BLD-Final | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PASS |
Phil Shearer
|
|
|
Joe Phone #: ###-####
|
FIRE-Final Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items with the fire sprinkler system have been addressed. Life fire safety passed/complete
|
BLD-Final | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | NR |
Phil Shearer
|
|
|
Joe Phone #: ###-####
|
FIRE-Final Inspection | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be able to pass when the column protection is addressed. Per Greg, the sprinkler designer, Class IV commodities can not be stored on the racks with out meeting item #1 of NFPA 13 16.4.1. The tenant stated that the Class IV commodities will be stored on the floor. If that will be the case the drawings will need to be resubmitted showing the storage arrangements of the Class IV items. This would include location, aisle widths and size of solid pile including the height and width.
Upon further conversation with the tenant it appears that a separate permit will be pulled to add sprinkler protection at the columns to meet item #1 of NFPA 13 16.4.1.
|
BLD-Final | 3/22/2016 | 3/24/2016 | 3/24/2016 | A | CANC |
Phil Shearer
|
|
|
Joe Phone #: ###-####///will call back in once FIR inspection passes
|
FIRE-Final Inspection | 3/22/2016 | 3/23/2016 | 3/23/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans and notes, provide verification of column protection per NFPA 13 16.1.4
|
(F) Reprint permit | | | 3/23/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/15/2016 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2016 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JG) | 3/7/2016 | 3/7/2016 | 3/14/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, evel 2 TI - ePlanReview - DB Schenker Racking
|
Routing - PLAN CHECK | 3/14/2016 | | 3/14/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/14/2016 | | DONE |
Christina Prado
|
|
|
All requirements met///C_P**Need Revised certificate of value for issuance
|
Routing - PLAN CHECK | 3/7/2016 | | 3/11/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
1st review completed | | | 3/11/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - FIRE | 3/7/2016 | 3/7/2016 | 3/8/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Pending Assignment by JCB | 3/7/2016 | | 3/7/2016 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 3/4/2016 | | DONE |
|
|
|
The fire sprinkler system appears to be adequate for the intended storage and storage configuration. ---TRF 3/04/2016---
|
Intake Approval | | | 3/4/2016 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Tim Frost and plan review fees paid.
|
Plan Reviewer's activity | | | 2/29/2016 | | DONE |
|
|
|
Emailed a failed prescreen review.
|
Application received | | | 2/24/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 24 2016 11:07AM
|