Route to Impact Fee Review | 6/6/2017 | 6/9/2017 | 6/7/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
Print Statement | | | 3/15/2017 | | DONE |
|
|
|
|
First Notice | 2/17/2017 | 2/17/2017 | 3/9/2017 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | PASS |
Jim Storey
|
|
|
Richard Phone #: ###-####
|
DOC - Permit Finaled | 2/17/2017 | 2/17/2017 | 2/17/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | FAIL |
Mike Jordan
|
|
|
Richard Phone #: ###-####. East exterior door exterior landing not at same elevation as interior slab. Correction notice issued.
|
Zoning Approval | 12/6/2016 | 12/6/2016 | 12/6/2016 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Remove the thumbturn deadbolt as discussed prior to a building inspection
|
BLD-Framing/Rough-in | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Dave Hannah
|
|
|
Richard Phone #: ###-####
|
BLD-Framing/Rough-in | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | PART |
Mike Jordan
|
|
|
Richard Phone #: ###-####. 1hr. soffit has been repaired, ok to cover. Needs to provide the engineering for the repair of trusses.
|
BLD-Final | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | NR |
Jim Storey
|
|
|
Richard Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PART |
Jim Storey
|
|
|
Richard Phone #: ###-#### trusses ok fire soffit not on east wall
|
BLD-Wall Bracing | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | PASS |
Mike Jordan
|
|
|
Shear // Richard Phone #: ###-####
|
BLD-Foundation | 3/31/2016 | 4/1/2016 | 4/1/2016 | P | PASS |
Jim Sly
|
|
|
dane Phone #: ###-####
|
BLD-Footing | 3/30/2016 | 3/31/2016 | 3/31/2016 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Noted interior step footing on edge of step, not enough bearing, too much sluff off. Will either move interior footing if possible or make interior footing wider.
|
Issue PAID IN FULL permit | | | 3/29/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/28/2016 | | |
|
|
|
|
Routing PW Sewer Design | 3/28/2016 | | 3/28/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLAN CHECK | 3/17/2016 | | 3/28/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/28/2016 | | DONE |
|
|
|
Needs; GC Form & Revised Cert of Value 3-29-16 /CEV
Need RP, GC FORM AND REVISED CERT OF VALUE
|
Plan assigned to (TLW) | 3/3/2016 | | 3/28/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Design Review | 3/22/2016 | | 3/22/2016 | | PASS |
Josh Wilson
|
|
|
Ok per revised elevations
|
Routing PW Drainage | 3/3/2016 | | 3/17/2016 | | PASS |
Brian Murphy
|
|
|
EXISTING SYSTEM PAD SITE PREVIOUS APPROVAL
|
Routing - PLANNING Land Div | 3/3/2016 | | 3/17/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan. TLW
|
Plan resubmittals received | | | 3/17/2016 | | DONE |
|
|
|
|
1st review completed | | | 3/17/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 3/3/2016 | | 3/16/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Solid Waste | 3/3/2016 | | 3/16/2016 | | PASS |
Megan Durrell
|
|
|
Approved in E-Plan. TLW
|
Routing PW Sewer Design | 3/3/2016 | | 3/10/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Show connection to public sewer.
|
Routing - PLAN CHECK | 3/3/2016 | | 3/7/2016 | | FAIL |
Tim L. Woodard
|
|
|
Architect has requested the review be delayed (Pam Gaines). TLW
|
Routing - PLUMBING | 3/3/2016 | | 3/4/2016 | | PASS |
Daryl Spivey
|
|
|
no plumbing
|
Routing - FIRE | 3/3/2016 | 3/3/2016 | 3/3/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Erosion and Sediment | 3/3/2016 | | 3/3/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(Honeymoon Cove - East Building) New construction of a 5,395 square foot office building, shell only. Exterior walls are stucco, siding, and manufactured stone on 2x6 wood construction. Roof consists of a composite tile shingle over pre-engineered trusses.
|
Routing - Design Review | 3/3/2016 | | 3/3/2016 | | FAIL |
Josh Wilson
|
|
|
Submit revised drawings which comply with Condition 1a from DRH15-00323 which states: "Further articulate the central mass of the north elevation with additional modulation, a canopy element, or other design features."
|
Routing - Addressing | 3/3/2016 | | 3/3/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/3/2016 | | 3/3/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 3/3/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 3/3/2016 | | 3/3/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 2/25/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following, Incomplete submittals will not be accepted:
1. Checklist must be completed by the project’s Idaho-licensed design professional of record (or applicant if design professional not required) uploaded with the plans and documents,
2. The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
3. Soils and geotech report for support of the structure stamped and signed by an Idaho licensed engineer or declare on plans the default seismic site class & soil bearing per IBC
4. Soils and geotech report for infiltration systems stamped and signed by an Idaho licensed civil engineer, geologist, or soil scientist
5. Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff
6. Site specific fire flow at hydrants letter from United Water or other public water provider. Include static pressure if sprinklers are to be installed.
7. Please provide owners signature on Form #310 – Statement of Special Inspections.
|
Application received | | | 2/22/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 22 2016 12:46PM
|