BLD-Final | 5/10/2016 | 5/11/2016 | 5/11/2016 | A | PASS |
Tony Young
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 5/11/2016 | 5/11/2016 | 5/11/2016 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Energy code compliance | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Phil Shearer
|
|
|
would like cal ahead; David Phone #: ###-####
|
BLD-Framing/Rough-in | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Phil Shearer
|
|
|
would like cal ahead; David Phone #: ###-####
|
BLD-Framing/Rough-in | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | PART |
Tony Young
|
|
|
David Phone #: ###-####,, need trades
|
BLD-Framing/Rough-in | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | PART |
Tony Young
|
|
|
David Phone #: ###-####,, floor and exterior ok to cover
|
CHANGE STATUS TO (ISS) | | | 3/18/2016 | | DONE |
|
|
|
customr says they came in and picked the plan mod up. I think it just didn't get changed back to issued
|
Plan assigned to (BJM) | 3/7/2016 | 3/7/2016 | 3/7/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/7/2016 | | 3/7/2016 | | PASS |
Brian McGowan
|
|
|
Resubmitted Engineering
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2016 | | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 3/7/2016 | | DONE |
|
|
|
called Scott to let plan mod is ready-as per Brian McGowan no fees due.
|
Permit Ready to Issue | | | 3/7/2016 | | DONE |
|
|
|
plan mod ready-please do not re issue
|
Plan Modification Accepted | | | 3/7/2016 | | DONE |
|
|
|
plan mod excepted 2 sets of engineering-gave back to Brian Mcgowan
|
Routing Walk-In (BLD) | 2/24/2016 | 2/24/2016 | 2/24/2016 | A | PASS |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 2/24/2016 | | 2/24/2016 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 2/24/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 2/24/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/24/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 2/24/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 2/19/2016 | 2/19/2016 | 2/19/2016 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 2/19/2016 | 2/19/2016 | 2/19/2016 | A | FAIL |
Brian McGowan
|
|
|
Need engineering to show lateral and shear design over conc. slab.
|
1st review completed | | | 2/19/2016 | | FAIL |
Brian McGowan
|
|
|
Need engineering to show lateral and shear design over conc. slab.
|
Routing - PLAN CHECK | 2/19/2016 | | 2/19/2016 | | FAIL |
Brian McGowan
|
|
|
Need engineering to show lateral and shear design over conc. slab.
|
Application received | | 2/19/2016 | | | |
|
|
|
|