DOC - Permit Finaled | | | 7/6/2016 | | DONE |
|
|
|
as per Jim Sly-final was passed
|
BLD-Final | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | PASS |
Jim Sly
|
|
|
Andrea Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/11/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/8/2016 | | |
|
|
|
|
Telephone call | | | 3/8/2016 | | DONE |
|
|
|
called Andrea to let know permit is ready-need sewer cap
|
Permit Ready to Issue | | | 3/8/2016 | | DONE |
|
|
|
sewer cap
|
Routing - Erosion and Sediment | 3/7/2016 | | 3/8/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Demo/Earth Disturbance)
To demolish (Commercial)all buildings at above location in accordance with owner's agreement and $60,000.00 Bond on file.
This permit is issued subject to inspector's approval of the sewer cap and site preparation prior to any grading or filling. Note: The Environmental Protection Agency must be notified 10 working days in advance for all renovations that disturb 260 lineal feet/160 square feet/35 cubic feet of asbestos containing materials.
|
Telephone call | | | 2/29/2016 | | DONE |
|
|
|
called Andrea to let know we still need the SWPPP and that the
|
Application received | | 2/25/2016 | | | |
|
|
|
|
Routing - FRONT DESK | 3/8/2016 | | | | |
|
|
|
|