VOIDED CHANGE STATUS | | | 5/4/2017 | | DONE |
|
|
|
Work not being done
|
Fees Due Hold | 8/19/2016 | | 9/13/2016 | | DONE |
Kristal Soland
|
|
|
|
BLD-Conference | 8/18/2016 | 8/18/2016 | 8/18/2016 | A | PASS |
Jim Storey
|
|
|
Permit expired yesterday. Customer who pulled the permit said they sold the property and that they didn't do any work. Just need to make sure before expiring the permit. Thank you, Brittany doc expiered
|
DOC - Permit Expired | 8/18/2016 | 8/18/2016 | 8/18/2016 | A | PASS |
Jim Storey
|
|
|
Permit expired yesterday. Customer who pulled the permit said they sold the property and that they didn't do any work. Just need to make sure before expiring the permit. Thank you, Brittany
|
Telephone call | | | 8/8/2016 | | DONE |
|
|
|
Spoke with Robert and he stated that they sold the property and didn't do any construction so let the permit expire.
|
Expiration Notice | 7/25/2016 | 8/15/2016 | 7/25/2016 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 3/16/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 2/22/2016 | 2/22/2016 | 3/16/2016 | | DONE |
Brian McGowan
|
|
|
due 3/4 Failed due to lack of structure details
|
Inspection Record Card- Bld | | | 3/16/2016 | | DONE |
|
|
|
|
Telephone call | | | 3/16/2016 | | DONE |
|
|
|
called Robert- told him permit is ready for pick up and fees due
|
Routing - PLAN CHECK | 3/16/2016 | | 3/16/2016 | | PASS |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/16/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/16/2016 | | DONE |
|
|
|
All Met
|
Plan resubmittals received | | | 3/15/2016 | | DONE |
|
|
|
Two copies of engineering. emailed to Brian
|
Routing - PLAN CHECK | 3/10/2016 | | 3/11/2016 | | FAIL |
Brian McGowan
|
|
|
Beam in basement needs to be engineered (properly sized). Updated ICC-ES Report for ICF walls.
|
Routing - MECHANICAL | 3/10/2016 | | 3/10/2016 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 3/10/2016 | | 3/10/2016 | | PASS |
Andrea Tuning
|
|
|
Approved with red lines.
|
Plan resubmittals received | | | 3/9/2016 | | DONE |
|
|
|
resubmittals received 2 sets of sheets A0, A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, 2 small site plans & 2 ICC-ES evaluation repot-took to Brian McGowan
|
Routing - MECHANICAL | 3/7/2016 | | 3/7/2016 | | FAIL |
Troy James
|
|
|
Left message with owner to explain how his will heat the basement
|
1st review completed | | | 3/2/2016 | | FAIL |
Brian McGowan
|
|
|
Structural details lacking.
|
Routing - PLAN CHECK | 3/2/2016 | | 3/2/2016 | | FAIL |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | | | 3/2/2016 | | FAIL |
Troy James
|
|
|
The designer is going to contact the owner to find out how he is going to heat the house. Unable to determine whether a manual j report is required at this time.
|
Routing - PLANNING | 2/22/2016 | | 3/1/2016 | | FAIL |
Andrea Tuning
|
|
|
Garage does nto meet rear setback,
curb, gutter and sidewalk are required on local streets,
a license agreement is required for the fence.
|
Routing - Addressing | 2/19/2016 | | 2/22/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2016 | | 2/22/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plan assigned to (LEG) Tisha | 2/19/2016 | | 2/22/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/19/2016 | | DONE |
|
|
|
|
Intake Approval | | | 2/19/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/19/2016 | | DONE |
|
|
|
|
Application received | | 2/19/2016 | | | |
|
|
|
|