Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-00559
StatusIssued
Name JADI INSTALLERS LLC
Site Address 2260 S COLE RD Unit: 150
Project NameDB Schenker Racking
Customer Number 
ePlanReviewYes
Description
(DB SCHENKER)(RACKING)(SUITES 130, 140, 150) Permit to install steel storage racking exceeding 8' in height within the recent warehouse expansion space per approved plans and structural engineering. Approval of this permit is contingent on adhering to approved plans and engineering. Work to include: installation of prefabricated 16 foot storage racking, including seismic bolting to existing slab, the design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. The structural design by Structural Concepts, Engineering is attached. Note: special inspection required for anchors **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/11/20164/12/20164/12/2016APASS
DetailsPhil Shearer
Joe Phone #: ###-####
FIRE-Final Inspection4/8/20164/8/20164/8/2016APASS
DetailsJim Page
Previously noted items with the fire sprinkler system have been addressed. Life fire safety passed/complete
BLD-Final3/24/20163/25/20163/25/2016ANR
DetailsPhil Shearer
Joe Phone #: ###-####
FIRE-Final Inspection3/24/20163/24/20163/24/2016PFAIL
DetailsTroy Cobbley
Life safety will be able to pass when the column protection is addressed. Per Greg, the sprinkler designer, Class IV commodities can not be stored on the racks with out meeting item #1 of NFPA 13 16.4.1. The tenant stated that the Class IV commodities will be stored on the floor. If that will be the case the drawings will need to be resubmitted showing the storage arrangements of the Class IV items. This would include location, aisle widths and size of solid pile including the height and width.

Upon further conversation with the tenant it appears that a separate permit will be pulled to add sprinkler protection at the columns to meet item #1 of NFPA 13 16.4.1.
BLD-Final3/22/20163/24/20163/24/2016ACANC
DetailsPhil Shearer
Joe Phone #: ###-####///will call back in once FIR inspection passes
FIRE-Final Inspection3/22/20163/23/20163/23/2016PFAIL
DetailsTroy Cobbley
Provide city approved plans and notes, provide verification of column protection per NFPA 13 16.1.4
(F) Reprint permit  3/23/2016 DONE
Issue PAID IN FULL permit  3/15/2016 DONE
DetailsChristina Prado
Inspection Record Card- Bld  3/15/2016 DONE
DetailsChristina Prado
Plan assigned to (JG)3/7/20163/7/20163/14/2016 PASS
DetailsJavier Guzman
1st review completed, evel 2 TI - ePlanReview - DB Schenker Racking
Routing - PLAN CHECK3/14/2016 3/14/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  3/14/2016 DONE
Permit Ready to Issue  3/14/2016 DONE
DetailsChristina Prado
All requirements met///C_P**Need Revised certificate of value for issuance
Routing - PLAN CHECK3/7/2016 3/11/2016 FAIL
DetailsJavier Guzman
ePlan
1st review completed  3/11/2016 FAIL
DetailsJavier Guzman
ePlan
Routing - FIRE3/7/20163/7/20163/8/2016 PASS
DetailsKatie Marron
Comments attached to case.
Pending Assignment by JCB3/7/2016 3/7/2016 DONE
DetailsJason Blais
Plan Reviewer's activity  3/4/2016 DONE
The fire sprinkler system appears to be adequate for the intended storage and storage configuration. ---TRF 3/04/2016---
Intake Approval  3/4/2016 PASS
DetailsJason Blais
Prescreen approved by Tim Frost and plan review fees paid.
Plan Reviewer's activity  2/29/2016 DONE
Emailed a failed prescreen review.
Application received  2/24/2016 DONE
Application submitted via PDS Online on Feb 24 2016 11:07AM