Third Notice | | 10/17/2017 | 10/16/2017 | | DONE |
|
|
|
This permit finaled on the web by troy skidmore
|
Third Notice | | 9/25/2017 | 10/12/2017 | | DONE |
|
|
|
Mailed 10-13-17
|
Second Notice | | 8/20/2017 | 9/20/2017 | | DONE |
|
|
|
|
First Notice | | 7/28/2017 | 8/10/2017 | | DONE |
|
|
|
Mailed 8-11-17
|
Print Occupancy Form | | | 7/18/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/18/2017 | | DONE |
|
|
|
|
BLD-Final | 7/15/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Jim Sly
|
|
|
Troys notes should be for other mall project he was working on at the same time. I'm pretty sure that this is finaled by Troy.
|
BLD-Final | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | NR |
Jim Sly
|
|
|
Troy Phone #: ###-####
|
FIRE-Final Inspection | 7/15/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIRE-Final Inspection | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Alarm Testing | 7/13/2016 | 7/13/2016 | 7/13/2016 | P | PART |
Troy Cobbley
|
|
|
Intent was to test the smoke evacuation system but it appears to be wired incorrectly. Exit signs and emergency lighting functioned correctly.
|
BLD-Conference | 7/1/2016 | 7/1/2016 | 7/1/2016 | A | CANC |
Mike Jordan
|
|
|
framing inspection. doing electrical and framing today. Phone #: ###-#### Inspection requested via web by troy skidmore
|
BLD-Framing/Rough-in | 7/1/2016 | 7/1/2016 | 7/1/2016 | P | PASS |
Mike Jordan
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/30/2016 | | DONE |
|
|
|
Plan Mod
|
Plan assigned to (JG) | 6/23/2016 | 6/23/2016 | 6/29/2016 | | PASS |
Javier Guzman
|
|
|
Plan Mod (FOREVER FLAWLESS)(BOISE TOWNE SQUARE- SPACE 2151)
|
Routing - PLAN CHECK | 6/29/2016 | | 6/29/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/29/2016 | | DONE |
|
|
|
Please Do NOT re-issue
|
BLD-Framing/Rough-in | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | FAIL |
Mike Jordan
|
|
|
Troy Phone #: ###-####. Needs rough in inspections first. Also needs to resubmit plan to reflect the in place construction. Called Troy at above number, have not received a call back yet.
|
Plan Modification Accepted | | | 6/23/2016 | | DONE |
Christina Prado
|
|
|
Plan Mod requested to update the floor plan to show existing restroom and move entry door the VIP spaces
|
Issue PAID IN FULL permit | | | 5/4/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/4/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 3/31/2016 | 3/31/2016 | 4/22/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 4/13 L2 BTS #2151 Forever Flawless ePLan
|
Routing - PLAN CHECK | 4/22/2016 | | 4/22/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/22/2016 | | DONE |
|
|
|
***all requirments met 5-4-16 /CEV
Needs; GC Form & Rev Cert of Value
|
Routing - PLAN CHECK | 3/31/2016 | | 4/11/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
1st review completed | | | 4/11/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 3/31/2016 | | 4/1/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 3/31/2016 | | 3/31/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 3/31/2016 | | PASS |
David Ferguson
|
|
|
|
Intake Approval | | | 3/9/2016 | | FAIL |
David Ferguson
|
|
|
Please finish filling out pages 5 & 6 of form #518. Also, you'll notice on those pages it asks for energy code compliance which would be required for the proposed lighting replacement. In addition, it appears that you're adding two sinks. Page #6 of the checklist addresses what documents need to be provided for this.
|
Intake Approval | | | 2/26/2016 | | FAIL |
David Ferguson
|
|
|
The City of Boise requires that you fill out and submit a completed #518 - Minor Tenant Improvement Submittal Checklist that can be found on our website. While filling out this form, you'll notice that your scope of work might also require you to submit form #304 and your plans be stamped by a registered professional licensed in the State of Idaho (not California). In addition, I do not see a demolition plan that shows the current wall configuration of the tenant space. The checklist asks for this if there is demolition work to be performed.
|
Application received | | | 2/25/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 25 2016 3:04PM
|