Third Notice | | 3/14/2017 | 4/13/2017 | | DONE |
Christina Prado
|
|
|
mailed 4/14
|
Third Notice | | 2/18/2017 | 3/9/2017 | | DONE |
Christina Prado
|
|
|
mailed 3/10/17
|
Second Notice | | 1/20/2017 | 2/13/2017 | | DONE |
|
|
|
Mailed 2-14-17
|
First Notice | | 11/18/2016 | 1/10/2017 | | DONE |
|
|
|
sent in mail 1-11-2017
|
BLD-Final | 11/7/2016 | 11/8/2016 | 11/8/2016 | P | PASS |
Jim Sly
|
|
|
Zhi// please call ahead Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 11/8/2016 | | DONE |
|
|
|
|
BLD-Final | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | FAIL |
Mike Jordan
|
|
|
Zhi// please call ahead Phone #: ###-####. Provide vertical grab bars in restroom lower mirors and provide correct grab bars on back wall above toilets.
|
FIRE-Final Inspection | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 6/29/2016 | 6/30/2016 | 7/1/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware at the exterior exit doors per approved plans sheets A-2 and A-4, Repair the tow exit signs in the Banquet Room, Provide exit signs at the openings into the Corridor per approved plan sheet E-2, Provide revised plans to plan review showing door/wall separating Hallway1 from Hallway 3, new Room at Walk-in Freezer and walll delete at Womens Restroom and Hallway 1, Post revised Occupant Load Sign for 309
|
Plan assigned to (CJW) | 5/4/2016 | | 5/6/2016 | | PASS |
Carl Westfall
|
|
|
Plan mod - China Grand
|
Routing - PLAN CHECK | 5/4/2016 | | 5/6/2016 | | PASS |
Carl Westfall
|
|
|
2nd plan mod approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/6/2016 | | DONE |
|
|
|
PLEASE do no re issue
|
Telephone call | | | 5/6/2016 | | DONE |
|
|
|
called Anthony to let know plan mod is ready and how much is owed
|
CHANGE STATUS TO (ISS) | | | 5/6/2016 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 5/6/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 5/4/2016 | | DONE |
|
|
|
Two copies of A-3, A-4, A-5, A-6 Taken to Carl W
|
Permit Ready to Issue | | | 4/28/2016 | | DONE |
|
|
|
do NOT re-issue; plan mod fees due
|
Telephone call | | | 4/28/2016 | | DONE |
|
|
|
notified customer that permit is ready
|
CHANGE STATUS TO (ISS) | | | 4/28/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/28/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/18/2016 | 4/18/2016 | 4/27/2016 | | PASS |
Carl Westfall
|
|
|
China Grand Buffett - plan mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/26/2016 | | 4/27/2016 | | DONE |
Carl Westfall
|
|
|
|
BLD-Framing/Rough-in | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | PART |
Jim Sly
|
|
|
Zhi ###-#### Soffits appear OK in adjacent existing room.
|
Routing - PLUMBING | 4/21/2016 | | 4/26/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing PW Environmental | 4/21/2016 | | 4/22/2016 | | PASS |
Terry Alber
|
|
|
|
Routing - PUBLIC WORKS | 4/21/2016 | | 4/21/2016 | | PASS |
Rachael Beierle
|
|
|
plan mod 4" waste trench and freezer condensate sink added
|
Routing PW Sewer Rating | 4/21/2016 | | 4/21/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLAN CHECK | 4/18/2016 | | 4/21/2016 | | PASS |
Carl Westfall
|
|
|
|
BLD-Framing/Rough-in | 4/18/2016 | 4/19/2016 | 4/19/2016 | P | FAIL |
Jim Sly
|
|
|
would like call ahead; Zhi Phone #: ###-#### C/N Mens restroom Measures 8'3' x 5'4" in lieu of 8'3"x6'6" as shown on approved plan. Architect to advise.
|
Plan Modification Accepted | | | 4/18/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/18/2016 | | 4/18/2016 | | PASS |
Carl Westfall
|
|
|
Plan Mod. Two sheets of P-1. Taken to Car W
|
BLD-Framing/Rough-in | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PART |
Jim Sly
|
|
|
Zeng-soffits-please call please 30 prior for access Phone #: ###-#### Soffits OK.
|
Issue PAID IN FULL permit | | | 3/24/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/24/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/21/2016 | | DONE |
|
|
|
*******requirements met 3/24/16 CAN*****need GC and rev cert of val
|
Telephone call | | | 3/21/2016 | | DONE |
|
|
|
Spoke with Barbara informing her that the permit is ready to be picked up and that the GC would need to fill out the 302 and 306 before we can put in the fees
|
Plan assigned to (CJW) | 2/25/2016 | 2/25/2016 | 3/18/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) (Mar 15 - 15 days) GRAND CHINA BUFFET - Level 3 TI - Paper
|
Routing - FIRE | 3/17/2016 | | 3/18/2016 | | PASS |
Scott Arellano
|
|
|
See IBC plan review report.
|
1st review completed | | | 3/18/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/3/2016 | | 3/17/2016 | | PASS |
Carl Westfall
|
|
|
IBC plan review completed
|
Routing - MECHANICAL | | | 3/3/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/26/2016 | | 3/2/2016 | | PASS |
Bill VanDegrift
|
|
|
ASSE 1070 mixing valves required at the public lavs
|
Routing - Addressing | 2/25/2016 | | 2/26/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | | | 2/26/2016 | | PASS |
|
|
|
|
Pending Assignment by JCB | 2/25/2016 | | 2/25/2016 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 2/24/2016 | | DONE |
|
|
|
|
Intake Approval | | | 2/24/2016 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/24/2016 | | DONE |
|
|
|
|
Application received | | 2/23/2016 | | | |
|
|
|
|