BLD-Final | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Jim Storey
|
|
|
Malloya Phone #: ###-####
|
DOC - Permit Finaled | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Mike Jordan
|
|
|
Malloya Phone #: ###-####
|
BLD-Energy code compliance | 3/17/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Mike Jordan
|
|
|
Malloya Phone #: ###-####
|
Routing Walk-In (BLD) | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/26/2016 | | 2/26/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 2/26/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/26/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 2/26/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | FAIL |
David Ferguson
|
|
|
Need additional details to show compliance with IECC, how he is constructing his raised floor system, and header sizes.
|
1st review completed | | | 2/25/2016 | | FAIL |
David Ferguson
|
|
|
|
Application received | | 2/25/2016 | | | |
|
|
|
|