BLD-Final | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Jim Sly
|
|
|
Frank Phone #: ###-####
|
DOC - Permit Finaled | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | NR |
Jim Sly
|
|
|
Frank Phone #: ###-#### Need Electr. Plumbing, Smoke Det, CO2.
|
BLD-Conference | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | DONE |
Jim Sly
|
|
|
Frank Phone #: ###-#### Work in Progress
|
BLD - Request for Extension | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Jim Sly
|
|
|
Frank (son-in-law) Phone #: ###-####
|
BLD - Request for Extension | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Jim Sly
|
|
|
Frank-Jeffs the father Phone #: ###-####
|
BLD-Energy code compliance | 12/16/2016 | 12/16/2016 | 12/16/2016 | P | PASS |
Jim Sly
|
|
|
Insulation // Frank Phone #: ###-#### Frame and Energy pass in Master bed, Kitch and Utility.
|
BLD-Wall Bracing | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | PASS |
Jim Sly
|
|
|
Frank Phone #: ###-####
|
BLD-Footing | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Phil Shearer
|
|
|
Frank Phone #: ###-####
|
OVERRIDE | | | 3/4/2016 | | |
|
|
|
|
Telephone call | | | 3/4/2016 | | DONE |
|
|
|
called customer and notified that permit is ready
|
Issue PAID IN FULL permit | | | 3/4/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/4/2016 | | 3/4/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/4/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/4/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/4/2016 | | DONE |
|
|
|
all requirments met
|
Routing Walk-In (BLD) | 3/3/2016 | 3/3/2016 | 3/3/2016 | A | FAIL |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 2/25/2016 | 2/25/2016 | 3/3/2016 | P | DONE |
Candy A. Nichols
|
|
|
|
1st review completed | | | 3/3/2016 | | FAIL |
Brian McGowan
|
|
|
Proposed roof layout does not work. Need beam sizes.
|
Routing - PLAN CHECK | 3/3/2016 | | 3/3/2016 | | FAIL |
Brian McGowan
|
|
|
Proposed roof layout does not work. Need beam sizes.
|
Routing Walk-In (Zoning) | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | DONE |
Sue Cummings
|
|
|
|
Application received | | 2/25/2016 | | | |
|
|
|
|