BLD-Final | 6/8/2017 | 6/12/2017 | 6/12/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Ellioiott
|
DOC - Permit Finaled | 6/12/2017 | 6/12/2017 | 6/12/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####
|
BLD-Foundation | 4/1/2016 | 4/4/2016 | 4/4/2016 | A | PASS |
Tony Young
|
|
|
Elliott Phone #: ###-####
|
BLD-Footing | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Tony Young
|
|
|
Tony Phone #: ###-####
|
Routing Walk-In (BLD) | 3/17/2016 | 3/17/2016 | 3/17/2016 | P | PASS |
Tisha Gallop
|
|
|
change size of continuous footing to 16x8. (cont. footing under addition was not included in engineering) // no fee
|
Case Summary (BLD) | | | 3/17/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/29/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 2/26/2016 | | |
|
|
|
|
Plan assigned to (JG) | 2/23/2016 | 2/23/2016 | 2/26/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, Residential Elliot Todd
|
Routing - PLAN CHECK | 2/26/2016 | | 2/26/2016 | | PASS |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2016 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 2/26/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/26/2016 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 2/26/2016 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2016 | | DONE |
|
|
|
Spoke with Todd informing him that his permit is ready. He asked about ELE and PLM. I informed him that he would have to fill out the applications for those, but if he would like he could do that when he picks up this permit and pay for it all at one time.
|
Routing Walk-In (Zoning) | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | FAIL |
Javier Guzman
|
|
|
needed engineering
|
1st review completed | | | 2/23/2016 | | FAIL |
Javier Guzman
|
|
|
Need engineering calcs with stamp
|
Application received | | 2/23/2016 | | | |
|
|
|
|