BLD-Conference | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Jim Sly
|
|
|
Final Please call Dan for access ###-#### Phone #: ###-#### Inspection requested via web by Paul Bushman
|
DOC - Permit Finaled | 6/14/2016 | 6/14/2016 | 6/14/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Wall cover | 4/14/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Paul Bushman
|
BLD-Conference | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | DONE |
Jim Sly
|
|
|
Access thru window in back Shear, framing, and infiltration Phone #: ###-#### Inspection requested via web by Paul Bushman Exterior shear nailing, and framing OK. OK to insulate.
|
BLD-Conference | 3/30/2016 | 3/30/2016 | 3/30/2016 | P | PASS |
Jim Sly
|
|
|
Footings Phone #: ###-#### Inspection requested via web by Paul Bushman
|
BLD-Conference | 3/13/2016 | 3/14/2016 | 3/14/2016 | A | PASS |
Jim Sly
|
|
|
Erosion Please call and I will meet you there. Thanks paul Phone #: ###-#### Inspection requested via web by Paul Bushman
|
OVERRIDE | | | 2/25/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 2/25/2016 | 2/25/2016 | 2/25/2016 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 2/25/2016 | 2/25/2016 | 2/25/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 2/25/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/25/2016 | | 2/25/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 2/25/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 2/25/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/25/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/25/2016 | | DONE |
|
|
|
|
Application received | | 2/25/2016 | | | |
|
|
|
|