BLD-Final | 8/30/2016 | 8/31/2016 | 8/31/2016 | A | PASS |
Jim Sly
|
|
|
Call for access // Bob Phone #: ###-####
|
DOC - Permit Finaled | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 5/16/2016 | 5/18/2016 | 5/18/2016 | P | PASS |
Jim Sly
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 5/13/2016 | 5/16/2016 | 5/17/2016 | P | PASS |
Jim Sly
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Jim Sly
|
|
|
Shear // Bob Phone #: ###-####
|
BLD-Conference | 3/18/2016 | 3/18/2016 | 3/20/2016 | P | DONE |
Jim Sly
|
|
|
Jose Phone #: ###-#### After installing drain rock into old septic tank.....OK to pour footing.
|
Inspection Record Card- Bld | | | 3/15/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/15/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/7/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 3/7/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (LEG) Tisha | 2/19/2016 | | 3/4/2016 | | DONE |
Tisha Gallop
|
|
|
3/4
|
Routing - PLAN CHECK | 2/19/2016 | | 3/4/2016 | | PASS |
Tisha Gallop
|
|
|
|
1st review completed | | | 3/4/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2016 | | DONE |
|
|
|
|
Routing - MECHANICAL | 2/19/2016 | | 2/24/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/19/2016 | | 2/19/2016 | | PASS |
Celine Acord
|
|
|
5' landscape buffer required along north property line, then a 15' driveway to match with parcel to the west (4326 Vera); 20' total
|
Routing - Addressing | 2/19/2016 | | 2/19/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/19/2016 | | 2/19/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/19/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/19/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/19/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 2/18/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 18 2016 6:14PM
|