Second Notice | | 7/21/2016 | 8/10/2016 | | DONE |
|
|
|
This permit finaled on the web by Shane Hopkins
|
First Notice | 6/23/2016 | 6/23/2016 | 7/11/2016 | | DONE |
Jim Storey
|
|
|
Mailed 7-12
|
BLD-Final | 6/21/2016 | 6/23/2016 | 6/23/2016 | P | PASS |
Jim Storey
|
|
|
Please call ahead for meet, 20minutes - Jesse Phone #: ###-####
|
DOC - Permit Finaled | 6/23/2016 | 6/23/2016 | 6/23/2016 | P | PASS |
Jim Storey
|
|
|
|
Issue PAID IN FULL permit | | | 3/25/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/25/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/3/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 2/24/2016 | 2/24/2016 | 3/3/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Street Lights | 2/24/2016 | | 3/3/2016 | | PASS |
Mike D Hedge
|
|
|
Signed off per Epan
|
Routing - PLAN CHECK | 3/3/2016 | | 3/3/2016 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 3/3/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/3/2016 | | DONE |
Christina Prado
|
|
|
ALL REQUIRMENTS MET 3-3-16 /CEV
**still needs GC Form & Rev Cert of Value 3-3-16 /CEV
Need GC Form, RP & Revised Certificate of Value for issuance
|
Routing - Erosion and Sediment | 3/1/2016 | | 3/1/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Platt Gardens is a 7 acre Special Use Park located at the Boise Depot, 2602 W. Eastover Terrace. The project scope of work includes constructing a 10' wide concrete sidewalk with stairs that is approximately 640 l.f. and associated landscape improvements. Work will begin once all permits are obtained. The project is anticipated to be completed within one or two months once construction begins.
|
Routing - PLUMBING | 2/24/2016 | | 2/29/2016 | | PASS |
Bill VanDegrift
|
|
|
existing well is for irrigation only
|
Routing - PUBLIC WORKS GRADING | 2/24/2016 | | 2/24/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 2/24/2016 | | 2/24/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Drainage | 2/24/2016 | | 2/24/2016 | | PASS |
Brian Murphy
|
|
|
SIDEWALK ACHD
|
Routing - Design Review | 2/24/2016 | | 2/24/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 2/24/2016 | | 2/24/2016 | | FAIL |
Evan Jenkins
|
|
|
ESC Site Map Required for Approval: Evan Jenkins 794.3958
|
Routing - PLANNING | 2/24/2016 | | 2/24/2016 | | PASS |
Cody Riddle
|
|
|
Current planning approval not required. See DRH.
|
Intake Approval | | | 2/24/2016 | | PASS |
David Ferguson
|
|
|
|
Telephone call | | | 2/19/2016 | | DONE |
|
|
|
Spoke with Shane and he said that he needed the 518 not 502. Informed him to go ahead to fill out the 518, upload it and delete the other application. Told Christina
|
Application received | | | 2/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 15 2016 9:18AM
|
Routing PW Grading-Hillside | 2/24/2016 | | | | CANC |
Jason C. Taylor
|
|
|
No review required. All Landscaping. JCT
|