
|
|
|
|
Plan assigned to (JG) | 3/3/2016 | 3/3/2016 | 3/28/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 3/16 L3 Maverick - Cinnabon Remodel ePlan, Pending others
|
Routing - Addressing | 3/28/2016 | | 3/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Erosion and Sediment | 3/28/2016 | | 3/28/2016 | | PASS |
Evan Jenkins
|
|
|
signed off in ePlan by Evan jenkins. **(MAVERIK STORE #470 - CINNABON & COOLER EXTENSION)** To remodel within an existing a 4,600 sq. ft. maverick country store by adding a 220 sq. ft. Cinnabon within the existing convenience store and adding 37 sq. ft. of cooler to the exterior of the existing building.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/28/2016 | | DONE |
Christina Prado
|
|
|
**ALL MET** Need RP, GC & Revised Certificate of value for issuance
|
Routing - PLAN CHECK | 3/3/2016 | | 3/11/2016 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 3/11/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - FIRE | 3/3/2016 | 3/3/2016 | 3/3/2016 | | PASS |
Katie Marron
|
|
|
No comments required.
|
Routing PW Sewer Rating | 3/3/2016 | | 3/3/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Environmental | 3/3/2016 | | 3/3/2016 | | PASS |
Rick Christenson
|
|
|
Has existing 1500 Gallon Exterior Interceptor using same floor drains.
|
Routing - MECHANICAL | 3/3/2016 | | 3/3/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 3/3/2016 | | 3/3/2016 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing - Addressing | 3/3/2016 | | 3/3/2016 | | FAIL |
Laura Hunter
|
|
|
Vicinity map does not reflect correct location for address provided
|
Routing - PUBLIC WORKS | 3/3/2016 | | 3/3/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 3/3/2016 | | 3/3/2016 | | FAIL |
Evan Jenkins
|
|
|
ESC Waiver Request Letter Required For Approval. Evan Jenkins 794.3958
|
Routing - Design Review | 3/3/2016 | | 3/3/2016 | | PASS |
Andrea Tuning
|
|
|
DRH16-00068
|
Intake Approval | | | 3/3/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 3/3/2016 | | 3/3/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 2/26/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following, Incomplete submittals will not be accepted:
• Previous request not uploaded: Please provide the complete Central District Health forms, page #7 was the only sheet uploaded
|
Intake Approval | | | 2/25/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following, Incomplete submittals will not be accepted:
• Please provide the complete Central District Health forms, page #7 was the only sheet uploaded
• As stated on checklist plan sheet R1.0 not uploaded for Mechanical equipment schedule including designed CFM of outside air
|
Intake Approval | | | 2/16/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following, Incomplete submittals will not be accepted:
• Completed Form #304 – Registered Design Professional
• Form #310 – Statement of Special Inspections must be completed by the design engineer for the sign welds
• Structural calculations stamped and signed by an Idaho licensed engineer not uploaded for the New footing
• Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff
• Central District Health Department (CDHD) provide a completed Food Establishment License application for any building where food is prepared, manufactured or stored . Form is available at: www.cdhd.idaho.gov/EH/food/forms.htm.
• Central District Health Department (CDHD) completed Food Establishment Plan Review and Approval form for any building where food is prepared, manufactured or stored. Form is available at: www.cdhd.idaho.gov/EH/food/forms.htm.
• Planning & Zoning letter(s) of approval – i.e. Conditional Use Permit (CUP), Design Review Permit (DRH) and/or other approval documents
• Stated on checklist plan sheet R1.0 not uploaded for Mechanical equipment schedule including designed CFM of outside air
|
Application received | | | 2/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 14 2016 10:35PM
|