BLD-Foundation | 5/11/2016 | 5/11/2016 | 5/12/2016 | P | PASS |
Dave Hannah
|
|
|
Annie Phone #: ###-####
|
PubWorks Subgrade Approval | 5/9/2016 | 5/9/2016 | 5/9/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the retaining wall subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 5/5/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Dave Hannah
|
|
|
Annie Phone #: ###-####
|
BLD-Footing | 5/4/2016 | 5/4/2016 | 5/5/2016 | P | PART |
Dave Hannah
|
|
|
Annie Phone #: ###-####
|
PubWorks Subgrade Approval | 5/4/2016 | 5/4/2016 | 5/4/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 4/27/2016 | 4/28/2016 | 4/28/2016 | P | NR |
Dave Hannah
|
|
|
Annie Phone #: ###-#### needs geo tech on soils
|
Issue PAID IN FULL permit | | | 3/2/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/1/2016 | | |
|
|
|
|
OVERRIDE | | | 3/1/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 2/25/2016 | 2/25/2016 | 3/1/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/25/2016 | | 3/1/2016 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 3/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/1/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/1/2016 | | DONE |
|
|
|
NEED applicant to complete application and NEED RP- Thad's is expired
|
Telephone call | | | 3/1/2016 | | DONE |
|
|
|
called Thad- left message that permit is ready and fees due- also stated need RP and application needs to be completed
|
Routing - Erosion and Sediment | 2/25/2016 | | 2/29/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map submitted and approved. Valid RP and PD designated.
|
Routing PW Grading-Hillside | 2/25/2016 | | 2/26/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | PASS |
Colleen T Carroll
|
|
|
In the hillside. Jason knows he is here
|
Application received | | 2/25/2016 | | | |
|
|
|
|